SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2017-2018:
1. To be expended by the department of accounting and general services:
A. Lyman Museum, Hawaii
Plans, design, construction, and equipment to replace the copper gutters and downspouts with stainless steel in the main museum building.
Plans $1,000
Design $1,000
Construction $30,000
Equipment $170,000
Total funding $202,000
B. Lyman Museum, Hawaii
Plans, construction, and equipment to repair spalling on the front exterior wall of the main museum building.
Plans $1,000
Construction $30,000
Equipment $2,000
Total funding $33,000
C. Lyman Museum, Hawaii
Plans, design, construction, and equipment to repair the rock foundation walls and lanai of the historic mission house.
Plans $25,000
Design $1,000
Construction $30,000
Equipment $5,000
Total funding $61,000
D. Lyman Museum, Hawaii
Plans, design, construction, and equipment to enclose and install air conditioning in the off-site workshop for needed temperature-controlled storage.
Plans $1,000
Design $1,000
Construction $10,000
Equipment $70,000
Total funding $82,000
2. To be expended by the department of education:
A. Chiefess Kapiolani elementary school, Hawaii
Design and construction to install a split air conditioning system in the library.
Design $50,000
Construction $400,000
Total funding $450,000
B. Ernest Bowen DeSilva elementary school, Hawaii
Design and construction to install a split air conditioning system in the library.
Design $50,000
Construction $400,000
Total funding $450,000
C. Hilo high school, Hawaii
Design and construction to renovate building B including the auditorium and restrooms.
Design $500,000
Construction $10,000,000
Total funding $10,500,000
D. Hilo high school, Hawaii
Design and construction to upgrade the track and field.
Design $350,000
Construction $6,000,000
Total funding $6,350,000
E. Hilo intermediate school, Hawaii
Design and construction to replace the lockers and showers in the boys and girls locker rooms.
Design $450,000
Construction $4,350,000
Total funding $4,800,000
F. Keaukaha elementary school, Hawaii
Design and construction for a covered walkway from the cafeteria to the parking lot.
Design $60,000
Construction $300,000
Total funding $360,000
G. Laupahoehoe community public charter school, Hawaii
Design and construction to install a handicap ramp from the elementary school wing to the main campus.
Design $80,000
Construction $500,000
Total funding $580,000
H. Waiakea high school, Hawaii
Design, construction, and equipment to install telescopic bleachers and refinish the floors in the gym.
Design $50,000
Construction $100,000
Equipment $1,000,000
Total funding $1,150,000
I. Waiakea high school, Hawaii
Design and construction to resurface the tennis courts and replace the surrounding fence.
Design $50,000
Construction $1,400,000
Total funding $1,450,000
J. Waiakea high school, Hawaii
Design and construction to install a bus ramp in the upper student parking lot.
Design $70,000
Construction $600,000
Total funding $670,000
K. Waiakea intermediate school, Hawaii
Design and construction to install a split air conditioning system in the library.
Design $50,000
Construction $400,000
Total funding $450,000
L. Waiakea intermediate school, Hawaii
Design and construction to upgrade building K, which is currently a woodshop, to a science classroom.
Design $150,000
Construction $800,000
Total funding $950,000
M. Waiakeawaena elementary school, Hawaii
Plans, design, construction, and equipment for two new portables due to the increase in enrollment.
Plans $10,000
Design $10,000
Construction $200,000
Equipment $10,000
Total funding $230,000
N. Waiakeawaena elementary school, Hawaii
Plans, design, construction, and equipment for a new cafeteria.
Plans $10,000
Design $10,000
Construction $12,000,000
Equipment $100,000
Total funding $12,120,000
O. Waiakeawaena elementary school, Hawaii
Design and construction for a new administration building.
Design $500,000
Construction $8,000,000
Total funding $8,500,000
3. To be expended by the University of Hawaii:
A. University of Hawaii at Hilo, Hawaii
Design and construction to renovate the research facilities in Keaukaha and Panaewa including the fresh and salt water pumping and distribution systems, research labs and offices, and the existing large concrete tanks to meet safety and project needs.
Design $250,000
Construction $5,100,000
Total funding $5,350,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2017.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 2nd Representative District
Description:
Appropriates funds for capital improvement projects for the benefit of the 2nd Representative District.