SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2005-2006:

1. To be expended by the department of accounting and

general services:

A. Kauai veterans memorial hospital, Kauai

Construction to renovate the emergency, recovery, and operating rooms to include acquisition of two vacant lots and the construction of a new emergency room parking area.

Construction $6,565,000

Total funding $6,565,000

B. Kauai veterans memorial hospital, Kauai

Design, construction, and equipment for a two-story building and associated parking infrastructure to accommodate physical therapy, respiratory therapy, occupational therapy, dietary, conference rooms, administration, and long-term care and to include a solar voltaic system to reduce operational electrical cost to enhance existing energy conservation measures.

Design $1,000

Construction $1,698,000

Equipment $1,000

Total funding $1,700,000

C. Kauai veterans memorial hospital, Kauai

Plans, design, and construction of electrical upgrades to correct various code violations of the national electrical code.

Plans $1,000

Design $1,000

Construction $948,000

Total funding $950,000

D. Kauai veterans memorial hospital, Kauai

Design for expansion of the radiology department.

Design $120,000

Total funding $120,000

E. Kauai veterans memorial hospital, Kauai

Plans, design, construction, and equipment to replace emergency generator and associated equipment.

Plans $1,000

Design $1,000

Construction $647,000

Equipment $1,000

Total funding $650,000

F. Samuel Mahelona memorial hospital, Kauai

Plans, design, and construction to renovate existing patient care areas to include, but not limited to, patient rooms, activity areas, nurses stations, and hallways.

Plans $1,000

Design $1,000

Construction $10,898,000

Total funding $10,900,000

G. Samuel Mahelona memorial hospital, Kauai

Plans, design, and construction to install a solar voltaic system to reduce the operational cost of electricity.

Plans $1,000

Design $1,000

Construction $1,148,000

Total funding $1,150,000

H. Samuel Mahelona memorial hospital, Kauai

Plans, design, and construction to replace all electrical apparatus, boxes, raceways, hangers, and conductors in the crawl space under the building and exterior walkways. Also rectify various code violations.

Plans $1,000

Design $1,000

Construction $628,000

Total funding $630,000

I. Samuel Mahelona memorial hospital, Kauai

Plans, design, construction, and equipment to replace existing hot water, cold water, waste water system, and associate equipment.

Plans $1,000

Design $1,000

Construction $297,000

Equipment $1,000

Total funding $300,000

J. Samuel Mahelona memorial hospital, Kauai

Plans, design, and construction to repave existing roads and parking lots to include, but not limited to, replacing curbing, signs, and overhead street/parking lighting.

Plans $1,000

Design $1,000

Construction $648,000

Total funding $650,000

K. Koloa, Kauai

Plans, design, and construction of new twenty thousand square foot library.

Plans $1,000

Design $1,000

Construction $7,998,000

Total funding $8,000,000

L. Hanapepe, Kauai

Plans, design, and construction to renovate existing library.

Plans $1,000

Design $1,000

Construction $1,498,000

Total funding $1,500,000

M. Kilauea elementary school, Kauai

Design and construction of relocated cafeteria.

Design $1,000

Construction $2,999,000

Total funding $3,000,000

N. Kapaa elementary school, Kauai

Design and construction of new library.

Design $1,000

Construction $5,439,000

Total funding $5,440,000

O. Kapaa high school, Kauai

Design and construction of new and expanded administration building and renovation of existing structure.

Design $1,000

Construction $4,514,000

Total funding $4,515,000

P. Kapaa high school, Kauai

Plans, design, and construction for renovation of

covered walkway.

Plans $1,000

Design $1,000

Construction $148,000

Total funding $150,000

Q. Waimea high school, Kauai

Design and construction of new or expanded library, and renovate existing structure.

Design $1,000

Construction $4,644,000

Total funding $4,645,000

R. Waimea high school, Kauai

Design and construction of new six-classroom building.

Design $1,000

Construction $9,089,000

Total funding $9,090,000

S. Kauai high school, Kauai

Design and construction of new gymnasium.

Design $1,000

Construction $10,834,000

Total funding $10,835,000

T. Kekaha elementary school, Kauai

Design and construction of new six-classroom building to replace building C.

Design $1,000

Construction $5,584,000

Total funding $5,585,000

U. Kalaheo elementary school, Kauai

Design and construction of new playcourt.

Design $1,000

Construction $499,000

Total funding $500,000

2. To be expended by the department of land and natural resources:

A. Kokee/Waimea Canyon state park, Kauai

Construction to complete water system improvements pursuant to project No. F46C732A.

Construction $3,000,000

Total funding $3,000,000

B. Na Pali Coast state park, Kauai

Plans, design, and construction to restore and stabilize trail.

Plans $1,000

Design $1,000

Construction $1,748,000

Total funding $1,750,000

C. Kokee state park, Kauai

Plans, design, and construction for the widening of Kokee road.

Plans $1,000

Design $1,000

Construction $598,000

Total funding $600,000

D. Wailua river state park, Kauai

Design and construction of road and parking improvements.

Design $1,000

Construction $499,000

Total funding $500,000

E. Haena state park, Kauai

Plans, design, and construction to complete the state park's master plan.

Plans $1,000

Design $1,000

Construction $248,000

Total funding $250,000

F. Waiakaea canal, Kauai

Plans, design, and construction to dredge and modify the canal from the entrance to the launch ramp, and to add rocks to the breakwater.

Plans $1,000

Design $1,000

Construction $633,000

Total funding $635,000

G. Wailua river, Kauai

Plans, design, and construction for dredging the channel and building boat piers.

Plans $1,000

Design $1,000

Construction $1,240,000

Total funding $1,242,000

H. Wailua marina, Kauai

Plans, design, and construction to repair and repave the roadway from highway fifty-six to the marina and the marina parking area.

Plans $1,000

Design $1,000

Construction $498,000

Total funding $500,000

3. To be expended by the department of transportation:

A. Nawiliwili harbor channel, Kauai

Plans and design to deepen and widen the channel and other improvements to the entrance of the harbor.

Plans $1,000

Design $374,000

Total funding $375,000

B. Port Allen harbor, Kauai

Plans and design to deepen and widen the harbor and other improvements to the entrance of the harbor.

Plans $1,000

Design $499,000

Total funding $500,000

C. Lihue airport, Kauai

Construction of a perimeter road and fence to meet safety and security requirements.

Construction $4,332,000

Total funding $4,332,000

D. Lihue airport, Kauai

Construction to restore the Ahukini dump at Lihue airport.

Construction $1,200,000

Total funding $1,200,000

E. Kaumualii highway, Kauai

Construction for widening Kaumualii highway between Lihue and Kipu, from two to four lanes.

Construction $31,000,000

Total funding $31,000,000

F. Kuhio highway, Kauai

Plans and design for a new Kapaa bypass and/or widening sections of Kuhio highway.

Plans $1,000

Design $3,999,000

Total funding $4,000,000

G. State highways, Kauai

Plans, design, and construction for installation and/or upgrading guardrails, and shoulder improvements.

Plans $1,000

Design $1,000

Construction $1,998,000

Total funding $2,000,000

H. Kuhio highway, Kauai

Land acquisition for retaining wall.

Land $100,000

Total funding $100,000

I. State highways, Kauai

Design and construction for miscellaneous improvements to existing intersections and highway facilities necessary for improved traffic operations.

Design $1,000

Construction $1,999,000

Total funding $2,000,000

J. Kuamoo road, Kauai

Construction for replacing an existing retaining wall in the vicinity of mile post 1.1.

Construction $935,000

Total funding $935,000

K. Kamualii highway, Kauai

Construction and reconstruction of retaining walls and other improvements at various locations.

Construction $1,225,000

Total funding $1,225,000

L. Kuhio highway, Kauai

Construction to replace Wainiha bridges numbers one, two, and three.

Construction $25,000,000

Total funding $25,000,000

M. Waimea Canyon drive/Kokee Road, Kauai

Design for future construction of paved shoulders, guardrail installation, pavement markings, and signs in the vicinity of mile post zero to mile post fourteen.

Design $500,000

Total funding $500,000

N. Kuhio highway, Kauai

Land acquisition of a multi-tee beam reinforced concrete girder bridge on Kuhio highway in the vicinity of Kapaia.

Land $750,000

Total funding $750,000

O. Kapule highway/Rice street/Waapa road, Kauai

Land acquisition and design for the improvement of Kapule highway, Rice street, and Waapa road, and strengthening/widening Nawiliwili bridge.

