Report Title:
CIP; 19th Senatorial District
Description:
Appropriates funds for capital improvement projects in the nineteenth senatorial district.
THE SENATE |
S.B. NO. |
1776 |
TWENTY-THIRD LEGISLATURE, 2005 |
||
STATE OF HAWAII |
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $264,154,000, or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2005-2006, for the purpose of capital improvement projects for the nineteenth senatorial district, as follows:
1. Barbers Point Elementary School
A. Design and install sprinkler/irrigation
system.
Design $5,000
Construction $124,000
Equipment $1,000
Total funding $130,000
B. Design and construction of paved parking area along Tulagi Avenue. $53,000
Total funding $53,000
C. Design and construction of air conditioning of classrooms B, C, E, F, G, and H.
Design $150,000
Construction $2,550,000
Equipment $100,000
Total funding $2,800,000
2. Mauka Lani Elementary School
A. Design and construction for Shelter in Place.
Design $120,000
Construction $1,000,000
Equipment $5,000
Total funding $1,125,000
B. Design and construction swale and underground drainage.
Design $10,000
Construction $89,000
Equipment $1,000
Total funding $100,000
C. Upgrade electrical system.
Design $100,000
Construction $999,000
Equipment $1,000
Total funding $1,100,000
D. Divert/address drainage and install safety railings.
Design $60,000
Construction $600,000
Equipment $5,000
Total funding $665,000
E. New outdoor stage with electrical outlets in the front of the school.
Design $25,000
Construction $100,000
Equipment $5,000
Total funding $130,000
3. Waikele Elementary School
Design and construction for electrical lighting of walkway from lower parking lot to main campus.
Design $20,000
Construction $64,000
Equipment $1,000
Total funding $85,000
4. Kapolei High School
Design and construction of bleachers, locker room and comfort station.
Design $50,000
Construction $5,249,000
Equipment $1,000
Total funding $5,300,000
5. Makakilo Elementary School
A. Build walkway and safety rails between buildings H and C.
Design $8,000
Construction $41,000
Equipment $1,000
Total funding $50,000
B. Install night lighting around campus buildings/security lights.
Design $12,000
Construction $62,000
Equipment $1,000
Total funding $75,000
C. Improve ADA accessibility for drop-off; move flagpole deeper into campus; widen loading and unloading area/ADA accessible stall.
Design $2,200
Construction $221,800
Equipment $1,000
Total funding $225,000
D. Install air conditioning in every room.
Design $12,000
Construction $62,000
Equipment $1,000
Total funding $75,000
E. Design and construction of new parking area at rear of school.
Design $1,000
Construction $98,000
Equipment $1,000
Total funding $100,000
6. Kaleiopuu Elementary School
A. Design and construction of a concrete fire break at rear of school.
Design $2,000
Construction $13,000
Equipment $1,000
Total funding $16,000
B. Renovation of fire rescue area on second floor of building G.
Design $5,000
Construction $104,000
Equipment $1,000
Total funding $110,000
C. Design and construction of retaining wall on the entire mauka side of campus.
Design $20,000
Construction $249,000
Equipment $1,000
Total funding $270,000
D. Extend mauka side of fire lanes to have access to school.
Design $3,000
Construction $41,000
Equipment $1,000
Total funding $45,000
7. Royal Kunia Elementary School
A. Construct the first increment, ground and site improvements, equipment and appurtenances.
Design $100,000
Construction $15,999,000
Equipment $1,000
Total funding $16,100,000
B. Design and construct the second increment, ground and site improvements, equipment and appurtenances.
Design $1,000
Construction $8,599,000
Equipment $500,000
Total funding $9,100,000
8. New Kapolei Makai Elementary School
Design $3,000,000
Construction $22,000,000
Equipment $500,000
Total funding $25,000,000
9. Kapolei Public Library (Phase II)
Planning $1,000
Construction $11,999,000
Total funding $12,000,000
10. Kapolei Judiciary Court Complex
Design $1,000,000
Construction $85,000,000
Equipment $9,000,000
Total funding $95,000,000
11. University of Hawaii, West Oahu Campus Phase I
Design $1,000
Construction $88,999,000
Total funding $89,000,000
12. Franklin D. Roosevelt Avenue
Extension of Franklin D. Roosevelt Avenue to meet the intersection of Kamokila Boulevard/Kapolei Parkway
Construction $4,500,000
Total funding $4,500,000
13. Fort Barrette Road widening
Farrington Highway to Franklin D. Roosevelt Avenue
Planning $500,000
Total funding $500,000
14. Makakilo Drive extension for second access road
Planning $500,000
Total funding $500,000
SECTION 2. The appropriations made for the capital improvement project authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2008, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended for the purposes of this Act; provided that:
(1) The sums appropriated in items 1 through 10 shall be expended by the department of accounting and general services;
(2) The sums appropriated in item 11 shall be expended by the University or Hawaii; and
(3) The sums appropriated in items 12 through 14 shall be expended by the department of transportation.
SECTION 4. This Act shall take effect on July 1, 2005.
INTRODUCED BY: |
_____________________________ |