Report Title:
CIP; 33rd, 34th, and 36th Representative Districts
Description:
Appropriates funds for capital improvement projects for the 33rd, 34th, and 36th Representative Districts.
HOUSE OF REPRESENTATIVES |
H.B. NO. |
1615 |
TWENTY-THIRD LEGISLATURE, 2005 |
||
STATE OF HAWAII |
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of the THIRTY-THIRD, thirty-fourth, AND THIRTY-SIXTH representative districtS.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2005-2006:
1. To be expended by the department of accounting and general services:
A. Aiea elementary school, Oahu
Design and construction for upgrade of the electrical system; ground and site improvements; equipment and appurtenances.
Design $ 75,000
Construction $ 425,000
Total Funding $ 500,000
B. Aiea elementary school, Oahu
Design, construction, and equipment for air conditioning of Rooms 41, 104, 108, 111, 204, 208, and 212; ground and site improvements; equipment and appurtenances.
Design $ 50,000
Construction $ 100,000
Equipment $ 25,000
Total Funding $ 175,000
C. Aiea elementary school, Oahu
Design, construction, and equipment for air conditioning of school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 500,000
Total Funding $3,500,000
D. Aiea elementary school, Oahu
Design and construction for covered walkway between building C and cafeteria.
Design $ 5,000
Construction $ 45,000
Total Funding $ 50,000
E. Aiea high school, Oahu
Design and construction for a girls athletic locker room; ground and site improvements; equipment and appurtenances.
Design $ 200,000
Construction $1,800,000
Total Funding $2,000,000
F. Aiea high school, Oahu
Design, construction, and equipment for air conditioning of school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 500,000
Total Funding $3,500,000
G. Aiea high school, Oahu
Design and construction for steps and sidewalk from Ulune street to the school campus.
Design $ 10,000
Construction $ 65,000
Total Funding $ 75,000
H. Aiea high school, Oahu
Design and construction for the renovation of building J.
Design $ 75,000
Construction $ 225,000
Total Funding $ 300,000
I. Aiea high school, Oahu
Design and construction to renovate building J to create a technologically updated facility with space conducive to the integrated learning process on a school wide basis.
Design $ 60,000
Construction $ 270,000
Equipment $ 20,000
Total Funding $ 350,000
J. Aiea high school, Oahu
Traffic study and design and construction for improvements to campus entrance to correct vehicular and pedestrian traffic and safety problems.
Design and study $ 60,000
Construction $ 240,000
Total Funding $ 300,000
K. Aiea intermediate school, Oahu
Provide three portable classrooms for the upcoming school year.
Equipment $ 330,000
Total Funding $ 330,000
L. Aiea intermediate school, Oahu
Design and construction for the upgrade of the electrical system; ground and site improvements; equipment and appurtenances.
Design $ 100,000
Construction $ 650,000
Total Funding $ 750,000
M. Aiea intermediate school, Oahu
Design, construction, and equipment for air conditioning of school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 500,000
Total Funding $3,500,000
N. Aiea intermediate school, Oahu
Design and construction for bus stop overhang; ground and site improvements; equipment and appurtenances.
Design $ 25,000
Construction $ 75,000
Total Funding $ 100,000
O. Alvah A. Scott elementary school, Oahu
Design, construction, and equipment for cattle gates for the parking lot.
Design $ 3,000
Construction $ 20,000
Equipment $ 7,000
Total Funding $ 30,000
P. Alvah A. Scott elementary school, Oahu
Plans and design for a multimedia center or multipurpose building above the library.
Plans $ 50,000
Design $ 100,000
Total Funding $ 150,000
Q. Alvah A. Scott elementary school, Oahu
Design and construction of an outdoor stage; ground and site improvements; equipment and appurtenances.
Design $ 1,000
Construction $ 7,000
Total Funding $ 8,000
R. Alvah A. Scott elementary school, Oahu
Design and construction to concrete the portion of school bordering the H-1 freeway; ground and site improvements; equipment and appurtenances.
Design $ 4,000
Construction $ 16,000
Total Funding $ 20,000
S. Leeward community college, Oahu
Planning and design for a new social science facility and additional surface parking spaces to address parking shortage on campus.
Planning $ 367,000
Design $ 944,000
Total Funding $1,311,000
T. Manana elementary school, Oahu
Design and construction of ramps, elevators, and other corrective measures for buildings K and J for accessibility of school facilities to handicapped persons.
Design $ 12,000
Construction $ 30,000
Total Funding $ 42,000
U. Momilani elementary school, Oahu
Design and construction of a retaining wall behind building B to stop soil erosion.
Design $ 20,000
Construction $ 100,000
Total Funding $ 120,000
V. Palisades elementary school, Oahu
Design and construction of a retaining wall behind building D parking stalls bordering the city and county playground property.
