Report Title:
CIP; 13th Senatorial District
Description:
Appropriates funds for capital improvement projects in the thirteenth senatorial district.
THE SENATE |
S.B. NO. |
3203 |
TWENTY-THIRD LEGISLATURE, 2006 |
||
STATE OF HAWAII |
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE THIRTEENTH SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $36,672,292, or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2006-2007, for the purpose of capital improvement projects for the senatorial district, as follows:
1. Farrington High School
Sport track improvements $681,924
Dining/multi-use pavilion
Phase I: Concrete slab, drainage system,
CMU perimeter wall and electrical
conduit rough-ins $95,000
Phase II: columns with electrical
outlets, roof with overhead
lighting $155,000
Total funding $931,924
2. Roosevelt High School
Restore funding for auditorium
project $4,000,000
Total funding $4,000,000
3. Puuhale Elementary School
Construction of covered walkway
between main building and
cafeteria $225,000
Pave Kanakanui road $80,000
Re-pave main school parking lot $66,000
Covered playcourt $900,000
Upgrade first floor lights $200,000
Replace carpeting $300,000
Install classroom wall dividers $200,000
Repaint interior walls and hallway $5,000
Repaint classroom interiors $60,000
Tetherball base bedding and concrete
Supports $10,000
Total funding $2,046,000
4. Kapalama School
Recarpet room C1, C3, C4 and
teacher workroom $30,000
Total funding $30,000
5. Kalihi-Kai Elementary School
Replace program bells $75,000
Electrical upgrade $20,000
Total funding $95,000
6. Royal School
Replace campus fire alarm system
Replace grease traps
Upgrade school program bell system
Sentricon treatment for buildings D and E
Root containment project for buildings B and C
Re-tile classrooms in building B,
all five classrooms on the second floor
Renovate building A student restrooms
Renovate building B student restrooms
Repaint building A interior
Repaint building A exterior
Repaint building B interior
Repaint building B exterior
Renovate building C restroom
Repaint building C interior
Total funding $480,000
7. McKinley High School
Electrical system upgrade $500,000
Industrial education building
renovation $4,622,000
Girls athletic locker room $2,000,000
Boys athletic locker room $2,000,000
Total funding $9,122,000
8. Kalakaua Intermediate School
Repair walls $2,181,000
New boys and girls locker rooms $2,263,000
Total funding $4,444,000
9. Liliha Library
Replace worn and stained carpet $79,378
Total funding $79,378
10. Keehi Lagoon
Phase I: Dock replacement $1,800,000
Phase II: Water system
replacement $700,000
Total funding $2,500,000
11. Kawananakoa Middle School
A. Electrical upgrades
Plans $
Design $
Construction $
Total funding $425,000
B. Electrical and plumbing of auditorium
Plans $
Design $
Construction $
Total funding $1,350,000
C. Building C music building renovation
Plans $
Design $
Construction $
Total funding $350,000
12. Kalihi-Waena School
Air conditioning of renovated library in administration building
Plans and design $1,000
Electrical $3,000
A/C unit and installation $6,000
Total funding $10,000
13. Kalihi Kai Elementary School
Electric system upgrade
Plans $
Design $
Construction $
Total funding $500,000
14. Nuuanu Elementary School
A. Reroof building F and portable B
Maintenance and repair
Total funding $61,000
B. ADA transition accessibility; public accommodation
Plans $
Design $
Construction $
Total funding $280,000
C. Air conditioning of school; noise/heat abatement
Plans $
Design $
Construction $
Total funding $3,500,000
15. Kalihi-Uka School
A. Parking upgrade, include improvements to pick-up and drop-off area
Plans $
Design $
Construction $
Total funding $150,000
B. Computer room #33 electrical upgrade and air conditioning
Plans $
Design $
Construction $
Total funding $100,000
C. Playground equipment
(age appropriate and accessible)
Total funding $80,000
16. Dole Middle School
Three sub-standard restrooms
Renovation
Plans $4,500
Design $4,500
Total funding $3,000,000
17. Likelike Elementary School
A. 01 PLYCT RPL BB RMS
Design $1,000
Construction $9,000
Total funding $10,000
B. A Repaint exterior
Design $7,000
Construction $35,000
Total funding $42,000
C. A-5 recarpet
Design $1,000
Construction $7,000
Total funding $8,000
D. ABC RPL classroom lights
Design $ 4,000
Construction $156,000
Total funding $160,000
E. B renovate restroom
Design $ 40,000
Construction $200,000
Total funding $240,000
F. B repaint exterior
Design $ 8,000
Construction $50,000
Total funding $58,000
G. BCD waterproof eyebrows
Design $2,000
Construction $23,000
Total funding $25,000
H. C renovate restroom
Design $40,000
Construction $200,000
Total funding $240,000
I. C repaint exterior
Design $6,000
Construction $24,000
Total funding $30,000
J. Campus exterior paint
Design $20,000
Construction $180,000
Total funding $200,000
K. Campus furniture (cabinets/cafe
Tables
Total funding $
L. Campus furniture
Total funding $6,000
M. Campus Sentricom termite control
Design $2,000
Construction $21,000
Total funding $23,000
N. Classroom renovation
Design $
Construction $990,000
Total funding $990,000
O. D RERF (1984)
Design $8,000
Construction $87,000
Total funding $95,000
P. D replace UB outlets
Design $1,000
Construction $8,000
Total funding $9,000
Q. D replace light fixtures
Design $6,000
Construction $77,000
Total funding $83,000
R. D repaint exterior
Design $8,000
Construction $40,000
Total funding $48,000
S. E repaint interior
Design $2,000
Construction $23,000
Total funding $25,000
T. E reroof (1994)
Design $8,000
Construction $157,000
Total funding $165,000
U. E replace dining room vents
Design $4,000
Construction $42,000
Total funding $46,000
V. Electrical upgrade (CAP)
Design $15,000
Construction $245,000
Total funding $260,000
W. Replace perimeter fence
Design $1,000
Construction $15,000
Total funding $16,000
18. Linapuni Elementary School
Campus play area upgrade
Design $15,000
Construction $35,000
Total funding $150,000
19. Fern Elementary School
Electrical upgrade and air conditioning
of I building (install 2 100 AMP
electrical panels and 7 60,000 BTU
units and 2 48,000 BTU units)
Installation of 2 100 AMP
electrical panels $100,000
Installation of AC units $108,990
Total funding $208,990
SECTION 2. The appropriation made for the capital improvement project authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2008, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the department of education for the purposes of this Act.
SECTION 4. This Act shall take effect on July 1, 2006.
INTRODUCED BY: |
_____________________________ |