Report Title:

UH; CIP

Description:

Appropriates funds for capital improvement projects at the University of Hawaii at Manoa.

HOUSE OF REPRESENTATIVES

H.B. NO.

3156

TWENTY-THIRD LEGISLATURE, 2006

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS AT THE UNIVERSITY OF HAWAII AT MANOA.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2006-2007.

1. To be expended by the University of Hawaii at Manoa:

A. Design of a new classroom and office complex at the University of Hawaii at Manoa.

Design $3,845,000

Total funding 3,845,000

B. Gartley hall renovation at the University of Hawaii at Manoa to correct health and safety and other code deficiencies, make the facility accessible to people with disabilities, and minimize the use of space.

Design 951,000

Total funding 951,000

C. Institute for astronomy, advanced technology research center in Kula. Purchase of scientific laboratory equipment, which includes a high-speed data farming infrastructure, turbomolecular vacuum systems, optical systems, cryogenic systems, precision metrology and micro-fabrication equipment.

Equipment 2,000,000

Total funding 2,000,000

D. Les Murakami stadium. Replace floodlight fixtures.

Design 35,000

Construction 600,000

Total funding 635,000

E. George hall. Re-roof makai wing.

Design 25,000

Construction 150,000

Total funding 175,000

F. Webster hall. Re-roof.

Design 25,000

Construction 250,000

Total funding 275,000

G. Pacific biomedical research center. Re-roof.

Design 25,000

Construction 150,000

Total funding 175,000

H. Keller hall. Re-roof.

Design 25,000

Construction 175,000

Total funding 200,000

I. Watanabe hall. General mechanical repairs and upgrades.

Design 75,000

Construction 1,000,000

Total funding 1,075,000

J. Sakamaki hall (courtyards A and B). Replace and upgrade air conditioning system, phase I.

Design 75,000

Construction 1,500,000

Total funding 1,575,000

K. Institute for astronomy. Replace cooling tower and hot water reheating systems.

Design 75,000

Construction 900,000

Total funding 975,000

L. Gilmore Hall. Replace and upgrade air conditioning system, phase I.

Design 75,000

Construction 1,500,000

Total funding 1,575,000

M. Cooke field. Replace turf.

Design 75,000

Construction 1,000,000

Total funding 1,075,000

N. Moore hall. Re-roof.

Design 30,000

Construction 200,000

Total funding 230,000

0. Physical science building. Re-roof.

Design 30,000

Construction 200,000

Total funding 230,000

P. Orvis auditorium. Lighting system replacement and upgrade.

Design 40,000

Construction 150,000

Total funding 190,000

Q. Kuykendall hall and annex. General repairs and repainting.

Design 30,000

Construction 270,000

Total funding 300,000

R. Pacific biomedical research center. General repairs and repainting.

Design 20,000

Construction 130,000

Total funding 150,000

S. Music building complex. Repairs to walkways and structural systems.

Design 0

Construction 1,050,000

Total funding 1,050,000

T. College of business administration. Improve exterior drainage.

Design 0

Construction 900,000

Total funding 900,000

U. Physical science building 217, Watanabe buildings 112 and 420 and St. John building 11. Upgrade auditoriums to include replace seating, air conditioning, audio/visual systems and carpeting.

Design 148,000

Construction 1,070,000

Total funding 1,218,000

V. Renovate laboratory spaces of the following buildings, cancer center, Edmundson, HIG, Snyder and MSB. Renovation to include improved lighting, repair health and safety issues and other outstanding repairs and upgrades.

Design 375,000

Construction 2,125,000

Total funding 2,500,000

W. Interior renovations of the following buildings, George hall, HPER, Bilger hall, IFA, physical science building and Spalding hall.

Design 375,000

Construction 2,125,000

Total funding 2,500,000

X. CTAHR Off campus facilities. Interior renovations.

Design 240,000

Construction 1,360,000

Total funding 1,600,000

Y. Campus wide sidewalk repairs. Repair walkways to comply with ADA guidelines.

Design 30,000

Construction 200,000

Total funding 230,000

Z. Holmes, Edmondson and Keller halls. Renovate classroom spaces.

Design 130,000

Construction 1,300,000

Total funding 1,430,000

AA. Snyder hall, Holmes hall, and Bilger add. Renovation of laboratory space.

Design 193,000

Construction 1,620,000

Total funding 1,813,000

BB. Temporary buildings. Refurbish of interior spaces.

Construction 900,000

Total funding 900,000

CC. Hemmenway and Holmes halls and Hamilton library. Improvements and modification to buildings to comply with ADA standards.

