SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2011-2012.
1. To be expended by the department of education:
A. Benjamin Parker elementary school
Building C, D, and H second floor handicapped accessibility, including elevator.
Plans $ 30,000
Design 100,000
Construction 1,300,000
Total funding $1,430,000
B. Enchanted Lake elementary school
Electrical upgrade for entire campus.
Plans $ 1,000
Design 1,000
Construction 98,000
Total funding $100,000
Shelter coverage for administration classroom rear door entrance.
Plans $ 1,000
Design 1,000
Construction 98,000
Total funding $100,000
Shelter coverage for front and back door of library.
Plans $ 1,000
Design 1,000
Construction 98,000
Total funding $100,000
C. Castle high school
Replace current lighting and sound system for Ronald E. Bright Auditorium. Upgrade to LED (green) fixtures and a digital sound system.
Design & construction $500,000
Total funding $500,000
D. Olomana school
Construction of a twelve-foot extension to the existing physical education portable to accommodate increasing numbers of "at-risk" students.
Plans $ 5,000
Design 8,000
Construction 75,000
Total funding $88,000
E. King intermediate school
Expand cafeteria to allow its use as a theatre/performance center with adjoining restroom facility.
Plans $ 30,000
Design 60,000
Construction 400,000
Equipment 10,000
Total funding $500,000
Remodel gym kitchen area (sinks, cabinets, counters, appliances).
Plans $ 5,000
Design 1,000
Construction 14,000
Total funding $20,000
F. Kailua high school
Natural resources classroom building with specially designed research laboratories.
Design $ 800,000
Construction 15,200,000
Total funding $16,000,000
Removal and replacement of soccer/football field bleachers/storage rooms.
Plans $ 50,000
Design 500,000
Construction 1,950,000
Total funding $2,500,000
G. Kapunahala elementary school
Covered walkway between buildings A and B.
Plans $ 1,000
Design $ 40,000
Construction 155,000
Total funding $196,000
Covered walkway and sidewalk between buildings B and C.
Plans $ 1,000
Design $ 40,000
Construction 160,000
Total funding $201,000
Elevator for building B.
Plans $ 5,000
Design $ 50,000
Construction 150,000
Total funding $205,000
Covered playground in back of building C.
Plans $ 1,000
Design $ 2,500
Construction 10,000
Total funding $13,500
H. Maunawili elementary school
Elevator for building E to access computer lab on second floor.
Plans $5,000
Design $50,000
Construction $150,000
Total funding $205,000
I. Keolu elementary school
Installation of overhead projector in the cafeteria.
Construction $ 500
Equipment $7,500
Total funding $8,000
J. Kaneohe public library
New, ADA compliant circulation desk.
Plans $5,000
Design $5,000
Construction $10,000
Total funding $20,000
K. Kailua public library
New roof.
Total funding $200,000
2. To be expended by the department of land and natural resources:
A. Plans and design for an engineering study and environmental assessment to restore water flow from Kawai Nui marsh to Kawai Nui stream.
Construction $425,000
Total funding $425,000
B. Heeia state park
Improvements to parking lot and access to Heeia fishpond.
Total funding $100,000
C. Kaelepulu pond mitigation
Plans $ 100,000
Design 100,000
Construction 800,000
Total funding $1,000,000
D. Creation of a Windward area dog park.
Plans $ 10,000
Design 10,000
Construction 200,000
Total funding $220,000
3. To be expended by the department of transportation:
A. Sidewalk and pedestrian improvements for Lilipuna road, Waikalua road, and William Henry road.
Plans $ 50,000
Design 75,000
Construction 1,000,000
Total funding $1,125,000
B. Lighted crosswalk on Kamehameha highway between Lilipuna road and Haiku road.
Plans $ 1,000
Design 1,000
Construction 48,000
Total funding $50,000
C. Traffic studies for Olomana and Pohakupu subdivisions, ingress/egress.
Plans $ 1,000
Design 1,000
Construction 23,000
Total funding $25,000
D. Parking lot for Maunawili elementary school behind Olomana fire station.
Plans $ 10,000
Design 240,000
Total funding $250,000
E. Installation of ten storm drain filters for Kaneohe/Kailua area.
Plans $ 10,000
Design 10,000
Construction 20,000
Equipment 60,000
Total funding $100,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2011.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 49th Representative District
Description:
Appropriates funds for capital improvement projects to benefit the 49th representative district.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.