THE SENATE |
S.B. NO. |
1300 |
TWENTY-EIGHTH LEGISLATURE, 2015 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE twenty-fourth SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $24,322,500 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2015-2016 for the purpose of capital improvement projects for the twenty-fourth senatorial district, as follows:
1. Ahuimanu elementary school
A. Campus drainage improvement.
Plans $10,000
Design $10,000
Construction $70,000
Total funding $90,000
2. Aikahi elementary school
A. Electrical upgrade and installation of air conditioning split units.
Plans $60,000
Design $200,000
Construction $700,000
Total funding $960,000
B. Repave parking lot.
Plans $10,000
Design $10,000
Construction $100,000
Total funding $120,000
3. Benjamin Parker elementary school
A. Handicap accessibility for second floors, including elevators, of buildings C, D, and H.
Plans $10,000
Design $40,000
Construction $450,000
Total funding $500,000
4. James B. Castle high school
A. Expansion of dining room (cafeteria).
Construction $4,117,000
Total funding $4,117,000
B. Mitigate flooding between buildings E and F.
Plans $10,000
Design $10,000
Construction $180,000
Total funding $200,000
C. Design and construction for a new sound system and related upgrades in the Ronald Bright auditorium; grounds and site improvements; equipment and appurtenances.
Plans $10,000
Design $20,000
Construction $420,000
Total funding $450,000
5. Heeia elementary school
A. Design and construction of new drainage improvement.
Plans $10,000
Design $10,000
Construction $280,000
Total funding $300,000
B. Design and construct access/fire lane road along mall fence line.
Design $100,000
Construction $500,000
Total funding $600,000
C. Chain link fence improvements along Kailua border.
Plans $10,000
Design $10,000
Construction $180,000
Total funding $200,000
D. Enclose building B and C stairwells.
Plans $10,000
Design $10,000
Construction $180,000
Total funding $200,000
E. Design and install security gates at building E.
Plans $20,000
Design $30,000
Construction $250,000
Total funding $300,000
6. Kaelepulu elementary school
A. Air conditioning for the school (new).
Total funding $3,500
B. Air conditioning for the administration and library building (new).
Total funding $10,000
C. Electrical upgrade.
Design $40,000
Construction $360,000
Total funding $400,000
D. Covered play court with music room (new).
Total funding $400,000
7. Kailua high school
A. Performing arts and media presentation center.
Design and construction $1,400,000
Total funding $1,400,000
8. Kalaheo high school
A. Design and construction of athletic field.
Construction $1,000,000
Total funding $1,000,000
B. Refurbish weight room.
Construction $5,000
Equipment $70,000
Total funding $75,000
C. Refurbish building M for STEM robotics.
Construction $75,000
Total funding $75,000
9. Kaneohe elementary school
A. Expansion of lower campus parking lot, relocate basketball court, and other lot improvements.
Plans $10,000
Design $10,000
Construction $430,000
Equipment $50,000
Total funding $500,000
10. Kapunahala elementary school
A. Construction of two portable classroom buildings.
Plans $10,000
Design $20,000
Construction $570,000
Total funding $600,000
11. Samuel Wilder King intermediate school
A. Remodel the gym concession area.
Plans $10,000
Construction $75,000
Equipment $5,000
Total funding $90,000
12. Maunawili elementary school
A. Campus wide electrical upgrade.
Design $50,000
Construction $445,000
Total funding $495,000
13. Mokapu elementary school
A. Campus wide electrical upgrade.
Design $100,000
Construction $365,000
Total funding $465,000
14. Olomana school
A. Construction of a 12-foot extension to the existing physical education portable building.
Plans $6,000
Design $8,000
Construction $126,000
Total funding $140,000
15. Puohala elementary school
A. Slope stabilization and erosion control.
Plans $10,000
Design $20,000
Construction $270,000
Total funding $300,000
16. Kawainui marsh
A. Environmental cleanup, wildlife habitat restoration, and management facility enhancements.
Design $250,000
Construction $2,450,000
Total funding $2,700,000
17. Hawaii State Veterans cemetery
A. Repair and maintenance.
Design & construction management $90,000
Repairs and maintenance $284,000
Total funding $374,000
18. Hawaii State hospital
A. Demolish the patient facility at Goddard building, Oahu.
Design $1,000
Construction $2,200,000
Total funding $2,201,000
B. Design for a new patient facility at the site of the Goddard building.
Design $5,056,000
Construction $1,000
Total funding $5,057,000
SECTION 2. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2018, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the appropriate expending agency for the purposes of this Act.
SECTION 4. This Act shall take effect on July 1, 2015.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 24th Senatorial District
Description:
Appropriates funds for capital improvement projects in the 24th senatorial district.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.