Report Title:

State Budget

Description:

Supplemental Budget

HOUSE OF REPRESENTATIVES

H.B. NO.

1800

TWENTY-SECOND LEGISLATURE, 2004

STATE OF HAWAII

H.D. 1

S.D. 1

 


A BILL FOR AN ACT

 

RELATING TO THE STATE BUDGET.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. This Act shall be known and may be cited as the Supplemental Appropriations Act of 2004.

SECTION 2. This Act amends Act 200, Session Laws of Hawaii 2003, and other appropriations and authorizations effective during fiscal biennium 2003-2005.

SECTION 3. Act 200, Session Laws of Hawaii 2003, is amended by amending section 3 to read as follows:

"SECTION 3. APPROPRIATIONS. The following sums, or so much thereof as may be sufficient to accomplish the purposes and programs designated herein, are hereby appropriated or authorized, as the case may be, from the means of financing specified to the expending agencies designated for the fiscal biennium beginning July 1, 2003, and ending June 30, 2005. The total expenditures and the number of positions in each fiscal year of the biennium shall not exceed the sums and the number indicated for each fiscal year, except as provided elsewhere in this Act, or as provided by general law.

A. ECONOMIC DEVELOPMENT

1. BED101 - BUSINESS DEVELOPMENT AND MARKETING

15.00* 15.00*_

OPERATING BED 1,655,276A [ 1,600,391A]

1,600,750A_

BED N 250,000N_

INVESTMENT CAPITAL BED C 350,000C_

2. BED102 - BUSINESS SERVICES

12.00* [ 14.00*]

13.00*_

OPERATING BED 1,453,865A [ 1,529,129A]

1,516,665A_

BED 199,768B [ 199,768B]

B_

2.00* [ 2.00*]

*_

BED 963,832W [ 821,915W]

1,821,915W_

3. BED107 - FOREIGN TRADE ZONE

21.00* [ 21.00*]

19.00*_

OPERATING BED 1,951,051B [ 1,951,051B]

1,890,883B_

INVESTMENT CAPITAL BED C 250,000C_

BED N 1,900,000N_

4. BED120 - ENERGY AND NATURAL RESOURCES

12.00* [ 12.00*]

11.00*_

OPERATING BED 1,160,057A [ 1,160,057A]

1,117,875A_

BED 3,314,706N [ 3,314,706N]

3,529,193N_

5. BED142 - GENERAL SUPPORT FOR ECONOMIC DEVELOPMENT

32.00* 32.00*_

OPERATING BED 1,935,045A [ 1,935,045A]

1,885,911A_

6. BED113 - TOURISM

OPERATING BED 25,000A _

3.00* 3.00*_

BED 109,000,000B [ 109,000,000B]

108,801,082B_

INVESTMENT CAPITAL BED C 2,700,000C_

7. AGR101 - FINANCIAL ASSISTANCE FOR AGRICULTURE

10.00* [ 10.00*]

9.00*_

OPERATING AGR 1,016,965B [ 1,025,173B]

936,241B_

AGR 5,000,000W 5,000,000W_

8. AGR122 - PLANT, PEST, AND DISEASE CONTROL

94.00* [ 94.00*]

81.00*_

OPERATING AGR 4,485,502A [ 4,485,502A]

4,231,000A_

AGR 324,581N [ 324,581N]

201,101N_

AGR 363,600T [ 363,600T]

488,600T_

1.00* [ 1.00*]

*_

AGR 171,165U [ 171,165U]

141,549U_

AGR 58,360W 58,360W_

9. AGR131 - RABIES QUARANTINE

45.00* [ 45.00*]

42.00*_

OPERATING AGR 3,025,264B [ 3,027,864B]

2,822,125B_

10. AGR132 - ANIMAL DISEASE CONTROL

23.50* [ 23.50*]

21.50*_

OPERATING AGR 1,155,974A [ 1,155,974A]

1,091,516A_

AGR 282,481U [ 282,481U]

371,663U_

11. LNR172 - FORESTRY - PRODUCTS DEVELOPMENT

19.00* [ 19.00*]

18.00*_

OPERATING LNR 722,154A [ 722,154A]

695,562A_

LNR 700,000B 700,000B_

3.00* [ 3.00*]

2.00*_

LNR 425,193N [ 425,193N]

412,425N_

12. AGR151 - QUALITY AND PRICE ASSURANCE

29.00* [ 29.00*]

27.00*_

OPERATING AGR 1,406,243A [ 1,406,243A]

1,346,060A_

2.00* 2.00*_

AGR 262,492B 262,492B_

AGR 52,424N 52,424N_

AGR 300,000T 300,000T_

AGR 447,132W [ 451,112W]

301,040W_

13. AGR171 - AGRICULTURAL DEVELOPMENT AND MARKETING

19.00* [ 19.00*]

17.00*_

OPERATING AGR 1,367,296A [ 1,367,296A]

1,295,623A_

AGR 75,000N 75,000N_

14. AGR141 - AGRICULTURAL RESOURCE MANAGEMENT

2.00* [ 2.00*]

4.00*_

OPERATING AGR 253,401A [ 253,401A]

261,651A_

3.00* 3.00*_

AGR 390,907B [ 391,097B]

380,551B_

10.00* 10.00*_

AGR 1,064,811W [ 1,064,811W]

1,054,265W_

INVESTMENT CAPITAL AGR 2,550,000C [ C]

2,600,000C_

AGR 150,000N N_

15. AGR161 - AGRIBUSINESS DEVELOPMENT AND RESEARCH

1.00* 1.00*_

OPERATING AGR 735,279A 685,279A_

AGR 3,396,826W [ 3,346,826W]

3,306,826W_

16. AGR192 - GENERAL ADMINISTRATION FOR AGRICULTURE

29.00* [ 29.00*]

28.00*_

OPERATING AGR 1,510,188A [ 1,510,188A]

1,518,600A_

17. LNR153 - COMMERCIAL FISHERIES AND RESOURCE ENHANCEMENT

9.00* 9.00*_

OPERATING LNR 762,186A [ 762,186A]

674,327A_

LNR 300,000B [ 300,000B]

314,193B_

LNR 308,210N 308,210N_

18. AGR153 - AQUACULTURE DEVELOPMENT PROGRAM

8.00* [ 8.00*]

6.00*_

OPERATING AGR 490,996A [ 490,996A]

426,538A_

AGR 30,000B 30,000B_

AGR 78,747N 78,747N_

INVESTMENT CAPITAL AGR 500,000C C_

19. BED143 - HIGH TECHNOLOGY DEVELOPMENT CORPORATION

1.50* 1.50*_

OPERATING BED 1,178,663A 1,046,884A_

1.50* 1.50*_

BED 2,080,223B 2,218,427B_

BED 2,006,787N [ 2,006,787N]

22,779,057N_

BED 1,500,000W 1,500,000W_

INVESTMENT CAPITAL BED C 2,000,000C_

BED E 8,405,000E_

20. BED145 - HAWAII STRATEGIC DEVELOPMENT CORPORATION

OPERATING BED 153,297A_

BED 427,262W _

21. BED146 - NATURAL ENERGY LABORATORY OF HAWAII AUTHORITY

OPERATING BED 597,510A [ 397,790A]

356,624A_

BED 2,607,180B [ 3,661,122B]

3,619,956B_

BED 6,550,213N [ 6,550,213N]

6,800,000N_

INVESTMENT CAPITAL BED C 840,000C_

22. LNR141 - WATER AND LAND DEVELOPMENT

3.00* 3.00*_

OPERATING LNR 275,779A 275,779A_

LNR 110,000W 110,000W_

INVESTMENT CAPITAL LNR 1,400,000C [ C]

2,200,000C_

23. BED150 - HAWAII COMMUNITY DEVELOPMENT AUTHORITY

2.00* 2.00*_

OPERATING BED 139,537A 139,537A_

BED 2,500,000B 2,500,000B_

17.00*_

BED 207,000W [ 205,000W]

1,566,589W_

INVESTMENT CAPITAL BED 1,312,000C [ 1,327,000C]

3,000,000C_

BED E 20,000,000E_

24. BED151 - ALOHA TOWER DEVELOPMENT CORPORATION

1.00* [ 1.00*]

*_

OPERATING BED 1,525,689B [ 1,525,689B]

1,486,197B_

 

B. EMPLOYMENT

1. LBR111 - PLACEMENT SERVICES

4.30* 4.30*_

OPERATING LBR 282,455A 282,455A_

LBR 9,800,412B [ 9,800,412B]

9,614,275B_

119.20* [ 119.20*]

107.70*_

LBR 49,182,640N [ 49,182,640N]

47,671,048N_

LBR 1,316,913U [ 1,330,287U]

1,132,971U_

2. LBR135 - WORKFORCE DEVELOPMENT COUNCIL

3.00* 3.00*_

OPERATING LBR 174,335A [ 174,335A]

199,335A_

LBR 432,921N [ 432,921N]

388,957N_

3. LBR143 - OCCUPATIONAL SAFETY AND HEALTH

43.00* [ 43.00*]

35.00*_

OPERATING LBR 2,156,437A [ 2,156,437A]

1,797,295A_

25.00* [ 25.00*]

21.00*_

LBR 1,821,121N [ 1,821,121N]

1,947,894N_

4. LBR152 - WAGE STANDARDS AND FAIR EMPLOYMENT PRACTICES

27.35* [ 27.35*]

23.50*_

OPERATING LBR 1,198,926A [ 1,198,926A]

1,033,111A_

LBR 53,131U 53,131U_

5. LBR153 - CIVIL RIGHTS COMMISSION

21.50* 21.50*_

OPERATING LBR 1,117,684A [ 1,117,684A]

1,080,220A_

4.00* [ 4.00*]

3.00*_

LBR 467,646N [ 467,646N]

413,376N_

6. LBR161 - PUBLIC AND PRIVATE EMPLOYMENT

2.00* [ 2.00*]

*_

OPERATING LBR 459,538A [ 459,538A]

382,134A_

7. LBR171 - UNEMPLOYMENT COMPENSATION

OPERATING LBR 166,610,592B 166,610,592B_

231.90* [ 231.90*]

209.55*_

LBR 14,663,088N [ 14,663,088N]

14,008,075N_

8. LBR183 - DISABILITY COMPENSATION

112.00* [ 112.00*]

111.00*_

OPERATING LBR 4,868,853A 4,868,853A_

4.00* 4.00*_

LBR 23,675,713B 23,675,713B_

9. HMS802 - VOCATIONAL REHABILITATION

26.57* [ 26.57*]

24.72*_

OPERATING HMS 3,865,138A [ 3,825,138A]

3,767,630A_

93.93* [ 93.93*]

86.28*_

HMS 10,719,862N [ 10,784,036N]

10,542,366N_

HMS 1,330,200W 1,330,200W_

INVESTMENT CAPITAL HMS 500,000C C_

10. LBR901 - DLIR - DATA GATHERING, RESEARCH, AND ANALYSIS

8.88* 8.88*_

OPERATING LBR 691,653A 691,653A_

29.12* [ 29.12*]

23.12*_

LBR 2,398,369N [ 2,398,369N]

2,143,755N_

11. LBR902 - GENERAL ADMINISTRATION

27.66* [ 27.66*]

28.46*_

OPERATING LBR 1,459,237A [ 1,459,237A]

1,440,145A_

36.68* [ 36.68*]

28.74*_

LBR 2,930,195N [ 2,930,195N]

2,511,222N_

12. LBR903 - OFFICE OF COMMUNITY SERVICES

4.00* 4.00*_

OPERATING LBR 4,461,565A [ 4,321,565A]

4,721,565A_

3.00* 3.00*_

LBR 5,909,960N [ 5,909,960N]

5,789,741N_

INVESTMENT CAPITAL LBR 3,825,000C C_

13. LBR812 - LABOR AND INDUSTRIAL RELATIONS APPEALS BOARD

12.00* 12.00*_

OPERATING LBR 675,316A 675,316A_

 

C. TRANSPORTATION FACILITIES

1. TRN102 - HONOLULU INTERNATIONAL AIRPORT

648.75* [ 648.75*]

587.00*_

OPERATING TRN 103,919,080B [ 90,967,840B]

89,361,000B_

TRN 4,415,000N 2,600,000N_

INVESTMENT CAPITAL TRN 700,000B [ B]

525,000B_

TRN 3,800,000E [ 20,000,000E]

32,250,000E_

TRN 6,000,000N [ 25,000,000N]

42,725,000N_

TRN 2,300,000X X_

2. TRN104 - GENERAL AVIATION

30.00* 30.00*_

OPERATING TRN 5,124,225B 5,075,932B_

INVESTMENT CAPITAL TRN 50,000B 50,000B_

TRN 400,000N_

3. TRN111 - HILO INTERNATIONAL AIRPORT

80.00* [ 80.00*]

78.00*_

OPERATING TRN 11,416,928B [ 14,631,182B]

14,562,518B_

INVESTMENT CAPITAL TRN 750,000B [ B]

100,000B_

TRN 300,000E E_

TRN 600,000N [ N]

600,000N_

4. TRN114 - KONA INTERNATIONAL AIRPORT AT KEAHOLE

94.00* [ 94.00*]

81.00*_

OPERATING TRN 13,125,007B [ 10,455,041B]

10,092,617B_

TRN 495,000N 693,000N_

INVESTMENT CAPITAL TRN 1,500,000E E_

5. TRN116 - WAIMEA-KOHALA AIRPORT

2.00* 2.00*_

OPERATING TRN 493,178B 271,978B_

6. TRN118 - UPOLU AIRPORT

OPERATING TRN 62,889B 28,389B_

7. TRN131 - KAHULUI AIRPORT

172.00* [ 172.00*]

151.00*_

OPERATING TRN 21,220,868B [ 23,516,579B]

22,962,995B_

INVESTMENT CAPITAL TRN B 1,000,000B_

TRN 7,500,000E [ E]

17,500,000E_

TRN 14,120,000N [ N]

15,395,000N_

8. TRN133 - HANA AIRPORT

2.00* [ 2.00*]

1.00*_

OPERATING TRN 1,105,272B [ 122,272B]

92,596B_

9. TRN135 - KAPALUA AIRPORT

6.00* 6.00*_

OPERATING TRN 1,381,018B 876,018B_

10. TRN141 - MOLOKAI AIRPORT

15.00* [ 15.00*]

13.00*_

OPERATING TRN 1,994,732B [ 2,665,506B]

2,611,266B_

INVESTMENT CAPITAL TRN E 300,000E_

11. TRN143 - KALAUPAPA AIRPORT

1.00* 1.00*_

OPERATING TRN 350,727B 50,727B_

12. TRN151 - LANAI AIRPORT

10.00* 10.00*_

OPERATING TRN 2,106,132B 1,698,702B_

INVESTMENT CAPITAL TRN E 150,000E_

13. TRN161 - LIHUE AIRPORT

108.00* [ 108.00*]

102.00*_

OPERATING TRN 12,437,656B [ 12,917,212B]

12,773,674B_

TRN 577,500N _

INVESTMENT CAPITAL TRN 2,500,000B B_

TRN 9,000,000E E_

14. TRN163 - PORT ALLEN AIRPORT

OPERATING TRN 1,860B 1,860B_

15. TRN195 - AIRPORTS ADMINISTRATION

117.00* [ 117.00*]

98.00*_

OPERATING TRN 94,107,898B [ 109,154,424B]

163,458,580B_

INVESTMENT CAPITAL TRN 10,025,000B [ 6,275,000B]

9,125,000B_

TRN 4,700,000N [ 100,000N]

5,620,000N_

16. TRN301 - HONOLULU HARBOR

123.00* [ 123.00*]

110.00*_

OPERATING TRN 15,279,434B [ 14,359,029B]

18,664,394B_

INVESTMENT CAPITAL TRN 250,000B [ 2,500,000B]

16,550,000B_

TRN 34,500,000E [ E]

31,500,000E_

17. TRN303 - KALAELOA BARBERS POINT HARBOR

3.00* 3.00*_

OPERATING TRN 536,987B [ 536,987B]

659,291B_

INVESTMENT CAPITAL TRN 400,000B_

18. TRN305 - KEWALO BASIN

2.00* 2.00*_

OPERATING TRN 978,555B [ 1,059,555B]

1,259,555B_

19. TRN311 - HILO HARBOR

15.00* [ 15.00*]

13.00*_

OPERATING TRN 1,803,631B [ 1,832,047B]

1,880,985B_

INVESTMENT CAPITAL TRN B 575,000B_

20. TRN313 - KAWAIHAE HARBOR

1.00* 1.00*_

OPERATING TRN 770,521B [ 519,105B]

548,422B_

21. TRN331 - KAHULUI HARBOR

16.00* [ 16.00*]

15.00*_

OPERATING TRN 2,176,650B [ 2,138,650B]

2,262,166B_

INVESTMENT CAPITAL TRN 1,500,000E E_

22. TRN341 - KAUNAKAKAI HARBOR

1.00* 1.00*_

OPERATING TRN 612,060B 462,060B_

23. TRN361 - NAWILIWILI HARBOR

15.00* [ 15.00*]

13.00*_

OPERATING TRN 1,733,652B [ 1,734,652B]

1,973,626B_

INVESTMENT CAPITAL TRN 300,000B B_

24. TRN363 - PORT ALLEN HARBOR

1.00* 1.00*_

OPERATING TRN 332,836B 293,836B_

25. TRN351 - KAUMALAPAU HARBOR

OPERATING TRN 257,000B 257,000B_

26. TRN395 - HARBORS ADMINISTRATION

62.00* [ 62.00*]

52.00*_

OPERATING TRN 42,752,096B [ 40,073,733B]

39,715,457B_

INVESTMENT CAPITAL TRN 9,275,000B [ 1,775,000B]

1,915,000B_

TRN 2,000,000N N_

27. TRN501 - OAHU HIGHWAYS

264.00* [ 264.00*]

227.00*_

OPERATING TRN 44,368,085B [ 44,490,720B]

43,372,444B_

TRN 800,000N 800,000N_

INVESTMENT CAPITAL TRN 42,995,000E [ 2,365,000E]

12,755,000E_

TRN 43,020,000N [ 9,460,000N]

36,220,000N_

TRN X 6,200,000X_

28. TRN511 - HAWAII HIGHWAYS

126.00* [ 126.00*]

119.00*_

OPERATING TRN 19,238,820B [ 19,415,583B]

19,237,995B_

INVESTMENT CAPITAL TRN 3,400,000E [ 630,000E]

1,140,000E_

TRN 1,200,000N [ 1,120,000N]

2,160,000N_

TRN 1,000,000X X_

29. TRN531 - MAUI HIGHWAYS

79.50* [ 79.50*]

57.50*_

OPERATING TRN 14,931,134B [ 15,563,174B]

14,903,000B_

INVESTMENT CAPITAL TRN 12,745,000E [ 210,000E]

18,515,000E_

TRN 34,340,000N [ 840,000N]

70,040,000N_

TRN 1,500,000X X_

30. TRN541 - MOLOKAI HIGHWAYS

12.00* 12.00*_

OPERATING TRN 1,007,378B 3,621,281B_

INVESTMENT CAPITAL TRN 365,000E E_

TRN 560,000N N_

31. TRN551 - LANAI HIGHWAYS

4.00* 4.00*_

OPERATING TRN 3,497,446B 295,413B_

32. TRN561 - KAUAI HIGHWAYS

51.00* [ 51.00*]

49.00*_

OPERATING TRN 11,214,239B [ 10,840,562B]

10,760,894B_

INVESTMENT CAPITAL TRN 940,000E [ 2,020,000E]

2,425,000E_

TRN 2,160,000N 2,060,000N_

33. TRN595 - HIGHWAYS ADMINISTRATION

80.00* [ 80.00*]

76.00*_

OPERATING TRN 66,860,341B [ 69,247,855B]

69,066,251B_

TRN 8,908,865N 8,908,865N_

INVESTMENT CAPITAL TRN 8,500,000B 8,500,000B_

TRN 3,314,000E [ 3,024,000E]

9,024,000E_

TRN 9,961,000N [ 10,001,000N]

34,001,000N_

34. TRN597 - HIGHWAY SAFETY

36.00* [ 36.00*]

27.00*_

OPERATING TRN 5,922,255B [ 5,944,631B]

5,530,091B_

3.00* [ 3.00*]

9.00*_

TRN 3,577,276N [ 3,077,276N]

3,081,088N_

35. TRN995 - GENERAL ADMINISTRATION

99.00* [ 99.00*]

88.00*_

OPERATING TRN 12,551,040B [ 13,319,721B]

12,954,873B_

TRN 2,138,000N 2,200,000N_

TRN 112,500R 112,500R_

 

D. ENVIRONMENTAL PROTECTION

1. HTH840 - ENVIRONMENTAL MANAGEMENT

55.00* [ 55.00*]

54.00*_

OPERATING HTH 3,111,909A [ 3,111,909A]

3,088,459A_

50.20* 50.20*_

HTH 8,343,064B [ 8,343,064B]

30,369,314B_

46.40* 46.40*_

HTH 6,082,129N 6,082,129N_

52.40* 52.40*_

HTH 97,195,676W 97,195,676W_

INVESTMENT CAPITAL HTH 3,697,000C 3,697,000C_

HTH 18,482,000N 18,482,000N_

2. AGR846 - PESTICIDES

16.00* 16.00*_

OPERATING AGR 732,008A 732,008A_

AGR 380,392N 380,392N_

4.00* 4.00*_

AGR 715,063W 715,063W_

3. LNR401 - AQUATIC RESOURCES

27.00* 27.00*_

OPERATING LNR 2,241,259A [ 2,239,778A]

2,233,284A_

1.00* 1.00*_

LNR 1,196,081N [ 1,205,132N]

1,185,651N_

4. LNR402 - FORESTS AND WILDLIFE RESOURCES

56.00* [ 56.00*]

50.00*_

OPERATING LNR 3,079,295A [ 3,079,295A]

7,949,076A_

LNR 1,017,735B [ 1,017,735B]

992,079B_

7.00* 7.00*_

LNR 5,119,532N [ 5,119,532N]

5,032,124N_

5. LNR404 - WATER RESOURCES

21.00* [ 21.00*]

19.00*_

OPERATING LNR 1,620,977A [ 1,620,977A]

1,505,105A_

3.00* 3.00*_

LNR 342,766B 342,766B_

6. LNR405 - CONSERVATION AND RESOURCES ENFORCEMENT

97.50* [ 97.50*]

85.50*_

OPERATING LNR 4,856,925A [ 4,856,925A]

4,543,025A_

18.00* [ 18.00*]

17.00*_

LNR 1,320,442B [ 1,320,442B]

1,299,346B_

2.50* [ 2.50*]

1.50*_

LNR 646,473N [ 646,473N]

592,245N_

1.00* [ 1.00*]

*_

LNR 17,729W [ 17,729W]

W

7. LNR407 - NATURAL AREA RESERVES AND MANAGEMENT

27.00* [ 27.00*]

21.00*_

OPERATING LNR 1,228,511A [ 1,228,511A]

1,071,203A_

LNR 3,300,000B 3,300,000B_

8. HTH850 - POLICY DEVELOPMENT, COORDINATION, AND ANALYSIS FOR NATURAL PHYSICAL ENVIRONMENT

5.00* 5.00*_

OPERATING HTH 283,122A 283,122A_

9. LNR906 - LNR - NATURAL AND PHYSICAL ENVIRONMENT

34.00* [ 34.00*]

31.00*_

OPERATING LNR 1,855,957A [ 1,855,957A]

1,702,982A_

4.00* [ 4.00*]

3.00*_

LNR 471,750B [ 511,823B]

464,143B_

INVESTMENT CAPITAL LNR 1,750,000C [ 1,750,000C]

4,250,000C_

10. HTH849 - ENVIRONMENTAL HEALTH ADMINISTRATION

15.50* 15.50*_

OPERATING HTH 768,653A [ 768,653A]

782,903A_

17.50* 17.50*_

HTH 1,598,129N [ 1,598,129N]

3,098,129N_

10.00* 10.00*_

HTH 2,941,054W 2,941,054W_

 

E. HEALTH

1. HTH101 - TUBERCULOSIS CONTROL

33.00* 33.00*_

OPERATING HTH 2,285,494A [ 2,285,494A]

2,494,360A_

2.00* 2.00*_

HTH 1,318,876N 1,318,876N_

2. HTH111 - HANSEN'S DISEASE SERVICES

69.00* [ 69.00*]

68.00*_

OPERATING HTH 4,448,744A 4,448,744A_

3.00* 3.00*_

HTH 695,669N 695,669N_

3. HTH121 - STD/AIDS PREVENTION SERVICES

15.00* 15.00*_

OPERATING HTH 5,463,945A 5,463,945A_

4.50* 4.50*_

HTH 4,672,303N 4,672,303N_

4. HTH131 - DISEASE OUTBREAK CONTROL

19.00* [ 19.00*]

20.00*_

OPERATING HTH 1,370,236A [ 1,370,236A]

1,446,616A_

22.00* 22.00*_

HTH 12,588,085N [ 12,588,085N]

12,505,165N_

5. HTH141 - DENTAL DISEASES

25.60* [ 25.60*]

23.60*_

OPERATING HTH 1,610,135A [ 1,610,135A]

1,555,347A_

6. HTH730 - EMERGENCY MEDICAL SERVICES AND INJURY PREVENTION SYSTEM

13.00* 13.00*_

OPERATING HTH 38,027,956A 38,027,956A_

3.00* 3.00*_

HTH 1,356,757N [ 1,356,757N]

3,494,122N_

7. HTH501 - DEVELOPMENTAL DISABILITIES

243.75* [ 243.75*]

238.75*_

OPERATING HTH 38,479,541A [ 38,338,173A]

40,176,740A_

3.00* 3.00*_

HTH 1,000,000B 1,000,000B_

8. HTH530 - CHILDREN WITH SPECIAL HEALTH NEEDS SERVICES

121.75* [ 121.75*]

120.75*_

OPERATING HTH 9,742,839A [ 9,718,339A]

9,682,748A_

3.00* 3.00*_

HTH 1,273,228B [ 1,253,539B]

1,109,282B_

40.00* 40.00*_

HTH 4,834,427N 4,222,327N_

9. HTH165 - WOMEN, INFANTS AND CHILDREN (WIC) SERVICES

116.50* 116.50*_

OPERATING HTH 33,677,385N [ 33,677,385N]

29,660,385N_

10. HTH550 - MATERNAL AND CHILD HEALTH SERVICES

18.00* 18.00*_

OPERATING HTH 19,353,269A [ 19,441,625A]

17,349,107A_

HTH 300,000B 300,000B_

22.50* 22.50*_

HTH 5,676,089N [ 5,674,872N]

5,914,420N_

1.00* 1.00*_

HTH 750,000U 750,000U_

11. HTH180 - CHRONIC DISEASE MANAGEMENT AND CONTROL

20.80* [ 20.80*]

19.80*_

OPERATING HTH 1,117,554A [ 1,117,554A]

1,057,442A_

HTH 18,000B 18,000B_

HTH 3,362,821N 3,362,821N_

12. HTH570 - COMMUNITY HEALTH NURSING

442.00* [ 442.00*]

440.00*_

OPERATING HTH 14,401,062A 14,401,062A_

HTH 90,720B 90,720B_

13. HTH595 - HEALTH RESOURCES ADMINISTRATION

32.00* [ 32.00*]

25.00*_

OPERATING HTH 3,653,656A [ 3,653,656A]

3,267,971A_

2.00* 2.00*_

HTH 52,842,603B [ 52,842,603B]

