Report Title:

CIP – 32nd Representative District

Description:

Capital Improvement projects for the 32nd Representative District.

HOUSE OF REPRESENTATIVES

H.B. NO.

3206

TWENTY-THIRD LEGISLATURE, 2006

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

relating to capital improvement projects for the benefit of the thirty-second Representative district.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2005-2006.

1. To be expended by the Department of Education:

A. Aiea Elementary School

(1) Covered walkway connecting Building C

to rest of school

Planning & design 20,000

Materials & construction 80,000

Total Funding 100,000

(2) Master plan for air conditioning of school

classrooms and library

Plans & design 200,000

Total Funding 200,000

B. Aliamanu Elementary School

(1) Installation of acoustical tiles in cafeteria

Materials & installation 60,000

Total Funding 60,000

(2) Renovation and expansion of school

administrative office and foundation

preparation

Planning & design 72,500

Construction & materials 1,377,500

Total Funding 1,450,000

(3) New classroom building (4 classrooms)

Planning & design 75,000

Construction & materials 1,425,000

Total Funding 1,500,000

C. Aliamanu Middle School

(1) Terracing of hillside to prevent

further erosion.

Planning & design 12,500

Construction & materials 237,500

Total Funding 250,000

(2) Repair/resurfacing of basketball/volleyball

court area

Construction & materials 240,000

Total Funding 240,000

D. Alvah Scott Elementary School

(1) Fencing around parking lot

Construction & materials 30,000

Total Funding 30,000

(2) Construction of an outdoor stage/pavillion

Planning & design 400

Construction & materials 7,600

Total Funding 8,000

(3) Level hill area at back of school;

concrete slab over area

Construction & materials 20,000

Total Funding 20,000

(4) Construction of multimedia center/

multipurpose building above the library

Planning & design 150,000

Total Funding 150,000

(5) Removal of dangerous rocks protruding

from soil and stopping erosion from area

fronting B building thorough contour

adjustment

Study 5,000

Plans 2,000

Design 2,000

Land 2,000

Construction 20,000

Equipment 20,000

Total funding 51,000

E. Hickam Elementary School

(1) Design and installation of telephone

system to facilitate safety and

welfare for students

Design 5,000

Installation & materials 55,000

Total Funding 60,000

(2) Installation of phones and necessary

wiring in offices and classrooms

Installation & materials 60,119

Total Funding 60,119

(3) Five (5) portable classrooms for regular

and special education students

Design 100,000

Construction & equipment 1,150,000

Total funding 1,250,000

F. Makalapa Elementary School

(1) Cafeteria expansion

Design & planning

Construction & materials

Total Funding

(2) Conversion of open-bay classrooms into

individual classroom.

Design & planning

Construction & materials

Total Funding

(3) Renovation of playground and

sprinkler system

Design & planning 10,000

Construction & materials 190,000

Total Funding 200,000

G. Moanalua Middle School

(1) Electrical upgrade 150,000

Total Funding 150,000

H. Mokulele Elementary School

(1) Resurface playcourt to prevent unsafe

conditions due to cracking and ponding

Planning & Design 2,500

Materials & construction 47,500

Total Funding 50,000

(2) Design & construction of an elevator

in building F for wheelchair accessibility

Planning & Design 50,000

Materials & construction 950,000

Total Funding 1,000,000

(3) Design & construction of handicapped

accessible ramp to the stage area of the cafeteria

Planning & Design 500

Materials & Construction 9,500

Total Funding 10,000

(4) Design & construction of handicapped

accessible ramp to the portable Physical Education class

Planning & Design 500

Materials & Construction 9,500

Total Funding 10,000

(5) Design & installation of an upgraded

electrical system

Planning & design 25,000

Materials & construction 475,000

Total Funding 500,000

(6) Design & construction of a drainage

system and development of area outside

of building E between the cafeteria and

the library.

Planning & design 7,500

Materials & construction 142,500

Total funding 150,000

I. Nimitz Elementary School

(1) Electrical upgrade, design,

& construction of air conditioning

campuswide to protect against fumes

and noise from airport

Design 175,000

Materials & construction 3,125,000

Total Funding 3,500,000

(2) Planning, design, and construction of

a library building

Planning & design 37,500

Construction 712,500

Total Funding 750,000

(3) Planning, design, and construction of

back playground and installation of

irrigation system.

Planning & design 15,000

Construction & materials 285,000

Total Funding 300,000

J. Pearl Harbor Elementary School

(1) Planning, design, & construction to build

a school library

Planning & design 125,000

Construction & materials 2,375,000

Total Funding 2,500,000

(2) Install an 8 foot solid fence along back

of school which borders on new Navy Exchange

parking area

Construction & planning 70,000

Total Funding 70,000

K. Pearl Harbor Kai Elementary School

(1) Increase parking capacity for back parking

lot

Planning & design 7,500

Construction & materials 142,500

Total Funding 150,000

L. Radford High School

(1) Completion of multipurpose room project

at room 117, including completion/construction

of roof extension, exhaust fan, grease

trap, plumbing, and sink

Planning & design 25,000

Construction & materials 475,000

Total Funding 500,000

(2) New roofing for gym area that covers

boys and girls showers and wrestling room

Construction & materials 100,000

Total Funding 100,000

(3) Replacement of air conditioning units

in band room

Materials & installation 50,000

Total Funding 50,000

(4) Replacement of boiler for girls locker

room showers

Materials & installation 50,000

Total Funding 50,000

(5) Replacement of roof – B building

Materials & installation 75,000

Total Funding 75,000

(6) Replacement of roof – D building

Materials & installation 75,000

Total Funding 75,000

(7) Electrical upgrade for buildings B, D, E, F, G, H, M, and Q.

Planning & design 40,000

Construction & materials 760,000

Total Funding 800,000

(8) New press box at football stadium

Planning & design 40,000

Construction & materials 760,000

Total funding 800,000

SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

SECTION 3. This Act shall take effect on July 1, 2006.

 

INTRODUCED BY:

_____________________________