relating to capital improvement projects for the benefit of THE THIRTEENTH SENATORIAL DISTRICT.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $36,672,292, or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2006-2007, for the purpose of capital improvement projects for the senatorial district, as follows:

1. Farrington High School

Sport track improvements $681,924

Dining/multi-use pavilion

Phase I: Concrete slab, drainage system,

CMU perimeter wall and electrical

conduit rough-ins $95,000

Phase II: columns with electrical

outlets, roof with overhead

lighting $155,000

Total funding $931,924

2. Roosevelt High School

Restore funding for auditorium

project $4,000,000

Total funding $4,000,000

3. Puuhale Elementary School

Construction of covered walkway

between main building and

cafeteria $225,000

Pave Kanakanui road $80,000

Re-pave main school parking lot $66,000

Covered playcourt $900,000

Upgrade first floor lights $200,000

Replace carpeting $300,000

Install classroom wall dividers $200,000

Repaint interior walls and hallway $5,000

Repaint classroom interiors $60,000

Tetherball base bedding and concrete

Supports $10,000

Total funding $2,046,000

4. Kapalama School

Recarpet room C1, C3, C4 and

teacher workroom $30,000

Total funding $30,000

5. Kalihi-Kai Elementary School

Replace program bells $75,000

Electrical upgrade $20,000

Total funding $95,000

6. Royal School

Replace campus fire alarm system

Replace grease traps

Upgrade school program bell system

Sentricon treatment for buildings D and E

Root containment project for buildings B and C

Re-tile classrooms in building B,

all five classrooms on the second floor

Renovate building A student restrooms

Renovate building B student restrooms

Repaint building A interior

Repaint building A exterior

Repaint building B interior

Repaint building B exterior

Renovate building C restroom

Repaint building C interior

Total funding $480,000

7. McKinley High School

Electrical system upgrade $500,000

Industrial education building

renovation $4,622,000

Girls athletic locker room $2,000,000

Boys athletic locker room $2,000,000

Total funding $9,122,000

8. Kalakaua Intermediate School

Repair walls $2,181,000

New boys and girls locker rooms $2,263,000

Total funding $4,444,000

9. Liliha Library

Replace worn and stained carpet $79,378

Total funding $79,378

10. Keehi Lagoon

Phase I: Dock replacement $1,800,000

Phase II: Water system

replacement $700,000

Total funding $2,500,000

11. Kawananakoa Middle School

A. Electrical upgrades

Plans $

Design $

Construction $

Total funding $425,000

B. Electrical and plumbing of auditorium

Plans $

Design $

Construction $

Total funding $1,350,000

C. Building C music building renovation

Plans $

Design $

Construction $

Total funding $350,000

12. Kalihi-Waena School

Air conditioning of renovated library in administration building

Plans and design $1,000

Electrical $3,000

A/C unit and installation $6,000

Total funding $10,000

13. Kalihi Kai Elementary School

Electric system upgrade

Plans $

Design $

Construction $

Total funding $500,000

14. Nuuanu Elementary School

A. Reroof building F and portable B

Maintenance and repair

Total funding $61,000

B. ADA transition accessibility; public accommodation

Plans $

Design $

Construction $

Total funding $280,000

C. Air conditioning of school; noise/heat abatement

Plans $

Design $

Construction $

Total funding $3,500,000

15. Kalihi-Uka School

A. Parking upgrade, include improvements to pick-up and drop-off area

Plans $

Design $

Construction $

Total funding $150,000

B. Computer room #33 electrical upgrade and air conditioning

Plans $

Design $

Construction $

Total funding $100,000

C. Playground equipment

(age appropriate and accessible)

Total funding $80,000

16. Dole Middle School

Three sub-standard restrooms

Renovation

Plans $4,500

Design $4,500

Total funding $3,000,000

17. Likelike Elementary School

A. 01 PLYCT RPL BB RMS

Design $1,000

Construction $9,000

Total funding $10,000

B. A Repaint exterior

Design $7,000

Construction $35,000

Total funding $42,000

C. A-5 recarpet

Design $1,000

Construction $7,000

Total funding $8,000

D. ABC RPL classroom lights

Design $ 4,000

Construction $156,000

Total funding $160,000

E. B renovate restroom

Design $ 40,000

Construction $200,000

Total funding $240,000

F. B repaint exterior

Design $ 8,000

Construction $50,000

Total funding $58,000

G. BCD waterproof eyebrows

Design $2,000

Construction $23,000

Total funding $25,000

H. C renovate restroom

Design $40,000

Construction $200,000

Total funding $240,000

I. C repaint exterior

Design $6,000

Construction $24,000

Total funding $30,000

J. Campus exterior paint

Design $20,000

Construction $180,000

Total funding $200,000

K. Campus furniture (cabinets/cafe

Tables

Total funding $

L. Campus furniture

Total funding $6,000

M. Campus Sentricom termite control

Design $2,000

Construction $21,000

Total funding $23,000

N. Classroom renovation

Design $

Construction $990,000

Total funding $990,000

O. D RERF (1984)

Design $8,000

Construction $87,000

Total funding $95,000

P. D replace UB outlets

Design $1,000

Construction $8,000

Total funding $9,000

Q. D replace light fixtures

Design $6,000

Construction $77,000

Total funding $83,000

R. D repaint exterior

Design $8,000

Construction $40,000

Total funding $48,000

S. E repaint interior

Design $2,000

Construction $23,000

Total funding $25,000

T. E reroof (1994)

Design $8,000

Construction $157,000

Total funding $165,000

U. E replace dining room vents

Design $4,000

Construction $42,000

Total funding $46,000

V. Electrical upgrade (CAP)

Design $15,000

Construction $245,000

Total funding $260,000

W. Replace perimeter fence

Design $1,000

Construction $15,000

Total funding $16,000

18. Linapuni Elementary School

Campus play area upgrade

Design $15,000

Construction $35,000

Total funding $150,000

19. Fern Elementary School

Electrical upgrade and air conditioning

of I building (install 2 100 AMP

electrical panels and 7 60,000 BTU

units and 2 48,000 BTU units)

Installation of 2 100 AMP

electrical panels $100,000

Installation of AC units $108,990

Total funding $208,990

SECTION 2. The appropriation made for the capital improvement project authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2008, shall lapse as of that date.

SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the department of education for the purposes of this Act.

SECTION 4. This Act shall take effect on July 1, 2006.

INTRODUCED BY: