Measure Title: | RELATING TO PUBLIC UTILITIES. |
Report Title: | Public Utilities; Avoided Costs; Externalities |
Description: | Requires the public utilities commission to monetize external costs, e.g. environmental costs, associated with electricity generation. Requires the use of external costs when evaluating resource options and public need and necessity in commission proceedings. |
Package: | None |
Companion: | |
Introducer(s): | MORITA, EVANS, LEE, SCHATZ, SHIMABUKURO, THIELEN, WAKAI |
Current Referral: | EEP, CPC |
Date | Status Text | |
---|---|---|
1/26/2005 | H | Pending introduction. |
1/27/2005 | H | Introduced and Pass First Reading. |
1/31/2005 | H | Referred to EEP, CPC, referral sheet 7 |
$ = Appropriation measure