52,998,860B_

6.50* 6.50*_

HTH 817,504N 817,362N_

INVESTMENT CAPITAL HTH 750,000C [ C]

720,000C_

14. HTH210 - HAWAII HEALTH SYSTEMS CORPORATION

OPERATING HTH 31,220,000A [ A]

27,848,469A_

2,836.25* 2,836.25*_

HTH 260,637,937B [ 260,637,937B]

325,637,937B_

INVESTMENT CAPITAL HTH [ 20,171,000C ][ C]

14,171,000C 10,199,000C_

15. HTH420 - ADULT MENTAL HEALTH - OUTPATIENT

226.00* [ 226.00*]

190.50*_

OPERATING HTH 49,591,759A [ 49,958,363A]

59,187,204A_

HTH 2,507,430B [ 2,507,430B]

3,507,430B_

HTH 1,620,229N [ 1,620,229N]

1,643,030N_

16. HTH430 - ADULT MENTAL HEALTH - INPATIENT

561.50* [ 561.50*]

627.50*_

OPERATING HTH 43,392,741A [ 42,635,879A]

46,672,781A_

17. HTH440 - ALCOHOL AND DRUG ABUSE

22.00* 22.00*_

OPERATING HTH 9,192,364A 8,892,364A_

HTH 150,000B 150,000B_

6.00* 6.00*_

HTH 10,859,867N 10,859,867N_

18. HTH460 - CHILD AND ADOLESCENT MENTAL HEALTH

171.00* [ 171.00*]

170.00*_

OPERATING HTH 62,987,235A [ 63,011,735A]

55,746,743A_

HTH 7,488,706B 7,488,706B_

HTH 693,203N [ 693,203N]

731,138N_

HTH 2,250,000U 2,250,000U_

19. HTH495 - BEHAVIORAL HEALTH SERVICES ADMINISTRATION

65.00* 65.00*_

OPERATING HTH 7,435,392A 7,509,802A_

HTH 443,502N [ 443,502N]

1,504,499N_

20. HTH610 - ENVIRONMENTAL HEALTH SERVICES

139.00* 139.00*_

OPERATING HTH 6,485,374A 6,485,374A_

7.00* [ 7.00*]

8.00*_

HTH 707,693B [ 707,693B]

763,463B_

7.00* 7.00*_

HTH 515,230N [ 515,230N]

474,682N_

2.00* 2.00*_

HTH 74,974U 74,974U_

21. HTH710 - STATE LABORATORY SERVICES

86.00* 86.00*_

OPERATING HTH 5,148,178A 5,148,178A_

22. HTH720 - MEDICAL FACILITIES - STDS, INSPECTION, AND LICENSING

14.40* [ 14.40*]

19.40*_

OPERATING HTH 997,193A [ 997,193A]

1,205,664A_

HTH B 356,000B_

20.70* 20.70*_

HTH 1,559,994N 1,559,994N_

23. HTH906 - COMPREHENSIVE HEALTH PLANNING

8.00* 8.00*_

OPERATING HTH 477,463A 477,463A_

HTH 29,000B [ 29,000B]

39,000B_

24. HTH760 - HEALTH STATUS MONITORING

28.00* [ 28.00*]

26.00*_

OPERATING HTH 1,484,388A [ 1,484,388A]

1,394,141A_

HTH 250,000B 250,000B_

2.00* 2.00*_

HTH 397,214N 397,214N_

25. HTH905 - POLICY DEVELOPMENT AND ADVOCACY FOR DEVELOPMENTAL DISABILITIES

1.50* 1.50*_

OPERATING HTH 95,002A 95,002A_

6.50* 6.50*_

HTH 433,728N [ 433,728N]

450,000N_

26. HTH907 - GENERAL ADMINISTRATION

115.50* [ 115.50*]

116.50*_

OPERATING HTH 7,106,304A [ 7,106,304A]

7,064,556A_

HTH 321,060N [ 321,060N]

1,304,909N_

 

F. SOCIAL SERVICES

1. HMS301 - CHILD WELFARE SERVICES

264.44* 264.44*_

OPERATING HMS 20,336,742A 20,336,742A_

HMS 450,000B 450,000B_

187.06* 187.06*_

HMS 26,110,567N 26,110,567N_

2. HMS302 - CHILD CARE SERVICES

25.00* [ 25.00*]

22.00*_

OPERATING HMS 1,139,110A [ 1,139,110A]

983,110A_

1.00* 1.00*_

HMS 5,606,896N [ 5,616,977N]

5,547,665N_

3. HMS303 - CHILD PLACEMENT BOARD AND RELATED CLIENT PAYMENTS

OPERATING HMS 30,579,126A [ 33,182,056A]

36,827,090A_

HMS 14,681,586N 15,884,108N_

4. HMS305 - CHILD CARE PAYMENTS

OPERATING HMS 22,411,811A 22,411,811A_

HMS 39,531,967N 39,531,967N_

5. HMS501 - YOUTH SERVICES ADMINISTRATION

22.00* [ 22.00*]

21.00*_

OPERATING HMS 1,169,532A [ 1,169,532A]

1,123,796A_

HMS 4,475,940N 4,475,940N_

INVESTMENT CAPITAL HMS 650,000C C_

6. HMS502 - YOUTH SERVICES PROGRAM

OPERATING HMS 3,542,811A 3,527,311A_

HMS 1,309,342N 1,309,342N_

7. HMS503 - YOUTH RESIDENTIAL PROGRAMS

88.50* [ 88.50*]

85.50*_

OPERATING HMS 5,472,979A [ 5,472,979A]

5,388,847A_

HMS 1,463,704N 1,463,704N_

.50* .50*_

HMS 15,940U 15,940U_

8. DEF112 - SERVICES TO VETERANS

24.00* [ 24.00*]

23.00*_

OPERATING DEF 1,154,201A [ 1,154,201A]

1,139,886A_

INVESTMENT CAPITAL DEF 150,000C C_

9. HMS601 - ADULT AND COMMUNITY CARE SERVICES BRANCH

99.58* [ 99.58*]

98.58*_

OPERATING HMS 8,144,765A [ 8,144,765A]

8,867,471A_

17.92* [ 17.92*]

16.92*_

HMS 5,265,240N [ 5,265,240N]

5,220,096N_

HMS 10,000R 10,000R_

HMS 280,106U 280,106U_

INVESTMENT CAPITAL HMS 500,000C C_

10. HMS201 - TEMPORARY ASSISTANCE TO NEEDY FAMILIES

OPERATING HMS 17,699,544A 17,003,411A_

HMS 55,842,104N 50,220,369N_

11. HMS202 - PAYMENTS TO ASSIST THE AGED, BLIND, AND DISABLED

OPERATING HMS 6,644,528A 6,644,528A_

12. HMS204 - GENERAL ASSISTANCE PAYMENTS

OPERATING HMS 21,911,632A 21,711,632A_

13. HMS206 - FEDERAL ASSISTANCE PAYMENTS

OPERATING HMS 1,809,458N [ 1,809,458N]

2,035,806N_

14. HMS203 - TEMPORARY ASSISTANCE TO OTHER NEEDY FAMILIES

OPERATING HMS 25,510,633A 25,306,766A_

15. HMS220 - RENTAL HOUSING SERVICES

OPERATING HMS 1,007,337A 1,007,337A_

198.00* 183.00*_

HMS 42,926,350N 42,328,654N_

23.00* 19.00*_

HMS 3,800,686W 3,675,346W_

INVESTMENT CAPITAL HMS C 4,000,000C_

16. BED220 - RENTAL HOUSING SERVICES

OPERATING BED [ 1,007,337A ] [ 1,007,337A]

A A_

[ 198.00* ] [ 198.00*]

* *_

BED [ 42,926,350N ] [ 42,926,350N]

N N_

[ 23.00* ] [ 23.00*]

* *_

BED [ 3,800,686W ] [ 3,800,686W]

W W_

17. HMS807 - TEACHER HOUSING

OPERATING HMS 358,567W 358,567W_

18. BED807 - TEACHER HOUSING

OPERATING BED [ 358,567W ] [ 358,567W]

W W_

19. HMS229 - HCDCH ADMINISTRATION

29.00* 28.00*_

OPERATING HMS 10,409,223N 10,363,443N_

20.00* 18.00*_

HMS 2,848,629W 2,800,881W_

INVESTMENT CAPITAL HMS C 660,000C_

20. BED229 - HCDCH ADMINISTRATION

[ 29.00* ] [ 29.00*]

* *_

OPERATING BED [ 10,409,223N ] [ 10,409,223N]

N N_

[ 20.00* ] [ 20.00*]

* *_

BED [ 2,848,629W ] [ 2,848,629W]

W W_

21. HMS225 - PRIVATE HOUSING DEVELOPMENT AND OWNERSHIP

11.00* 6.00*_

OPERATING HMS 1,528,333N 1,195,357N_

11.00* 7.00*_

HMS 2,044,603W 1,721,071W_

22. BED225 - PRIVATE HOUSING DEVELOPMENT AND OWNERSHIP

[ 11.00* ] [ 11.00*]

* *_

OPERATING BED [ 1,528,333N ] [ 1,528,333N]

N N_

[ 11.00* ] [ 11.00*]

* *_

BED [ 2,044,603W ] [ 2,044,603W]

W W_

23. HMS223 - BROADENED HOMESITE OWNERSHIP

OPERATING HMS 237,012W 205,812W_

24. BED223 - BROADENED HOMESITE OWNERSHIP

OPERATING BED [ 237,012W ] [ 237,012W]

W W_

25. HMS227 - HOUSING FINANCE

OPERATING HMS 3,000,000N 3,000,000N_

11.00* 7.00*_

HMS 1,405,532W 1,232,288W_

26. BED227 - HOUSING FINANCE

OPERATING BED [ 3,000,000N ] [ 3,000,000N]

N N_

[ 11.00* ] [ 11.00*]

* *_

BED [ 1,405,532W ] [ 1,405,532W]

W W_

27. HMS222 - RENTAL ASSISTANCE SERVICES

5.25* 5.25*_

OPERATING HMS 1,220,647A 1,594,041A_

11.75* 9.75*_

HMS 25,490,030N 25,393,022N_

28. BED222 - RENTAL ASSISTANCE SERVICES

[ 5.25* ] [ 5.25*]

* *_

OPERATING BED [ 1,220,647A ] [ 1,594,041A]

A A_

[ 11.75* ] [ 11.75*]

* *_

BED [ 25,490,030N ] [ 25,490,030N]

N N_

29. HMS224 - HOMELESS SERVICES

4.00* 4.00*_

OPERATING HMS 4,914,387A 4,893,291A_

HMS 1,369,108N 1,369,108N_

30. BED224 - HOMELESS SERVICES

[ 4.00* ] [ 4.00*]

* *_

OPERATING BED [ 4,914,387A ] [ 4,914,387A]

A A_

BED [ 1,369,108N ] [ 1,369,108N]

N N_

31. HMS231 - RENTAL HOUSING TRUST FUND

OPERATING HMS 14,008,563T 14,008,563T_

32. BED231 - RENTAL HOUSING TRUST FUND

OPERATING BED [ 14,008,563T ] [ 14,008,563T]

T T_

33. HMS230 - HEALTH CARE PAYMENTS

OPERATING HMS 203,462,452A [ 213,726,573A]

213,976,573A_

HMS 301,551,381N [ 316,924,852N]

319,774,852N_

HMS 10,341,215U 10,341,215U_

34. HMS603 - HOME AND COMMUNITY BASED CARE SERVICES

OPERATING HMS 13,027,039A [ 13,377,039A]

13,877,039A_

HMS 51,505,685N [ 52,004,581N]

52,721,126N_

HMS 21,798,316U 23,793,802U_

35. HMS245 - QUEST HEALTH CARE PAYMENTS

OPERATING HMS [ 132,878,792A ] [ 133,088,489A]

129,357,652A 144,468,658A_

HMS 176,414,907N [ 187,667,721N]

220,110,979N_

36. HMS236 - ELIGIBILITY DETERMINATION AND EMPLOYMENT RELATED SERVICES

332.89* [ 332.89*]

323.34*_

OPERATING HMS 12,647,582A [ 12,647,582A]

12,294,187A_

258.11* [ 258.11*]

250.66*_

HMS 14,868,909N [ 14,991,194N]

14,622,343N_

37. HMS238 - DISABILITY DETERMINATION

45.00* [ 45.00*]

37.00*_

OPERATING HMS 5,048,313N [ 5,048,313N]

4,789,497N_

38. ATG500 - CHILD SUPPORT ENFORCEMENT SERVICES

52.02* 52.02*_

OPERATING ATG 3,105,599A 1,905,599A_

128.04* 128.04*_

ATG 16,406,623N 14,106,623N_

13.94* 13.94*_

ATG 2,703,228T 2,703,228T_

39. HMS237 - EMPLOYMENT AND TRAINING

OPERATING HMS 491,214A 491,214A_

HMS 1,197,541N 1,197,541N_

40. HHL602 - PLANNING, DEVELOPMENT, MANAGEMENT, AND GENERAL SUPPORT FOR HAWAIIAN HOMESTEADS

29.00* 29.00*_

OPERATING HHL 1,297,007A 1,277,007A_

89.00* 89.00*_

HHL 7,115,343B 7,172,586B_

INVESTMENT CAPITAL HHL 600,000C C_

41. HMS605 - COMMUNITY-BASED RESIDENTIAL SUPPORT

OPERATING HMS 12,711,261A 12,711,261A_

42. HTH904 - EXECUTIVE OFFICE ON AGING

3.55* 3.55*_

OPERATING HTH 6,060,687A [ 5,830,687A]

6,060,687A_

7.45* 7.45*_

HTH 7,119,320N 7,119,320N_

43. HTH520 - PROGRAM DEVELOPMENT, COORDINATION OF SERVICES, AND ACCESS FOR PERSONS WITH DISABILITIES

5.00* 5.00*_

OPERATING HTH 820,018A [ 820,018A]

1,030,618A_

HTH 10,000B 10,000B_

44. HMS902 - GENERAL SUPPORT FOR HEALTH CARE PAYMENTS

107.74* [ 107.74*]

99.24*_

OPERATING HMS 9,044,794A [ 9,044,794A]

8,622,437A_

110.26* [ 110.26*]

100.76*_

HMS 16,756,953N [ 16,756,953N]

16,217,487N_

45. HMS903 - GENERAL SUPPORT FOR BENEFITS, EMPLOYMENT, AND SUPPORT SERVICES

57.07* 57.07*_

OPERATING HMS 10,208,142A [ 10,208,142A]

10,205,953A_

47.93* 47.93*_

HMS 26,966,839N [ 26,966,839N]

26,968,454N_

46. HMS904 - GENERAL ADMINISTRATION

172.84* [ 172.84*]

171.84*_

OPERATING HMS 8,050,754A [ 8,050,754A]

7,868,512A_

15.16* 15.16*_

HMS 1,388,339N 1,388,339N_

47. HMS901 - GENERAL SUPPORT FOR SOCIAL SERVICES

27.56* 27.56*_

OPERATING HMS 1,591,073A 1,591,073A_

19.44* 19.44*_

HMS 1,512,407N 1,512,407N_

INVESTMENT CAPITAL HMS C 500,000C_

 

G. FORMAL EDUCATION

1. EDN100 - SCHOOL-BASED BUDGETING

11,683.50* [ 11,663.50*]

11,622.00*_

OPERATING EDN 967,163,889A [1,018,878,690A]

988,113,673A_

EDN 5,372,924B 5,372,924B_

EDN 115,318,574N [ 126,959,759N]

142,082,425N_

EDN 5,950,000T 5,950,000T_

EDN 1,600,000U [ 1,800,000U]

2,000,000U_

EDN 2,000,000W 2,000,000W_

INVESTMENT CAPITAL AGS 72,703,000B [ 46,050,000B]

191,483,000B_

EDN 250,000B 250,000B_

2. EDN150 - COMPREHENSIVE SCHOOL SUPPORT SERVICES

4,963.50* [ 4,963.50*]

4,966.50*_

OPERATING EDN 284,037,140A [ 284,096,823A]

284,100,621A_

2.00* 2.00*_

EDN 33,903,370N [ 36,125,986N]

39,474,133N_

3. EDN200 - INSTRUCTIONAL SUPPORT

220.50* [ 220.50*]

222.50*_

OPERATING EDN 20,314,325A [ 20,314,023A]

20,660,521A_

EDN 1,600,000B 1,600,000B_

EDN 1,413,378N [ 1,363,378N]

1,613,378N_

EDN 800,000U 800,000U_

4. EDN300 - STATE AND DISTRICT ADMINISTRATION

404.00* 404.00*_

OPERATING EDN 31,226,941A [ 31,226,036A]

31,093,813A_

EDN 65,000N 65,000N_

5. EDN400 - SCHOOL SUPPORT

1,627.60* 1,630.60*_

OPERATING EDN 101,481,391A [ 100,185,677A]

103,967,570A_

728.50* 728.50*_

EDN 33,101,168B 27,321,290B_

3.00* 3.00*_

EDN 43,247,751N 40,669,737N_

EDN 2,000,000W 2,000,000W_

6. EDN500 - SCHOOL COMMUNITY SERVICE

35.50* 35.50*_

OPERATING EDN 8,216,835A [ 8,216,533A]

11,680,951A_

EDN 1,939,006B 1,939,006B_

EDN 2,916,650N 3,208,314N_

EDN 6,000,000U [ 6,000,000U]

7,000,000U_

EDN 530,000W 530,000W_

7. EDN600 - CHARTER SCHOOLS

OPERATING EDN A 25,886,070A_

8. AGS807 - PHYSICAL PLANT OPERATIONS AND MAINTENANCE - AGS

241.00* [ 241.00*]

238.00*_

OPERATING AGS 22,841,005A [ 22,841,005A]

23,556,517A_

INVESTMENT CAPITAL AGS 35,000,000C [ 7,000,000C]

C_

9. EDN407 - PUBLIC LIBRARIES

534.55* 553.55*_

OPERATING EDN 24,530,903A [ 25,107,253A]

26,127,996A_

EDN 3,125,000B 3,125,000B_

EDN 865,244N [ 865,244N]

1,365,244N_

INVESTMENT CAPITAL AGS 1,550,000C [ C]

5,500,000C_

10. DEF114 - HAWAII NATIONAL GUARD YOUTH CHALLENGE ACADEMY

OPERATING DEF 1,043,835A [ 1,043,835A]

1,107,825A_

DEF 1,680,000N [ 1,680,000N]

