Report Title:
UH; CIP
Description:
Appropriates funds for capital improvement projects at the University of Hawaii at Manoa.
HOUSE OF REPRESENTATIVES |
H.B. NO. |
3156 |
TWENTY-THIRD LEGISLATURE, 2006 |
||
STATE OF HAWAII |
||
|
A BILL FOR AN ACT
RELATING TO CAPITAL IMPROVEMENT PROJECTS AT THE UNIVERSITY OF HAWAII AT MANOA.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2006-2007.
1. To be expended by the University of Hawaii at Manoa:
A. Design of a new classroom and office complex at the University of Hawaii at Manoa.
Design $3,845,000
Total funding 3,845,000
B. Gartley hall renovation at the University of Hawaii at Manoa to correct health and safety and other code deficiencies, make the facility accessible to people with disabilities, and minimize the use of space.
Design 951,000
Total funding 951,000
C. Institute for astronomy, advanced technology research center in Kula. Purchase of scientific laboratory equipment, which includes a high-speed data farming infrastructure, turbomolecular vacuum systems, optical systems, cryogenic systems, precision metrology and micro-fabrication equipment.
Equipment 2,000,000
Total funding 2,000,000
D. Les Murakami stadium. Replace floodlight fixtures.
Design 35,000
Construction 600,000
Total funding 635,000
E. George hall. Re-roof makai wing.
Design 25,000
Construction 150,000
Total funding 175,000
F. Webster hall. Re-roof.
Design 25,000
Construction 250,000
Total funding 275,000
G. Pacific biomedical research center. Re-roof.
Design 25,000
Construction 150,000
Total funding 175,000
H. Keller hall. Re-roof.
Design 25,000
Construction 175,000
Total funding 200,000
I. Watanabe hall. General mechanical repairs and upgrades.
Design 75,000
Construction 1,000,000
Total funding 1,075,000
J. Sakamaki hall (courtyards A and B). Replace and upgrade air conditioning system, phase I.
Design 75,000
Construction 1,500,000
Total funding 1,575,000
K. Institute for astronomy. Replace cooling tower and hot water reheating systems.
Design 75,000
Construction 900,000
Total funding 975,000
L. Gilmore Hall. Replace and upgrade air conditioning system, phase I.
Design 75,000
Construction 1,500,000
Total funding 1,575,000
M. Cooke field. Replace turf.
Design 75,000
Construction 1,000,000
Total funding 1,075,000
N. Moore hall. Re-roof.
Design 30,000
Construction 200,000
Total funding 230,000
0. Physical science building. Re-roof.
Design 30,000
Construction 200,000
Total funding 230,000
P. Orvis auditorium. Lighting system replacement and upgrade.
Design 40,000
Construction 150,000
Total funding 190,000
Q. Kuykendall hall and annex. General repairs and repainting.
Design 30,000
Construction 270,000
Total funding 300,000
R. Pacific biomedical research center. General repairs and repainting.
Design 20,000
Construction 130,000
Total funding 150,000
S. Music building complex. Repairs to walkways and structural systems.
Design 0
Construction 1,050,000
Total funding 1,050,000
T. College of business administration. Improve exterior drainage.
Design 0
Construction 900,000
Total funding 900,000
U. Physical science building 217, Watanabe buildings 112 and 420 and St. John building 11. Upgrade auditoriums to include replace seating, air conditioning, audio/visual systems and carpeting.
Design 148,000
Construction 1,070,000
Total funding 1,218,000
V. Renovate laboratory spaces of the following buildings, cancer center, Edmundson, HIG, Snyder and MSB. Renovation to include improved lighting, repair health and safety issues and other outstanding repairs and upgrades.
Design 375,000
Construction 2,125,000
Total funding 2,500,000
W. Interior renovations of the following buildings, George hall, HPER, Bilger hall, IFA, physical science building and Spalding hall.
Design 375,000
Construction 2,125,000
Total funding 2,500,000
X. CTAHR Off campus facilities. Interior renovations.
Design 240,000
Construction 1,360,000
Total funding 1,600,000
Y. Campus wide sidewalk repairs. Repair walkways to comply with ADA guidelines.
Design 30,000
Construction 200,000
Total funding 230,000
Z. Holmes, Edmondson and Keller halls. Renovate classroom spaces.
Design 130,000
Construction 1,300,000
Total funding 1,430,000
AA. Snyder hall, Holmes hall, and Bilger add. Renovation of laboratory space.
Design 193,000
Construction 1,620,000
Total funding 1,813,000
BB. Temporary buildings. Refurbish of interior spaces.
Construction 900,000
Total funding 900,000
CC. Hemmenway and Holmes halls and Hamilton library. Improvements and modification to buildings to comply with ADA standards.
