Report Title:
CIP; 24th Senatorial District
Description:
Appropriates funds for capital improvement projects in the 24th senatorial district.
THE SENATE |
S.B. NO. |
1353 |
TWENTY-FOURTH LEGISLATURE, 2008 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE twenty-fourth SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $33,653,500 or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2009-2010, for the purpose of capital improvement projects for the twenty-fourth senatorial district, as follows:
1. Aikahi elementary school
Electrical upgrade for the entire campus.
Design and construction $1,500,000
Total funding $1,500,000
2. Castle high school
A. Construction of an all-weather track, synthetic athletic field, and press box/announcer's box.
Design and construction $5,000,000
Total funding $5,000,000
B. Electrical upgrade (replacement of electrical panel) for building BB (auditorium).
Plans $10,000
Construction $25,000
Equipment $250,000
Total funding $285,000
3. Enchanted Lake elementary school
A. Electrical upgrade for the entire campus.
Plans $1,000
Design $1,000
Construction $98,000
Total funding $100,000
B. Exit door for the principal's office and rewiring of the administration building.
Plans $1,000
Design $1,000
Construction $13,000
Total funding $15,000
C. Covered walkway from building F (library) to the main corridor.
Plans $1,000
Design $1,000
Construction $98,000
Total funding $100,000
D. Telecommunications upgrade.
Plans $1,000
Design $1,000
Construction $13,000
Total funding $15,000
E. Windbreaker from building E to building G.
Plans $1,000
Design $1,000
Construction $28,000
Total funding $30,000
4. Heeia elementary school
Extension of the patio and walkway for student use.
Plans $5000
Construction $10,000
Equipment $2,000
Total funding $17,000
5. Kaelepulu elementary school
A. Replace walkway steps from parking lot to building C that have shifted due to erosion.
Design $25,000
Construction $150,000
Total funding $175,000
B. Upgrade telecommunications network.
Design $35,000
Construction $145,000
Total funding $180,000
C. Covered walkway improvements.
Design $40,000
Construction $140,000
Total funding $180,000
6. Kailua elementary school
Grade, resurface, and restripe the parking lot.
Design $32,000
Construction $172,000
Total funding $204,000
7. Kailua high school
Construct a natural science classroom and research lab building.
Design and construction $8,000,000
Total funding $8,000,000
8. Kainalu elementary school
Electrical upgrade for the entire campus.
Design and construction $1,500,000
Total funding $1,500,000
9. Kalaheo high school
Replace traditional locks with electronic key cards.
Design and construction $500,000
Total funding $500,000
10. Kaneohe elementary school
A. Expand the school library and bring the library into compliance with the Americans with Disabilities Act by grading an access road to the library and constructing a parking area near the library.
Design $100,000
Construction $1,100,000
Total funding $1,200,000
B. Install air conditioning throughout the school.
Design and construction $3,500,000
Total funding $3,500,000
11. Kapunahala elementary school
A. Electrical upgrade to support technological tools for all classrooms and administration buildings.
Construction $450,000
Total funding $450,000
B. Resurface the existing parking area and extend it to add more stalls.
Design $25,000
Construction $145,000
Total funding $170,000
C. Install air conditioning throughout the school.
Design and construction $3,500,000
Total funding $3,500,000
12. Keolu elementary school
Convert the media lab to a multimedia lab to document, research, and design to accommodate all areas of performance arts.
Plans $500
Design $2,000
Construction $120,000
Equipment $20,000
Total funding $142,500
13. King intermediate school
Expansion of the cafeteria to serve as an auditorium; add stage, new restrooms, and a parking area across the street from the existing facility.
Plans $30,000
Design $60,000
Construction $400,000
Equipment $10,000
Total funding $500,000
14. Maunawili elementary school
A. Playground equipment for lower elementary school students.
Plans and Design $15,000
Construction $55,000
Equipment $30,000
Total funding $100,000
B. Cattle gate for the dumpster area.
Design $5,000
Construction $75,000
Total funding $80,000
C. Parking lot for elementary school behind Olomana fire station.
Plans $10,000
Design $240,000
Total funding $250,000
15. Mokapu elementary school
Electrical upgrade for the entire campus.
Design and construction $1,000,000
Total funding $1,000,000
16. Olomana school
Replace glass jalousies and frame with polyvinyl chloride louvers and aluminum frames; install security screens over new louvers and frames.
Construction $35,000
Total funding $35,000
17. Olomana youth center
Construct an open-air field house for indoor sports (basketball, volleyball, etc.).
Construction $1,500,000
Equipment $100,000
Total funding $1,600,000
18. Benjamin Parker elementary school
Construct retaining walls along the back of buildings C and D and the cafeteria to stop erosion and prevent the chain link fence from falling into the drainage ditch adjacent to the highway.
Design and construction $125,000
Total funding $125,000
19. Puohala elementary school
Electrical upgrade for entire campus.
Plans $1,000
Design $1,000
Construction $98,000
Total funding $100,000
20. Kawai Nui marsh
Restore water flow from Kawai Nui marsh to Kawai Nui stream.
Plans $100,000
Design $175,000
Construction $425,000
Total funding $700,000
21. Heeia state park
Improvements to the parking lot and access to fishpond.
Total funding $100,000
22. Lilipuna Road, Waikalua Road, and William Henry Road
Sidewalk and pedestrian improvements.
Plans $50,000
Design $75,000
Construction $1,000,000
Total funding $1,125,000
23. Kamehameha highway
Lighted crosswalk between Lilipuna Road and Haiku Road.
Plans $1,000
Design $1,000
Construction $48,000
Total funding $50,000
24. Olomana and Pohakupu subdivisions
Ingress/egress traffic study.
Plans $1,000
Design $1,000
Construction $23,000
Total funding $25,000
25. Kaneohe/Kailua storm drain filters
Install ten storm drain filters for the Kaneohe/Kailua area.
Plans $10,000
Design $10,000
Construction $20,000
Equipment $60,000
Total funding $100,000
26. Windward area state buildings
Retrofit buildings to provide shelter during disasters or emergencies.
Plans $25,000
Design $75,000
Construction $900,000
Total funding $1,000,000
SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2012, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act as follows:
(1) For items 1 through 19, the expending agency shall be the department of education;
(2) For items 20 and 21, the expending agency shall be the department of land and natural resources;
(3) For items 22 through 25, the expending agency shall be the department of transportation; and
(4) For item 26, the expending agency shall be the department of defense.
SECTION 4. This Act shall take effect on July 1, 2009.
INTRODUCED BY: |
_____________________________ |
|
|