SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $59,116,610 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2017-2018 for the purpose of capital improvement projects for the thirteenth senatorial district, as follows:
1. Central Middle School
A. Repaint the interior walls of campus facilities; ground and site improvements; and equipment and appurtenances.
Plans $1,000
Design $1,000
Construction $250,000
Total funding $252,000
B. Install new stage lighting for school auditorium.
Plans $1,000
Design $20,000
Construction $100,000
Total funding $121,000
2. Farrington High School
A. Phase II of redesign project; new gymnasium/music building.
Design $2,000,000
Total funding $2,000,000
3. Kapalama Elementary School
A. Repave and restripe school parking
lot. $250,000
Total funding $250,000
4. McKinley High School
A. General improvements to Historic Mall and buildings. Install concrete walkways on each side of Building A and surrounding flagpole (X-formation). Improve paved roadways surrounding Oval and Mall and concrete edges of Mall. Install twenty new banyan trees to replace diseased trees on Mall.
Plans $50,000
Design $50,000
Construction $300,000
Total funding $400,000
B. General improvements to baseball field. Install concrete sidewalks near dugouts and field entry points. Install a paved parking lot, scoreboard, and sprinkler system.
Plans $50,000
Design $100,000
Construction $200,000
Equipment $50,000
Total funding $400,000
C. Improvements to M.M. Scott Auditorium (Building A). Provide and install additional balcony seats. Install balcony railing that meets current building codes. Improve sound room and stage lighting.
Plans $50,000
Design $100,000
Construction $300,000
Total funding $450,000
D. 21st Learning Spaces for Digital Media, Design, & Innovation Exhibition. Digital Media Center to include classroom/lab space, studio, and sound booths. Design & Innovation Center to include classroom/lab space, studio, and shop area. Exhibition area to include space for robotics arena, art gallery, science fair, and school events.
Plans $100,000
Design $300,000
Construction $1,000,000
Equipment $500,000
Total funding $1,900,000
5. Princess Ka‘iulani Elementary School
A. Install water access to plant and sustain a native Hawaiian garden adjacent to Princess Ka‘iulani's banyan tree.
Design $20,000
Construction $70,000
Total funding $90,000
6. Roosevelt High School
A. New gymnasium building to provide updated facilities, additional classroom space, parking, and better traffic flow area for drop-off and pickup.
Plans $200,000
Design $200,000
Construction $13,000,000
Equipment $500,000
Total funding $13,900,000
B. New music building to provide updated facilities and create multiple music rooms.
Plans $150,000
Design $150,000
Construction $10,000,000
Equipment $200,000
Total funding $10,500,000
7. Hawaii Theatre Center
A. Replace interior lights with LED lights and upgrade dimming system.
Equipment $724,000
Total funding $724,000
B. Replace exterior lights with LED lights.
Equipment $126,000
Total funding $126,000
8. State Capitol, Honolulu, Oahu
A. Upgrade water circulation system and replace the lining system in the reflecting pools.
Plans $1,000
Design $1,199,000
Construction $13,999,000
Equipment $1,000
Total funding $15,200,000
9. H-1 Freeway Cap Park, Honolulu, Oahu
A. Feasibility study for an overpass "cap park" over H-1 freeway to extend between Nuuanu stream and Queen Emma street to reduce traffic noise pollution and use park for community purposes.
Study $2,100,000
Total funding $2,100,000
10. Hawaii State Public Library, Honolulu, Oahu
A. Replace tile and flat and drain liner on roof. $2,932,030
B. Replace one air conditioning system (120 EA FCUs). $4,780,500
C. Upgrade two elevators. $897,790
D. Upgrade fire alarm system. $317,930
Total funding $8,928,250
11. Liliha Public Library
A. Replace air conditioner's seventy-ton chiller and two AHUs. $662,750
B. Replace diamond head retaining wall/slab and fix interior wall cracks and wall cracks at facade front stairs. $836,610
C. Add new walkway and repair north slab. $117,910
D. Install fire alarm system. $158,090
Total funding $1,775,360
SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2020, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act as follows:
(1) The sums appropriated in items 1 through 6 shall be expended by the department of education;
(2) The sums appropriated in items 7 and 8 shall be expended by the department of accounting and general services;
(3) The sum appropriated in item 9 shall be expended by the department of transportation; and
(4) The sums appropriated in items 10 and 11 shall be expended by the board of education.
SECTION 4. This Act shall take effect on July 1, 2017.
INTRODUCED BY: |
_____________________________ |
|
|
|
|
|
|
Report Title:
CIP; Thirteenth Senatorial District; Appropriation
Description:
Appropriates funds for capital improvement projects in the thirteenth senatorial district.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.