Design 200,000

Construction 2,200,000

Total funding 2,400,000

DD. Physical science building, art building and Gilmore hall. Renovate laboratory spaces.

Design 165,000

Construction 1,400,000

Total funding 1,565,000

EE. Art building, biomed courtyard B, MSB 110 and 114, Gartley hall 103, and music #3. Upgrade auditoriums.

Design 165,000

Construction 1,425,000

Total funding 1,590,00

FF. Magoon laboratory agriculture complex. Install security fencing.

Design 25,000

Construction 200,000

Total funding 225,000

GG. Campus wide. Improve and expand irrigation system.

Design 35,000

Construction 215,000

Total funding 250,000

HH. Dean Hall. Repairs to interior and exterior of building.

Design 35,000

Construction 300,000

Total funding 335,000

II. Small animal laboratory. Replace incinerator.

Design 35,000

Construction 165,000

Total funding 200,000

JJ. Lyon arboretum. Renovate interior spaces.

Design 100,000

Construction 500,000

Total funding 600,000

KK. Leahi hospital. Renovate interior spaces.

Design 100,000

Construction 500,000

Total funding 600,000

LL. Holmes hall. Renovation of carpenter shop.

Design 35,000

Construction 250,000

Total funding 285,000

MM. Duke Kahanamoku pool. Repair and upgrade floodlights.

Design 0

Construction 1,000,000

Total funding 1,000,000

NN. Keller hall. Upgrade power distribution systems.

Design 0

Construction 200,000

Total funding 200,000

OO. Food technology building, Orvis auditorium, Korean studies building, and law school. Upgrade exit lighting.

Design 0

Construction 200,000

Total funding 200,000

PP. Moore hall, HIG, MSB, POST, Snyder and Edmondson halls. Replace and upgrade exterior lighting.

Design 0

Construction 300,000

Total funding 300,000

QQ. HIG building. Lighting improvements and retrofits.

Design 40,000

Construction 300,000

Total funding 340,000

RR. KHET and EHSO trailer. Remove transformer and switchgear and raise low aerial drop.

Design 15,000

Construction 75,000

Total funding 90,000

SS. St. John, Gilmore, Watanabe, Bilger addition, Sinclair annexes, Hale Anuenue exterior. Lighting improvements and retrofits.

Design 60,000

Construction 500,000

Total funding 560,000

TT. Edmondson hall. Upgrade power distribution systems.

Design 75,000

Construction 500,000

Total funding 575,000

UU. Art, business administration, Hamilton library I and II, Spalding and Holmes hall. Replace and upgrade switchboards.

Design 50,000

Construction 400,000

Total funding 450,000

VV. Electrical substations. General repairs.

Design 15,000

Construction 100,000

Total funding 115,000

WW. Art Buildings. Replace electrical switchboards and panels.

Design 10,000

Construction 100,000

Total funding 110,000

XX. Hamilton library phases I and II. Replace secondary switchboards.

Design 10,000

Construction 100,000

Total funding 110,000

YY. George hall. Upgrade power distribution systems.

Design 30,000

Construction 200,000

Total funding 230,000

ZZ. Bachmann hall, Sherman lab., Miller hall, and George hall. Lighting improvements and Retrofits.

Design 20,000

Construction 120,000

Total funding 140,000

Al. Biomed, St. John and MSB. Replace refrigeration and freezer systems.

Design 40,000

Construction 400,000

Total funding 440,000

A2. UHS1. Upgrade power distribution systems.

Design 6,000

Construction 44,000

Total funding 50,000

A3. Sherman lab. Upgrade power distribution systems.

Design 30,000

Construction 200,000

Total funding 230,000

A4. Castle memorial hall. Upgrade power distribution systems.

Design 25,000

Construction 230,000

Total funding 255,000

A5. University high school. Upgrade water distribution systems.

Design 40,000

Construction 400,000

Total funding 440,000

A6. Business administration building. Upgrade power distribution systems.

Design 30,000

Construction 300,000

Total funding 330,000

A7. Holmes hall. Upgrade power distribution systems.

Design 30,000

Construction 300,000

Total funding 330,000

A8. Saunders hall. Upgrade power distribution systems.

Design 15,000

Construction 150,000

Total funding 165,000

A9. UHS#. Upgrade power distribution systems.

Design 25,000

Construction 230,000

Total funding 255,000

A10. HPER building. Reroof.

Design 30,000

Construction 250,000

Total funding 280,000

A11. Holmes hall. Reroof.

Design 8,000

Construction 42,000

Total funding 50,000

A12. Music complex. Reroof.

Design 45,000

Construction 300,000

Total funding 345,000

A13. St. Johns (upper roof). Reroof.