Design 200,000
Construction 2,200,000
Total funding 2,400,000
DD. Physical science building, art building and Gilmore hall. Renovate laboratory spaces.
Design 165,000
Construction 1,400,000
Total funding 1,565,000
EE. Art building, biomed courtyard B, MSB 110 and 114, Gartley hall 103, and music #3. Upgrade auditoriums.
Design 165,000
Construction 1,425,000
Total funding 1,590,00
FF. Magoon laboratory agriculture complex. Install security fencing.
Design 25,000
Construction 200,000
Total funding 225,000
GG. Campus wide. Improve and expand irrigation system.
Design 35,000
Construction 215,000
Total funding 250,000
HH. Dean Hall. Repairs to interior and exterior of building.
Design 35,000
Construction 300,000
Total funding 335,000
II. Small animal laboratory. Replace incinerator.
Design 35,000
Construction 165,000
Total funding 200,000
JJ. Lyon arboretum. Renovate interior spaces.
Design 100,000
Construction 500,000
Total funding 600,000
KK. Leahi hospital. Renovate interior spaces.
Design 100,000
Construction 500,000
Total funding 600,000
LL. Holmes hall. Renovation of carpenter shop.
Design 35,000
Construction 250,000
Total funding 285,000
MM. Duke Kahanamoku pool. Repair and upgrade floodlights.
Design 0
Construction 1,000,000
Total funding 1,000,000
NN. Keller hall. Upgrade power distribution systems.
Design 0
Construction 200,000
Total funding 200,000
OO. Food technology building, Orvis auditorium, Korean studies building, and law school. Upgrade exit lighting.
Design 0
Construction 200,000
Total funding 200,000
PP. Moore hall, HIG, MSB, POST, Snyder and Edmondson halls. Replace and upgrade exterior lighting.
Design 0
Construction 300,000
Total funding 300,000
QQ. HIG building. Lighting improvements and retrofits.
Design 40,000
Construction 300,000
Total funding 340,000
RR. KHET and EHSO trailer. Remove transformer and switchgear and raise low aerial drop.
Design 15,000
Construction 75,000
Total funding 90,000
SS. St. John, Gilmore, Watanabe, Bilger addition, Sinclair annexes, Hale Anuenue exterior. Lighting improvements and retrofits.
Design 60,000
Construction 500,000
Total funding 560,000
TT. Edmondson hall. Upgrade power distribution systems.
Design 75,000
Construction 500,000
Total funding 575,000
UU. Art, business administration, Hamilton library I and II, Spalding and Holmes hall. Replace and upgrade switchboards.
Design 50,000
Construction 400,000
Total funding 450,000
VV. Electrical substations. General repairs.
Design 15,000
Construction 100,000
Total funding 115,000
WW. Art Buildings. Replace electrical switchboards and panels.
Design 10,000
Construction 100,000
Total funding 110,000
XX. Hamilton library phases I and II. Replace secondary switchboards.
Design 10,000
Construction 100,000
Total funding 110,000
YY. George hall. Upgrade power distribution systems.
Design 30,000
Construction 200,000
Total funding 230,000
ZZ. Bachmann hall, Sherman lab., Miller hall, and George hall. Lighting improvements and Retrofits.
Design 20,000
Construction 120,000
Total funding 140,000
Al. Biomed, St. John and MSB. Replace refrigeration and freezer systems.
Design 40,000
Construction 400,000
Total funding 440,000
A2. UHS1. Upgrade power distribution systems.
Design 6,000
Construction 44,000
Total funding 50,000
A3. Sherman lab. Upgrade power distribution systems.
Design 30,000
Construction 200,000
Total funding 230,000
A4. Castle memorial hall. Upgrade power distribution systems.
Design 25,000
Construction 230,000
Total funding 255,000
A5. University high school. Upgrade water distribution systems.
Design 40,000
Construction 400,000
Total funding 440,000
A6. Business administration building. Upgrade power distribution systems.
Design 30,000
Construction 300,000
Total funding 330,000
A7. Holmes hall. Upgrade power distribution systems.
Design 30,000
Construction 300,000
Total funding 330,000
A8. Saunders hall. Upgrade power distribution systems.
Design 15,000
Construction 150,000
Total funding 165,000
A9. UHS#. Upgrade power distribution systems.
Design 25,000
Construction 230,000
Total funding 255,000
A10. HPER building. Reroof.
Design 30,000
Construction 250,000
Total funding 280,000
A11. Holmes hall. Reroof.
Design 8,000
Construction 42,000
Total funding 50,000
A12. Music complex. Reroof.