1,661,783N_

11. UOH100 - UNIVERSITY OF HAWAII, MANOA

3,435.34* [ 3,435.34*]

3,437.84*_

OPERATING UOH 186,086,473A [ 186,086,473A]

188,610,108A_

79.75* 79.75*_

UOH 71,044,995B 71,044,995B_

78.06* 78.06*_

UOH 5,762,014N 5,762,014N_

302.75* 302.75*_

UOH 108,655,933W [ 107,062,781W]

122,062,781W_

INVESTMENT CAPITAL UOH 115,000C [ C]

120,000C_

UOH 10,000,000N N_

12. UOH210 - UNIVERSITY OF HAWAII, HILO

361.25* 361.25*_

OPERATING UOH 20,449,410A 20,449,410A_

14.00* 14.00*_

UOH 7,940,557B [ 7,940,557B]

8,940,557B_

UOH 394,543N 394,543N_

11.50* 11.50*_

UOH 4,084,938W 4,084,938W_

INVESTMENT CAPITAL UOH 3,260,000C [ C]

10,950,000C_

UOH N 18,405,000N_

13. UOH220 - SMALL BUSINESS DEVELOPMENT

OPERATING UOH 638,224A 638,224A_

14. UOH700 - UNIVERSITY OF HAWAII, WEST OAHU

47.50* 47.50*_

OPERATING UOH 2,554,228A 2,554,228A_

UOH 1,985,000B 1,985,000B_

UOH 7,000N 7,000N_

UOH 125,000W 125,000W_

15. UOH800 - UNIVERSITY OF HAWAII, COMMUNITY COLLEGES

1,532.25* [ 1,532.25*]

1,533.25*_

OPERATING UOH 75,920,657A [ 75,860,657A]

76,228,754A_

77.50* 77.50*_

UOH 40,783,445B 42,623,100B_

15.60* 15.60*_

UOH 3,540,927N 3,540,927N_

4.50* 4.50*_

UOH 4,848,882W 4,848,882W_

INVESTMENT CAPITAL UOH 300,000C [ C]

5,772,000C_

UOH R 100,000R_

16. UOH900 - UNIVERSITY OF HAWAII, SYSTEM WIDE SUPPORT

323.00* [ 323.00*]

366.50*_

OPERATING UOH 171,985,620A [ 192,345,037A]

187,596,790A_

4.00* 4.00*_

UOH 6,368,128B [ 6,368,128B]

8,368,128B_

4.00* 4.00*_

UOH 457,667N [ 457,667N]

657,667N_

5.00* 5.00*_

UOH 13,157,802W 13,157,802W_

INVESTMENT CAPITAL UOH 19,129,000C [ 6,910,000C]

34,378,000C_

H. CULTURE AND RECREATION

1. UOH881 - UNIVERSITY OF HAWAII, AQUARIA

13.00* 13.00*_

OPERATING UOH 542,225A 542,225A_

7.00* 7.00*_

UOH 1,718,689B 1,718,689B_

2. AGS881 - PERFORMING AND VISUAL ARTS EVENTS

10.00* 10.00*_

OPERATING AGS 1,863,595A [ 1,733,595A]

2,058,595A_

9.00* [ 9.00*]

12.00*_

AGS 4,156,414B 4,156,414B_

1.00*_

AGS 750,336N 750,336N_

3. AGS818 - ETHNIC GROUP PRESENTATIONS

OPERATING AGS 36,000A 36,000A

_

4. LNR802 - HISTORIC PRESERVATION

13.00* 13.00*_

OPERATING LNR 804,496A 804,496A_

LNR 126,679B 126,679B_

LNR 466,101N [ 466,101N]

472,101N_

5. LNR804 - FOREST RECREATION

36.00* [ 36.00*]

34.00*_

OPERATING LNR 1,383,307A [ 1,383,307A]

1,305,965A_

3.50* 3.50*_

LNR 422,401B [ 422,401B]

520,447B_

3.50* 3.50*_

LNR 526,193N 526,193N_

LNR 416,062W [ 416,062W]

569,062W_

6. LNR805 - RECREATIONAL FISHERIES

7.00* [ 7.00*]

6.00*_

OPERATING LNR 217,419A [ 218,900A]

188,800A_

LNR 68,000B 68,000B_

LNR 438,149N [ 444,344N]

431,013N_

7. LNR806 - PARKS ADMINISTRATION AND OPERATION

108.00* [ 108.00*]

90.00*_

OPERATING LNR 5,129,700A [ 5,129,700A]

4,682,538A_

LNR 584,164B 584,164B_

LNR 285,201N 285,201N_

INVESTMENT CAPITAL LNR 500,000C [ 500,000C]

15,100,000C_

8. LNR801 - OCEAN-BASED RECREATION

96.00* [ 96.00*]

82.00*_

OPERATING LNR 15,607,162B [ 15,608,563B]

15,087,118B_

LNR 700,000N 700,000N_

INVESTMENT CAPITAL LNR 125,000C [ C]

1,895,000C_

LNR 1,400,000D 650,000D_

LNR E 10,000,000E_

LNR 375,000N [ 375,000N]

775,000N_

9. AGS889 - SPECTATOR EVENTS AND SHOWS - ALOHA STADIUM

39.50* 39.50*_

OPERATING AGS 6,706,527B 6,661,873B_

INVESTMENT CAPITAL AGS 650,000B B_

AGS 300,000C [ 300,000C]

1,075,000C_

10. LNR807 - PARK INTERPRETATION

18.00* [ 18.00*]

15.00*_

OPERATING LNR 2,481,782B [ 2,481,782B]

2,397,566B_

I. PUBLIC SAFETY

1. PSD402 - HALAWA CORRECTIONAL FACILITY

407.00* [ 407.00*]

403.00*_

OPERATING PSD 18,384,712A [ 18,082,519A]

17,980,432A_

PSD 52,419W 52,419W_

INVESTMENT CAPITAL AGS C 5,960,000C_

2. PSD403 - KULANI CORRECTIONAL FACILITY

79.00* [ 79.00*]

77.00*_

OPERATING PSD 3,890,566A [ 3,890,566A]

4,032,080A_

INVESTMENT CAPITAL AGS 5,300,000C C_

3. PSD404 - WAIAWA CORRECTIONAL FACILITY

108.00* [ 108.00*]

107.00*_

OPERATING PSD 4,379,493A [ 4,379,493A]

4,358,667A_

PSD 15,000W 15,000W_

INVESTMENT CAPITAL AGS C 925,000C_

4. PSD405 - HAWAII COMMUNITY CORRECTIONAL CENTER

162.00* [ 162.00*]

143.00*_

OPERATING PSD 5,834,337A [ 5,729,413A]

5,348,568A_

5. PSD406 - MAUI COMMUNITY CORRECTIONAL CENTER

188.00* [ 188.00*]

184.00*_

OPERATING PSD 6,780,609A [ 6,748,887A]

6,665,857A_

PSD 200,000S 200,000S_

6. PSD407 - OAHU COMMUNITY CORRECTIONAL CENTER

484.00* [ 484.00*]

483.00*_

OPERATING PSD 21,926,511A [ 21,653,878A]

21,638,473A_

PSD 30,000W 30,000W_

INVESTMENT CAPITAL AGS C 1,500,000C_

7. PSD408 - KAUAI COMMUNITY CORRECTIONAL CENTER

69.00* [ 69.00*]

68.00*_

OPERATING PSD 2,768,758A [ 2,768,758A]

2,751,317A_

INVESTMENT CAPITAL AGS C 475,000C_

8. PSD409 - WOMEN'S COMMUNITY CORRECTIONAL CENTER

137.00* [ 137.00*]

126.00*_

OPERATING PSD 5,381,406A [ 5,296,061A]

5,041,609A_

9. PSD410 - INTAKE SERVICE CENTERS

48.00* [ 48.00*]

50.00*_

OPERATING PSD 2,266,337A [ 2,266,337A]

2,181,504A_

10. PSD420 - CORRECTION PROGRAM SERVICES

196.50* [ 196.50*]

171.50*_

OPERATING PSD 16,639,067A [ 16,639,067A]

16,158,351A_

11. PSD421 - HEALTH CARE

160.93* [ 160.93*]

137.93*_

OPERATING PSD 13,326,043A [ 13,531,864A]

13,104,680A_

12. PSD501 - PROTECTIVE SERVICES

85.00* [ 85.00*]

79.00*_

OPERATING PSD 2,879,230A [ 2,879,230A]

2,812,012A_

7.00* 7.00*_

PSD 541,407N 541,407N_

13.00* [ 13.00*]

9.00*_

PSD 1,368,262U [ 1,368,262U]

1,321,142U_

13. PSD502 - NARCOTICS ENFORCEMENT

11.00* 11.00*_

OPERATING PSD 594,501A 594,501A_

5.00* 5.00*_

PSD 408,868W [ 378,968W]

385,856W_

14. PSD503 - SHERIFF

148.00* [ 148.00*]

153.00*_

OPERATING PSD 5,791,602A [ 5,662,450A]

5,893,301A_

63.00* 63.00*_

PSD 4,243,524U 4,243,524U_

15. PSD611 - ADULT PAROLE DETERMINATIONS

2.00* 2.00*_

OPERATING PSD 196,352A 196,352A_

16. PSD612 - ADULT PAROLE SUPERVISION AND COUNSELING

44.00* [ 44.00*]