Design Funded

Construction 250,000

Total funding 250,000

A14. Hamilton library. Reroof.

Design 30,000

Construction 250,000

Total funding 280,000

A15. Sinclair library. Reroof.

Design 25,000

Construction 250,000

Total funding 275,000

A16. Environmental protection facility. Reroof.

Design 10,000

Construction 40,000

Total funding 50,000

A17. CTAHR-off campus facilities. Reroof.

Design 300,000

Construction 2,000,000

Total funding 2,300,000

A18. Marine science building. Reroof.

Design 30,000

Construction 220,000

Total funding 250,000

A19. New student services building. Reroof.

Design 25,000

Construction 150,000

Total funding 175,000

A20. Engineering quad. Reroof.

Design 20,000

Construction 180,000

Total funding 200,000

A21. Henke hall. Reroof.

Design 15,000

Construction 85,000

Total funding 100,000

A22. Building 37. Reroof.

Design 4,000

Construction 30,000

Total funding 34,000

A23. Watanabe hall. Reroof.

Design 30,000

Construction 250,000

Total funding 280,000

A24. Pope lab. Reroof.

Design 20,000

Construction 175,000

Total funding 195,000

A25. Wist addition. Reroof.

Design 75,000

Construction 425,000

Total funding 500,000

A26. Ag. Science engineering building. Reroof.

Design 30,000

Construction 140,000

Total funding 170,000

A27. Dean hall. Reroof.

Design 20,000

Construction 100,000

Total funding 120,000

A28. Building 171D. Reroof.

Design 8,000

Construction 30,000

Total funding 38,000

A29. Speech pathology and audiology building. Reroof.

Design 8,000

Construction 80,000

Total funding 88,000

A30. Gilmore hall. Reroof.

Design 20,000

Construction 175,000

Total funding 195,000

A31. Saunders hall. Reroof.

Design 12,000

Construction 100,000

Total funding 112,000

A32. Kuykendall hall. Reroof.

Design 18,000

Construction 150,000

Total funding 168,000

A33. 18 temporary buildings. Reroof.

Design 22,000

Construction 214,000

Total funding 236,000

A34. School of architecture. Reroof.

Design 45,000

Construction 425,000

Total funding 470,000

A35. University lab. high school #2. Reroof.

Design 20,000

Construction 125,000

Total funding 145,000

A36. University lab. high school #3. Reroof.

Design 30,000

Construction 175,000

Total funding 205,000

A37. University lab. high school #1. Reroof.

Design 25,000

Construction 150,000

Total funding 175,000

A38. University lab. high school locker room. Reroof.

Design 20,000

Construction 60,000

Total funding 80,000

A39. Castle memorial building. Reroof.

Design 45,000

Construction 300,000

Total funding 345,000

A40. University lab. elementary school. Reroof.

Design 35,000

Construction 240,000

Total funding 275,000

A41. Maile way. Resurface roadway.

Design Funded

Construction 250,000

Total funding 250,000

A42. East-west road. Resurface roadway.

Design Funded

Construction 200,000

A43. UH press. Resurface roadway.

Design 8,000

Construction 40,000

Total funding 48,000

A44. CEA, MSB and campus center. Resurface roadway.

Design 40,000

Construction 250,000

Total funding 290,000

A45. College of education and lab. school. Resurface roadway.

Design 25,000

Construction 150,000

Total funding 175,000

A46. Magoon lab. Resurface roadway.

Design 8,000

Construction 40,000

Total funding 48,000

A47. Motor pool. Resurface roadway.

Design 10,000

Construction 50,000

Total funding 60,000

A48. Mauna Kea. Resurface roadway.

Design 70,000

Construction 500,000

Total funding 570,000

A49. Les Murakami stadium. Replace sports surface.

Design 100,000

Construction 1,200,000

Total funding 1,300,000

A50. Les Murakami stadium. Reroof.

Design 15,000

Construction 100,000

Total funding 115,000

A51. Les Murakami stadium. General mechanical repairs.

Design 35,000

Construction 350,000

Total funding 385,000

A52. Duke Kahanamoku pool. General repairs and repainting.

Design 50,000

Construction 300,000

Total funding 350,000

A53. Cooke field. Replace bleachers.

Design 10,000

Construction 100,000

Total funding 110,000

SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purpose of this Act; provided that all construction and renovation work under this Act work shall meet or exceed the leadership in energy and environmental design silver rating standards for new construction and major renovation work (LEED-NC) and existing building operations (LEED-EB) established by the United States Green Building Council for developing high-performance, sustainable buildings.

SECTION 3. This Act shall take effect on July 1, 2006.