Design $1,000

Land $1,499,000

Total funding $1,500,000

P. Kuhio highway, Kauai

Land acquisition and design for the replacement of Waioli stream bridge, Waipa stream bridge, and Waikoko stream bridge on Kuhio highway, route 560.

Design $1,000

Land $2,399,000

Total funding $2,400,000

4. To be expended by the county of Kauai:

A. Kilauea water system, Kauai

Design and construction of ductile iron waterline providing fire protection for Kilauea school.

Design $1,000

Construction $119,000

Total funding $120,000

B. Hanalei water system, Kauai

Design and construction of ductile iron waterline providing fire protection for Hanalei school.

Design $1,000

Construction $514,000

Total funding $515,000

C. Waimea water system, Kauai

Construction to install waterline providing fire protection for Waimea canyon school.

Construction $110,000

Total funding $110,000

D. Wailua-Kapaa water system, Kauai

Design and construction of a half-million gallon tank for Kapaa storage improvements.

Design $1,000

Construction $3,749,000

Total funding $3,750,000

E. Wailua-Kapaa water system, Kauai

Plans, design, and construction for Kawaihau and Kahuna roads twelve-inch and sixteen-inch water mains.

Plans $1,000

Design $1,000

Construction $3,298,000

Total funding $3,300,000

F. Wainiha-Haena water system, Kauai

Design, construction, and equipment for a one hundred thousand gallon storage tank, booster pump station, connecting pipeline, and appurtenances.

Design $1,000

Construction $1,723,000

Equipment $1,000

Total funding $1,725,000

G. Anahola water system, Kauai

Plans, design, construction, and equipment for drilling and testing, pump, electrical controls, connecting pipeline, and appurtenances for Anahola well number four.

Plans $1,000

Design $1,000

Construction $2,447,000

Equipment $1,000

Total funding $2,450,000

H. Kilauea water system, Kauai

Design, construction, and land acquisition for permit system improvements and other structural improvements.

Design $1,000

Land $1,000

Construction $2,698,000

Total funding $2,700,000

I. Emergency homeless shelter, Kauai

Design and construction of emergency homeless shelter.

Design $1,000

Construction $649,000

Total funding $650,000

J. Waimea high school district swimming pool, Kauai

Plans, design, and construction to renovate and restore existing swimming pool to meet department of health regulations.

Plans $1,000

Design $1,000

Construction $698,000

Total funding $700,000

K. Kauai affordable housing feasibility study, Kauai

Plans to conduct a market study and environmental assessment study.

Plans $250,000

Total funding $250,000

L. Regional stadium complex (Antone Vidinha stadium complex - phase III), Kauai

Design and construction for baseball lighting and grandstand improvements.

Design $1,000

Construction $899,000

Total funding $900,000

M. Kalepa village rental apartments – phase four, Kauai

Plans, design, and construction to prepare plot plans in concurrence with current ADA requirements.

Plans $1,000

Design $1,000

Construction $998,000

Total funding $1,000,000

N. Solid waste facilities, Kauai

Plans and design to identify and evaluate disposal alternatives, selection of preferred disposal method, site selection, environmental assessment, and permitting.

Plans $1,000

Design $431,000

Total funding $432,000

O. Wailua-Kapaa sewer system, Kauai

Prepare new Wailua-Kapaa wastewater facilities plan.

Plans $400,000

Total funding $400,000

P. Kilauea bridge, Kauai

Plans, design, and construction to replace twenty foot wide by ninety-two foot long concrete bridge with a new thirty-five foot wide by one hundred ten foot long concrete bridge.

Plans $1,000

Design $1,000

Construction $398,000

Total funding $400,000

Q. Antone K. Vidinha stadium complex improvements, Kauai

Design and construction of lighting, baseball field, and a multipurpose gym/arena.

Design $1,000

Construction $399,000

Total funding $400,000

R. Drainage master plan, Kapaa/Wailua area, Kauai

Prepare a detailed master plan to supplement the general plan.

Plans $175,000

Total funding $175,000

S. Wailua house lots drainage facilities, Kauai

Plans, design, land, and construction for flood control drainage facilities and appurtenances.

Plans $1,000

Design $1,000

Land $1,000

Construction $1,097,000

Total funding $1,100,000