51.00*_

OPERATING PSD 2,194,714A [ 2,191,214A]

3,034,751A_

17. PSD613 - CRIME VICTIM COMPENSATION COMMISSION

6.00* 6.00*_

OPERATING PSD 1,672,089B 1,672,089B_

PSD N 850,000N_

18. PSD900 - GENERAL ADMINISTRATION

143.10* [ 143.10*]

136.10*_

OPERATING PSD 40,455,031A [ 40,455,031A]

46,478,807A_

PSD 693,832B 693,832B_

PSD 75,065T 75,065T_

9.00* 9.00*_

PSD 7,578,537W 7,578,537W_

PSD 742,980X 742,980X_

INVESTMENT CAPITAL AGS C 1,000,000C_

19. ATG231 - STATE CRIMINAL JUSTICE INFORMATION AND IDENTIFICATION

30.00* 30.00*_

OPERATING ATG 1,576,076A [ 1,576,076A]

1,543,350A_

ATG 1,800,000N 1,800,000N_

12.00* 12.00*_

ATG 2,430,245W [ 2,430,245W]

2,381,155W_

20. LNR810 - PREVENTION OF NATURAL DISASTERS

2.35* [ 2.35*]

1.35*_

OPERATING LNR 128,870A [ 128,870A]

119,380A_

1.65* 1.65*_

LNR 166,021N [ 166,021N]

134,386N_

INVESTMENT CAPITAL LNR C 400,000C_

21. DEF110 - AMELIORATION OF PHYSICAL DISASTERS

120.80* [ 120.80*]

119.30*_

OPERATING DEF 7,127,151A [ 7,127,151A]

7,184,926A_

43.70* [ 43.70*]

47.20*_

DEF 7,891,420N [ 7,891,420N]

8,351,415N_

INVESTMENT CAPITAL AGS 1,167,000C [ 1,167,000C]

1,542,000C_

AGS 100,000N [ 100,000N]

1,225,000N_

DEF C 75,000C_

DEF N 75,000N_

J. INDIVIDUAL RIGHTS

1. CCA102 - CABLE TELEVISION

4.00* 4.00*_

OPERATING CCA 1,107,241B 1,107,241B_

2. CCA103 - CONSUMER ADVOCATE FOR COMMUNICATION, UTILITIES, AND TRANSPORTATION SERVICES

23.00* 23.00*_

OPERATING CCA 2,445,969B 2,445,969B_

3. CCA104 - FINANCIAL INSTITUTION SERVICES

29.00* 29.00*_

OPERATING CCA 2,132,488B 2,132,488B_

4. CCA105 - PROFESSIONAL, VOCATIONAL, AND PERSONAL SERVICES

57.00* 57.00*_

OPERATING CCA 4,101,752B 4,101,752B_

4.00* 4.00*_

CCA 1,476,265T [ 1,476,265T]

1,765,695T_

5. BUF901 - TRANSPORTATION, COMMUNICATIONS, AND UTILITIES

43.00* [ 43.00*]

39.00*_

OPERATING BUF 7,490,045B [ 7,170,476B]

6,968,888B_

6. CCA106 - INSURANCE REGULATORY SERVICES

76.00* 76.00*_

OPERATING CCA 10,140,295B [ 9,518,686B]

9,668,686B_

CCA 200,000T 200,000T_

7. CCA110 - OFFICE OF CONSUMER PROTECTION - UNFAIR AND DECEPTIVE PRACTICES

16.00* 16.00*_

OPERATING CCA 1,261,351B [ 1,261,351B]

1,348,447B_

CCA 50,681T 50,681T_

8. AGR812 - MEASUREMENT STANDARDS

17.00* [ 17.00*]

15.00*_

OPERATING AGR 677,088A [ 677,088A]

643,260A_

9. CCA111 - BUSINESS REGISTRATION

68.00* [ 68.00*]

71.00*_

OPERATING CCA 5,336,237B [ 5,332,421B]

5,329,409B_

10. CCA112 - REGULATED INDUSTRIES COMPLAINTS OFFICE

17.00* 17.00*_

OPERATING CCA 5,393,874B [ 5,434,860B]

5,197,764B_

11. CCA191 - GENERAL SUPPORT - PROTECTION OF THE CONSUMER

40.00* 40.00*_

OPERATING CCA 4,484,312B [ 4,458,751B]

4,909,270B_

12. LTG105 - ENFORCEMENT OF INFORMATION PRACTICES

5.00* 5.00*_

OPERATING LTG 347,703A 347,703A_

13. BUF151 - LEGAL ASSISTANCE IN CRIMINAL ACTIONS

83.00* [ 83.00*]

79.00*_

OPERATING BUF 8,105,793A [ 8,105,793A]

7,963,305A_

14. LNR111 - CONVEYANCES AND RECORDINGS

48.00* [ 48.00*]

*_

OPERATING LNR 1,802,298A [ 1,802,298A]

A_

5.00* [ 5.00*]

55.00*_

LNR 781,339B [ 531,339B]

3,176,713B_

15. LTG888 - COMMISSION ON THE STATUS OF WOMEN

1.00* 1.00*_

OPERATING LTG 94,623A 94,623A_

K. GOVERNMENT-WIDE SUPPORT

1. GOV100 - OFFICE OF THE GOVERNOR

34.00* 34.00*_

OPERATING GOV 3,069,976A [ 3,069,976A]

3,070,709A_

INVESTMENT CAPITAL GOV 1,000C 1,000C_

2. LTG100 - OFFICE OF THE LIEUTENANT GOVERNOR

3.00* 3.00*_

OPERATING LTG 586,546A [ 586,546A]

589,976A_

3. GOV102 - OTHER POLICY DEVELOPMENT AND COORDINATION

3.00* 3.00*_

OPERATING GOV 225,015A 225,015A_

4. BED144 - STATEWIDE PLANNING AND COORDINATION

20.00* [ 20.00*]

18.00*_

OPERATING BED 1,601,676A [ 1,601,676A]

1,566,676A_

BED 120,000B 120,000B_

4.00* 4.00*_

BED 1,024,298N [ 1,024,298N]

2,270,000N_

BED 1,000,000W 1,000,000W_

5. BED103 - STATEWIDE LAND USE MANAGEMENT

7.00* [ 7.00*]

6.00*_

OPERATING BED 426,921A [ 426,921A]

401,265A_

6. BED130 - ECONOMIC PLANNING AND RESEARCH

16.00* 16.00*_

OPERATING BED 922,104A 922,104A_

4.00* 4.00*_

BED 1,305,904B 1,305,904B_

7. BUF101 - PROGRAM PLANNING, ANALYSIS, AND BUDGETING

50.00* 50.00*_

OPERATING BUF [ 140,326,979A ] [ 153,602,960A]

136,147,705A 144,067,279A_

BUF [ 169,129,928U ] [ 186,443,480U]

163,733,225U 173,696,091U_

INVESTMENT CAPITAL AGS 2,000,000C 2,000,000C_

BUF 138,166,000C [ 113,800,000C]

259,733,000C_

8. LTG101 - CAMPAIGN SPENDING COMMISSION

4.00* [ 4.00*]

*_

OPERATING LTG 394,801T [ 4,423,489T]

T_

9. AGS871 - CAMPAIGN SPENDING COMMISSION

4.00* 4.00*_

OPERATING AGS 394,801T 4,423,489T_

10. LTG102 - OFFICE OF ELECTIONS

4.00* [ 4.00*]

*_

OPERATING LTG 2,483,224A [ 2,582,818A]

A_

11. AGS879 - OFFICE OF ELECTIONS

4.00* 2.00*_

OPERATING AGS 2,483,224A 2,512,018A_

12. TAX102 - INCOME ASSESSMENT AND AUDIT

103.00* 103.00*_

OPERATING TAX 4,600,626A 4,600,626A_

13. TAX103 - TAX COLLECTIONS ENFORCEMENT

83.50* 83.50*_

OPERATING TAX 2,955,978A 2,955,978A_

14. TAX105 - TAX SERVICES AND PROCESSING

88.50* 88.50*_

OPERATING TAX 4,881,057A 4,881,057A_

15. TAX107 - SUPPORTING SERVICES - REVENUE COLLECTION

57.00* 57.00*_

OPERATING TAX 5,896,489A [ 5,896,489A]

5,900,422A_

TAX 8,579,542B 1,494,252B_

16. AGS101 - ACCOUNTING SYSTEM DEVELOPMENT AND MAINTENANCE

7.00* 7.00*_

OPERATING AGS 698,111A 698,111A_

17. AGS102 - EXPENDITURE EXAMINATION

19.00* [ 19.00*]

16.00*_

OPERATING AGS 1,041,789A [ 1,041,789A]

961,065A_

18. AGS103 - RECORDING AND REPORTING

12.00* [ 12.00*]

11.00*_

OPERATING AGS 591,596A [ 591,596A]

561,584A_

19. AGS104 - INTERNAL POST AUDIT

13.00* [ 13.00*]

12.00*_

OPERATING AGS 1,348,466A [ 1,348,466A]

627,854A_

20. BUF115 - FINANCIAL ADMINISTRATION

16.00* [ 16.00*]

14.00*_

OPERATING BUF [ 208,001,199A ] [ 223,604,869A]

