Report Title:
CIP; 15th Senatorial District
Description:
Appropriates funds for capital improvement projects in the 15th senatorial district.
THE SENATE |
S.B. NO. |
3100 |
TWENTY-THIRD LEGISLATURE, 2006 |
||
STATE OF HAWAII |
||
|
A BILL FOR AN ACT
RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE FIFTEENTH SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $ , or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2006-2007, for the following capital improvements in the fifteenth senatorial district:
1. Salt Lake Waterway
Appropriate funds for Salt Lake Waterway clean-up, phase III. $1,000,000
2. Aliamanu Elementary School
A. Installation of acoustical tile and renovation of cafeteria. $60,000
B. Plan, design and construction of school office for clerical, administrative and support staff. $6,000,000
C. Plan, design and construction of a classroom building. $1,500,000
D. Plan, design and construction of security fence/cattle gates. $75,000
E. Design and construction for electrical upgrades. $500,000
F. Design and construction for school
media-library center. $7,500,000
3. Aliamanu Middle School
A. Upgrade electrical system to provide more power for technology and related activities. $350,000
B. Repair deteriorated volleyball/basketball courts to address safety concerns. $240,000
C. Design and construction to renovate room S-2 for conference rooms. $300,000
4. Hickam Elementary School
A. Design and install telephone system to facilitate safety and welfare for students. $60,000
B. Install phones and necessary wiring in offices and classrooms. $60,119
5. Makalapa Elementary School
A. Renovate and expand cafeteria to minimize staggered lunch hour and to alleviate crowded conditions. $915,000
B. Re-roof entire campus, all buildings, D, F, A leak. $900,000
C. Design and construction for electrical upgrade for entire campus. $300,000
D. Renovate classrooms, upgrade electrical, and install air conditioning for buildings D, F, & I. $800,000
E. Replace existing playground water sprinkler system and improve ground structure. $200,000
6. Moanalua Elementary School
A. Plan, design, and construction for eight classrooms to replace existing portable classrooms. $4,000,000
B. Plan, design, and construction to expand library building to accommodate technology center for students. $300,000
C. Construct retaining wall along Moanalua stream for kindergarten playground and emergency repairs to correct hazardous and safety conditions. $450,000
D. Construct roofing over existing open walkways. $13,000
E. Plan, design, and construction to expand parking lot. $25,000
7. Moanalua High School
A. Install student bathrooms near portable classrooms 7 and 8. $60,000
B. Install sinks in portable classrooms that are currently without water access. $15,000
C. Install water fountains near portables 7 and 8. $6,000
D. Replace existing bleachers, frame, infrastructure, and motor. $190,000
E. Plan, design, renovate locker rooms. $200,000
F. Plan, design, and construct performing arts center. $17,000,000
G. Design and construction to recrown school athletic field. $450,000
8. Moanalua Middle School
A. Plan, design, construct electrical upgrade for entire school campus, phase II. $150,000
B. Plan, design, construct and renovate regular classrooms. $250,000
9. Mokulele Elementary School
A. Design and construct handicapped accessible ramp at campus entrance. $8,000
B. Design and install air conditioning unit to classrooms to alleviate high temperatures in classroom. $500,000
C. Purchase and installation of voice mail for newly installed Norstar telephone system. $7,000
D. Design and install automatic sprinkler system for existing sprinkler system to help curb erosion of student playfield. $75,000
E. Resurface existing playcourt to address current hazardous conditions. $50,000
F. Design and construct elevator to comply with ADA. $1,000,000
G. Design and construct handicap accessible ramp onto stage area of cafeteria. $25,000
H. Design and construct handicap accessible ramp to portable physical education class. $25,000
I. Design and construct upgraded electrical capacity for the school. $500,000
J. Design and construct drainage system adjacent to building E between cafeteria and library. $150,000
K. Resurface playground. $50,000
10. Pearl Harbor Elementary School
A. Plan, design, and construction to build school library. $2,500,000
B. Install an 8-foot solid fence along the back of the school that borders on the new Navy Exchange parking area. $70,000
11. Pearl Harbor Kai Elementary School
A. Plan, design, and construction to renovate existing restrooms to comply with handicapped accessible law. $250,000
B. Plan, design, and construction to expand parking lot to ensure traffic and pedestrian safety. $150,000
12. Pu'uhale Elementary School
A. Pave Kanakanui Road. $80,000
B. Re-pave main school parking lot. $66,000
C. Covered playcourt. $900,000
D. Upgrade 1st floor lights. $200,000
E. Replace carpeting. $300,000
F. Install classroom wall dividers. $200,000
G. Repaint interior walls/hallway. $5,000
H. Repaint classroom interiors. $60,000
I. Tetherball base bedding/concrete supports. $10,000
13. Radford High School
A. Multi-purpose room completion. $300,000
B. New roofing for gym area. $100,000
C. Band room replacement of air conditioning units. $50,000
D. Replace roof of B building. $75,000
E. Replace roof of D building. $75,000
14. Red Hill Elementary School
A. Plan, design, and construction of covered walkways. $131,000
B. Design and construction of water sprinkler system to mitigate erosion problem. $23,000
15. Shafter Elementary School
A. Re-roof covered walkway from cafeteria to end of C Building. $43,000
B. Replace playground drinking fountains. $9,000
16. Salt Lake Elementary School
A. Design and construction to renovate interior classrooms E-3 and E-4. $900,000
B. Design and construction to renovate classrooms F-1 and F-10. $900,000
C. Design and construction to renovate classrooms C-1, C-2, and C-3. $900,000
D. Site preparation and procurement of playground equipment. $30,000
17. Puuhale Street, Oahu
Plan, design, and construction for the Puuhale street storm drainage system from the vicinity of King street to Nimitz highway and into the main drainage connector system. $3,500,000
18. Nimitz Elementary School
A. Design and construction of air conditioning campus-wide as the nearby fumes and noise from the airport affect student learning and generate health concerns. $3,500,000
B. Design and construction of a library building. $750,000
C. Design and construction of back playground and install irrigation system. $300,000
SECTION 2. The appropriations made for capital improvements projects authorized in this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all appropriations which are unencumbered as of June 30, 2008, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended for the purposes of this Act; provided that:
(1) The sums appropriated in items 1 and 17 shall be expended by the department of accounting and general services; and
(2) The sums appropriated in items 2 to 16 and 18 shall be expended by the department of education.
SECTION 4. This Act shall take effect on July 1, 2006.
INTRODUCED BY: |
_____________________________ |