Design $ 140,000
Construction $ 700,000
Total Funding $ 840,000
W. Pearl City elementary school, Oahu
Design and construction for the extension of the school parking lot; ground and site improvements; and equipment and accessories.
Design $ 12,000
Construction $ 60,000
Total Funding $ 72,000
X. Pearl City elementary school, Oahu
Design, construction, and equipment for the extension of the library building; ground and site improvements; and equipment and accessories.
Design $ 100,000
Construction $ 500,000
Total Funding $ 600,000
Y. Pearl City elementary school, Oahu
Design, construction, and equipment for air conditioning of buildings F and G; equipment and accessories.
Design $ 36,000
Construction $ 180,000
Total Funding $ 216,000
Z. Pearl City high school, Oahu
Plans, design, construction, and equipment for a two story building for athletic training room and weight training and rehabilitation facility with amenities and accessibility for handicapped persons.
Plans $ 50,000
Design $ 150,000
Construction $1,250,000
Equipment $ 50,000
Total Funding $1,500,000
AA. Pearl City highlands elementary school, Oahu
Design and construction of a covering for existing sidewalk located between buildings H (library) and F (cafe).
Design $ 16,000
Construction $ 84,000
Total Funding $ 100,000
BB. Pearl Ridge elementary school, Oahu
Plans, design and construction for expansion of the cafeteria.
Plans $ 1,000
Design $ 150,000
Construction $ 799,000
Total Funding $ 950,000
CC. Pearl Ridge elementary school, Oahu
Design, construction, and equipment for air conditioning for school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 500,000
Total Funding $3,500,000
DD. Red Hill elementary school, Oahu
Plans, design, and construction for structural and drainage improvements.
Plans $ 5,000
Design $ 45,000
Construction $ 200,000
Total Funding $ 250,000
EE. Red Hill elementary school, Oahu
Design and construction for the provision of ramps, elevators, and other corrective measures for accessibility of school facilities to physically challenged persons; ground and site improvements; equipment and appurtenances.
Design $ 60,000
Construction $ 290,000
Total Funding $ 350,000
FF. Red Hill elementary school, Oahu
Design, construction, and equipment for air conditioning of school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 500,000
Total Funding $3,500,000
GG. Waimalu elementary school, Oahu
Design, construction, and equipment for air conditioning of school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 500,000
Total Funding $3,500,000
HH. Waimalu elementary school, Oahu
Design and construction for drainage swale; ground and site improvements; equipment and appurtenances.
Design $ 5,000
Construction $ 45,000
Total Funding $ 50,000
II. Waimalu elementary school, Oahu
Design and construction for electrical upgrade and installation of air conditioning systems for buildings D and E.
Design $ 165,000
Construction $2,200,000
Total Funding $2,365,000
JJ. Waimalu elementary school, Oahu
Plans, design, and construction for expansion of the school library.
Plans $ 11,000
Design $ 66,000
Construction $ 770,000
Total Funding $ 847,000
KK. Webling elementary school, Oahu
Design and construction for the provision of ramps, elevators, and other corrective measures for accessibility of school facilities to physically challenged persons; ground and site improvements; equipment and appurtenances.
Design $ 60,000
Construction $ 290,000
Total Funding $ 350,000
LL. Webling elementary school, Oahu
Design, construction, and equipment for air conditioning of school; ground and site improvements; equipment and appurtenances.
Design $1,000,000
Construction $2,000,000
Equipment $ 50,000
Total Funding $3,500,000
MM. Arizona memorial visitor center, Oahu
Design and construction for the center.
Design $
Construction $
Total Funding $3,000,000
NN. Arizona memorial visitor center, Oahu
Plans, design, and construction for improvements to directional signs on highways, freeways, and roads to the center.
Plans $ 1,000
Design $ 1,000
Construction $ 48,000
Total Funding $ 50,000
OO. Halawa correctional facility, Oahu
Life safety code improvements and replacement of MSF roofing system.
Plans, design, and construction for fire and life safety code improvements and replacement of the existing roofing system.
Plans $ 35,000
Design $ 232,000
Construction $2,615,000
Total Funding $2,882,000
PP. Interstate route H-1 widening, eastbound, Waiau interchange to Halawa interchange, Oahu.
Design for the widening of H-1 East bound freeway and viaduct structure. This project is deemed necessary to qualify for federal aid financing, reimbursement, or both.
Design $4,000,000
Total Funding $4,000,000
2. To be expended by the department of transportation:
A. Highways, Oahu
Design and construction of sound barrier structure adjacent to the H-1 freeway and the residential area of Puakala street, Poopala street, and Laka street.
Noise level study $ 75,000
Design and Construction $12,000,000
Total Funding $12,075,000
B. Highways, Oahu
Design, construction, and repair of the east bound Moanalua freeway on-ramp at the Aiea access ramp.
Design and Construction $3,500,000
Total Funding $3,500,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2005.
INTRODUCED BY: |
_____________________________ |