SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2009-2010:
1. To be expended by the department of education:
A. Waimea high school, Kauai
Design, construction, and equipment for the renovation
and expansion of building W, including connecting
walkways, ground and site improvements, equipment, and
appurtenances.
Design $455,000
Construction $6,415,000
Equipment $20,000
Total funding $6,890,000
B. Waimea high school, Kauai
Design, construction, and equipment for expansion of
junior varsity and varsity locker rooms and the athletic storage room and facility.
Design $500,000
Construction $5,475,000
Equipment $25,000
Total funding $6,000,000
C. Waimea Canyon middle school, Kauai
Design, construction, and equipment for the installation of outdoor covered play-court.
Design $175,000
Construction $1,500,000
Equipment $10,000
Total funding $1,685,000
D. Kekaha elementary school, Kauai
Design, construction, and equipment for a new
classroom building, ground and site improvements,
equipment, and appurtenances.
Design $260,000
Construction $10,500,000
Equipment $60,000
Total funding $10,820,000
E. Kapaa public library, Kauai
Design for a new library.
Design $460,000
Total funding $460,000
2. To be expended by the department of land and natural resources:
A. Nawiliwili harbor, Kauai
Design and construction for a module at Nawiliwili harbor to jointly house the State's small boat harbor office and the harbor agent. Funds to be directed to the department of land and natural resources small boat harbors.
Design $20,000
Construction $182,000
Total funding $202,000
B. Port Allen small boat harbor, Kauai
Plans, design, and construction for repairs and improvements to Port Allen small boat harbor, including concrete piers, cat-walks, and pilings ($3,000,000); installation of docks/piers ($2,500,000); three additional docks ($1,500,000); restroom improvements ($500,000); pavement ($200,000); ramp pier design and construction ($250,000); and loading dock design and construction ($1,200,000).
Plans $1,000
Design $600,000
Construction $8,549,000
Total funding $9,150,000
C. Wailua marina, Kauai
Plans, design, and construction for repairs and improvements to Wailua marina, including new floating docks ($1,200,000); new wooden docks ($50,000); replacement of loading docks ($40,000); waterline installation ($75,000); security fencing ($15,000); dredging ($50,000); and ramp repairs ($250,000).
Plans $1,000
Design $1,000
Construction $1,678,000
Total funding $1,680,000
3. To be expended by the Hawaii health systems corporation:
A. Hawaii health systems corporation – Kauai region, Kauai
Plans for regional master planning.
Plans $1,000,000
Total funding $1,000,000
4. To be expended by the department of transportation:
A. Kuhio highway, Kauai
Plans, design, and construction for Kuhio highway signalization at the intersection of Kauai community correctional center and Wailua golf course.
Plans $500,000
Design $500,000
Construction $2,500,000
Total funding $3,500,000
5. To be expended by Kauai community college:
A. Kauai community college, Kauai
Plans to install sufficient solar voltaic panels as a ground array and on buildings to meet the college’s electric needs.
Plans $1,000,000
Total Funding $1,000,000
6. To be expended by the county of Kauai:
A. Anahola water system, Kauai
Design and construction for pump, electrical controls, connecting pipelines, and appurtenances for Anahola well number four.
Design $100,000
Construction $300,000
Total funding $400,000
B. Hanalei water system, Kauai
Plans for an eight-inch ductile iron waterline to provide fire protection for Hanalei school.
Plans $125,000
Total funding $125,000
C. Hanalei water system, Kauai
Plans and construction for installation of waterline for improvements to existing Hanalei school waterline.
Plans $300,000
Construction $3,000,000
Total funding $3,300,000
D. Hanapepe veterans cemetery, Kauai
Equipment for burial vaults.
Equipment $100,000
Total funding $100,000
E. Kilauea water system, Kauai
Plans for a study for the use of non-potable water to meet agricultural demands, thereby relieving the heavy demand on the domestic water system.
Plans $200,000
Total funding $200,000
F. Kilauea water system, Kauai
Construction for installation of waterline for improvements to existing Kilauea school improvements.
Construction $800,000
Total funding $800,000
G. Kokee and Haena simulcast trunking system, Kauai
Plans, design, and construction for a trunking system add-on that will provide improved communications within "dead spots" in the area.
Plans $126,000
Design $276,000
Construction $2,103,000
Total funding $2,505,000
H. Wailua emergency bypass road, Kauai
Plans and construction for repairs and resurfacing to the Wailua emergency bypass road.
Plans $100,000
Construction $850,000
Total funding $950,000
I. Wailua-Kapaa water system, Kauai
Plans, design, and construction for a five hundred thousand-gallon storage tank adjacent to the Makaleha tank, and a new one million-gallon tank and connecting pipeline within the Ornellas tank hydraulic zone.
Plans $250,000
Design $1,000
Construction $1,500,000
Total funding $1,751,000
J. Wailua-Kapaa water system, Kauai
Plans for a twelve-inch water main transmission line in the upper Kawaihau area of the Kapaa water system to transport water to the central and lower part of the water system for fire protection of Kapaa high school and Mahelona hospital, and to allow for the development of affordable housing.
Plans $300,000
Total funding $300,000
K. Wailua-Kapaa water systems, Kauai
Design and construction of a new one million-gallon storage tank and connecting pipeline within the department's Ornellas tank hydraulic zone.
Design $1,000,000
Construction $3,000,000
Total funding $4,000,000
L. Wailua-Kapaa water system, Kauai
Design and construction of water mains along Kawaihau, Kahuna, and Piliamoo road sections.
Design $300,000
Construction $4,500,000
Total funding $4,800,000
M. Waimea wastewater treatment plant, Kauai
Construction of upgrades to the Waimea wastewater treatment plant.
Construction $6,000,000
Total funding $6,000,000
N. Waimea water system, Kauai
Plans, design, and construction for a twelve-inch waterline along Waimea Canyon drive to provide fire protection for Waimea Canyon school.
Plans $110,000
Design $1,000
Construction $6,250,000
Total funding $6,361,000
O. Waimea water system, Kauai
Construction for installation of waterline for improvements to existing Waimea Canyon school improvements.
Construction $5,000,000
Total funding $5,000,000
P. Wainiha-Haena water system, Kauai
Design and construction for a one hundred thousand-gallon storage tank, booster pump station, and connecting pipeline and appurtenances.
Design $100,000
Construction $200,000
Total funding $300,000
Q. Wainiha-Haena water system, Kauai
Plans, land, and construction of a one hundred thousand-gallon storage tank, booster pump station, connecting pipeline and appurtenances.
Plans $500,000
Land $100,000
Construction $3,000,000
Total funding $3,600,000