Design 45,000
Construction 300,000
Total funding 345,000
A13. St. Johns (upper roof). Reroof.
Design Funded
Construction 250,000
Total funding 250,000
A14. Hamilton library. Reroof.
Design 30,000
Construction 250,000
Total funding 280,000
A15. Sinclair library. Reroof.
Design 25,000
Construction 250,000
Total funding 275,000
A16. Environmental protection facility. Reroof.
Design 10,000
Construction 40,000
Total funding 50,000
A17. CTAHR-off campus facilities. Reroof.
Design 300,000
Construction 2,000,000
Total funding 2,300,000
A18. Marine science building. Reroof.
Design 30,000
Construction 220,000
Total funding 250,000
A19. New student services building. Reroof.
Design 25,000
Construction 150,000
Total funding 175,000
A20. Engineering quad. Reroof.
Design 20,000
Construction 180,000
Total funding 200,000
A21. Henke hall. Reroof.
Design 15,000
Construction 85,000
Total funding 100,000
A22. Building 37. Reroof.
Design 4,000
Construction 30,000
Total funding 34,000
A23. Watanabe hall. Reroof.
Design 30,000
Construction 250,000
Total funding 280,000
A24. Pope lab. Reroof.
Design 20,000
Construction 175,000
Total funding 195,000
A25. Wist addition. Reroof.
Design 75,000
Construction 425,000
Total funding 500,000
A26. Ag. Science engineering building. Reroof.
Design 30,000
Construction 140,000
Total funding 170,000
A27. Dean hall. Reroof.
Design 20,000
Construction 100,000
Total funding 120,000
A28. Building 171D. Reroof.
Design 8,000
Construction 30,000
Total funding 38,000
A29. Speech pathology and audiology building. Reroof.
Design 8,000
Construction 80,000
Total funding 88,000
A30. Gilmore hall. Reroof.
Design 20,000
Construction 175,000
Total funding 195,000
A31. Saunders hall. Reroof.
Design 12,000
Construction 100,000
Total funding 112,000
A32. Kuykendall hall. Reroof.
Design 18,000
Construction 150,000
Total funding 168,000
A33. 18 temporary buildings. Reroof.
Design 22,000
Construction 214,000
Total funding 236,000
A34. School of architecture. Reroof.
Design 45,000
Construction 425,000
Total funding 470,000
A35. University lab. high school #2. Reroof.
Design 20,000
Construction 125,000
Total funding 145,000
A36. University lab. high school #3. Reroof.
Design 30,000
Construction 175,000
Total funding 205,000
A37. University lab. high school #1. Reroof.
Design 25,000
Construction 150,000
Total funding 175,000
A38. University lab. high school locker room. Reroof.
Design 20,000
Construction 60,000
Total funding 80,000
A39. Castle memorial building. Reroof.
Design 45,000
Construction 300,000
Total funding 345,000
A40. University lab. elementary school. Reroof.
Design 35,000
Construction 240,000
Total funding 275,000
A41. Maile way. Resurface roadway.
Design Funded
Construction 250,000
Total funding 250,000
A42. East-west road. Resurface roadway.
Design Funded
Construction 200,000
A43. UH press. Resurface roadway.
Design 8,000
Construction 40,000
Total funding 48,000
A44. CEA, MSB and campus center. Resurface roadway.
Design 40,000
Construction 250,000
Total funding 290,000
A45. College of education and lab. school. Resurface roadway.
Design 25,000
Construction 150,000
Total funding 175,000
A46. Magoon lab. Resurface roadway.
Design 8,000
Construction 40,000
Total funding 48,000
A47. Motor pool. Resurface roadway.
Design 10,000
Construction 50,000
Total funding 60,000
A48. Mauna Kea. Resurface roadway.
Design 70,000
Construction 500,000
Total funding 570,000
A49. Les Murakami stadium. Replace sports surface.
Design 100,000
Construction 1,200,000
Total funding 1,300,000
A50. Les Murakami stadium. Reroof.
Design 15,000
Construction 100,000
Total funding 115,000
A51. Les Murakami stadium. General mechanical repairs.
Design 35,000
Construction 350,000
Total funding 385,000
A52. Duke Kahanamoku pool. General repairs and repainting.
Design 50,000
Construction 300,000
Total funding 350,000
A53. Cooke field. Replace bleachers.
Design 10,000
Construction 100,000
Total funding 110,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purpose of this Act; provided that all construction and renovation work under this Act work shall meet or exceed the leadership in energy and environmental design silver rating standards for new construction and major renovation work (LEED-NC) and existing building operations (LEED-EB) established by the United States Green Building Council for developing high-performance, sustainable buildings.
SECTION 3. This Act shall take effect on July 1, 2006.