192,191,552A 206,261,708A_

4.00* 4.00*_

BUF 3,407,742T 3,259,868T_

1.00* [ 1.00*]

*_

BUF [ 144,643,293U ] [ 155,397,605U]

133,552,060U 143,799,387U_

21. ATG100 - LEGAL SERVICES

201.15* [ 201.15*]

198.15*_

OPERATING ATG 17,676,600A [ 17,676,600A]

17,655,150A_

15.00* 15.00*_

ATG 1,475,959B [ 1,442,959B]

1,226,564B_

12.00* 12.00*_

ATG 9,435,058N [ 9,435,058N]

9,436,633N_

ATG 3,918,000T 3,918,000T_

40.85* 40.85*_

ATG 6,879,698U [ 6,879,698U]

6,915,059U_

4.00* 4.00*_

ATG 3,016,392W 3,016,392W_

22. AGS131 - INFORMATION PROCESSING SERVICES

171.00* [ 171.00*]

156.00*_

OPERATING AGS 14,603,159A [ 14,603,159A]

14,092,043A_

33.00* 33.00*_

AGS 2,182,654U 2,182,654U_

23. HRD102 - WORK FORCE ATTRACTION, SELECTION, CLASSIFICATION, AND EFFICIENCY

106.00* [ 106.00*]

98.00*_

OPERATING HRD 12,765,024A [ 12,765,024A]

14,230,284A_

HRD 700,000B 700,000B_

HRD 4,886,281U 4,886,281U_

24. HRD191 - SUPPORTING SERVICES

9.00* [ 9.00*]

13.00*_

OPERATING HRD 1,109,733A [ 1,109,733A]

1,339,742A_

25. BUF141 - RETIREMENT

OPERATING BUF 137,882,906A [ 168,895,353A]

170,540,941A_

BUF 194,800,270U [ 238,594,245U]

240,919,270U_

67.00* [ 67.00*]

73.00*_

BUF 16,554,244X [ 10,453,380X]

18,021,340X_

26. BUF143 - HAWAII EMPLOYER - UNION TRUST FUND

23.00* [ 23.00*]

22.00*_

OPERATING BUF 3,439,250T [ 2,889,000T]

2,848,836T_

27. LNR101 - PUBLIC LANDS MANAGEMENT

56.00* [ 56.00*]

48.00*_

OPERATING LNR 5,876,441B [ 5,876,441B]

5,602,961B_

LNR 72,634N 72,634N_

INVESTMENT CAPITAL LNR [ 7,705,000B ]

1,905,000B _

LNR C 6,400,000C_

LNR R 200,000R_

LNR S 500,000S_

28. AGS203 - RISK MANAGEMENT

4.00* 4.00*_

OPERATING AGS 359,198A [ 359,198A]

416,295A_

AGS 10,450,000W 10,450,000W_

29. AGS211 - LAND SURVEY

18.00* [ 18.00*]

17.00*_

OPERATING AGS 837,561A [ 837,561A]

797,397A_

AGS 285,000U 285,000U_

30. AGS223 - OFFICE LEASING

5.00* [ 5.00*]

4.00*_

OPERATING AGS 11,834,547A [ 11,834,547A]

11,792,367A_

AGS 5,500,000U 5,500,000U_

31. AGS221 - CONSTRUCTION

18.00* [ 18.00*]

15.00*_

OPERATING AGS 1,145,462A [ 1,145,462A]

950,990A_

AGS 4,000,000W 4,000,000W_

INVESTMENT CAPITAL AGS 7,750,000C [ 7,750,000C]

8,550,000C_

AGS N 2,000,000N_

32. AGS231 - CUSTODIAL SERVICES

154.50* 154.50*_

OPERATING AGS 11,054,471A [ 11,054,471A]

11,259,471A_

AGS 58,744B 58,744B_

AGS 894,001U 894,001U_

33. AGS232 - GROUNDS MAINTENANCE

41.50* [ 41.50*]

40.50*_

OPERATING AGS 1,344,400A [ 1,344,400A]

1,322,140A_

34. AGS233 - BUILDING REPAIRS AND ALTERATIONS

30.00* [ 30.00*]

29.00*_

OPERATING AGS 2,561,079A [ 2,561,079A]

2,530,203A_

INVESTMENT CAPITAL AGS 1,000,000C 1,000,000C_

35. AGS240 - STATE PROCUREMENT

21.00* 21.00*_

OPERATING AGS 1,043,020A 1,043,020A_

AGS 50,000W [ 50,000W]

W_

36. AGS244 - SURPLUS PROPERTY MANAGEMENT

5.00* 5.00*_

OPERATING AGS 1,009,030W [ 1,009,030W]

1,709,030W_

37. AGS251 - MOTOR POOL

13.50* [ 13.50*]

12.50*_

OPERATING AGS 2,180,030W [ 2,180,030W]

2,178,996W_

38. AGS252 - PARKING CONTROL

26.50* 26.50*_

OPERATING AGS 2,981,124W 2,981,124W_

39. AGS111 - RECORDS MANAGEMENT

19.00* [ 19.00*]

16.00*_

OPERATING AGS 775,334A [ 775,334A]

678,734A_

40. AGS901 - GENERAL ADMINISTRATIVE SERVICES

44.00* 44.00*_

OPERATING AGS 2,180,688A 2,180,688A_

1.00* 1.00*_

AGS 54,188U 54,188U_

41. SUB401 - COUNTY OF MAUI

INVESTMENT CAPITAL COM C 350,000C_

42. SUB501 - COUNTY OF KAUAI

INVESTMENT CAPITAL COK 430,000C [ C]

960,000C_

COK 430,000S S"_

SECTION 4. Part III, Act 200, Session Laws of Hawaii 2003, is amended:

(1) By amending section 5 to read as follows:

"SECTION 5. Provided that for tourism (BED 113), the Hawaii tourism authority shall submit a detailed report for expenditures comparing budget appropriations to actual expenditures for fiscal years [2002-2003] 2003-2004 and [2003-2004] 2004-2005 (four months actual, eight months forecasted) with accompanying explanations for variances for Hawaii convention center operations; and provided further that this report shall be submitted to the legislature no later than twenty days prior to the convening of the [2004] 2005 regular session."

(2) By adding a new section to read as follows:

"SECTION 5.1. Provided that of the trust fund appropriation for plant, pest, and, disease control (AGR 122), the department of agriculture shall submit a report including, but not limited, to the following:

(1) A detailed listing by position of overtime paid from the contribution of overtime plant quarantine trust fund; and

(2) A description of actions taken by department to reduce reimbursable overtime costs;

provided further that the report shall be submitted for the previous fiscal year and the current fiscal year, five months actual, no later than twenty days prior to the convening of the 2005 regular session."

(3) By adding a new section to read as follows:

"SECTION 5.2. Provided that of the special fund appropriation for rabies quarantine (AGR 131), the department of agriculture shall submit a report including, but not limited to, the following:

(1) The source and amount of all revenue;

(2) A detailed account of all expenditures; and

(3) The number of personnel including position titles at each facility (animal quarantine station and airport animal quarantine holding facility);

provided further that the report shall be submitted under the above established guidelines to the legislature for the previous two fiscal years and the current fiscal year, five months actual, no later than twenty days prior to the convening of the 2005 regular session."

(4) By amending section 8 to read as follows:

"SECTION 8. Provided that of the revolving fund appropriation for the agribusiness development [corporation] and research (AGR 161), the sum of $50,000 for fiscal year 2003-2004 and the same sum for fiscal year 2004-2005 shall be expended from the Hawaii agricultural development revolving fund for the operation and maintenance of the east Kauai irrigation system."

(5) By adding a new section to read as follows:

"SECTION 18.1. Provided that of the general fund appropriations for forests and wildlife resources (LNR 402), the sum of $5,000,000 for fiscal year 2004-2005 shall be expended by the department of land and natural resources for a pilot statewide invasive species prevention, control, research, and outreach partnership program; provided further that portions of this appropriation may be transferred to other state departments to be expended for activities related to the statewide invasive species prevention, control, research, and outreach partnership program; provided further that the department of land and natural resources shall submit a report each year on the statewide strategic plan for the invasive species prevention, control, research, and outreach partnership program and identify the short and long term needs of the program with specific performance outcomes; provided further that the department shall submit a report to the legislature no less than twenty days prior to the convening of the 2005 regular session of all appropriation transfers (state and non-state) to other departments, including a detailed breakdown of matching non-state funds or equivalent services received by source, including dollar amounts and how the funds expended addressed the needs of the strategic plan and the strategic plan’s performance outcomes; provided further that the funds to be expended for the program are matched by at least $5,000,000 in federal, county, private, and other non-state funds or in-kind services; and provided further that the funds shall not be used for any other purpose."

    1. By adding a new section to read as follows:

"SECTION 25.1. Provided that any increase in the federal funding for hansen's disease services (HTH 111) for Kalaupapa may be expended for purposes of the program as approved by the governor."

    1. By adding a new section to read as follows:

"SECTION 25.2. Provided that the Hawaii health systems corporation shall submit its audited financial statement report as prepared by an independent accounting firm in accordance with auditing standards generally accepted under the United States of America and Government Auditing Standards issued by the Comptroller General of the United States; provided further that this report shall include, but not be limited to, consolidated financial statements of the corporation for fiscal year 2003-2004, and the independent auditor’s report in accordance with Government Auditing Standards on the corporation’s internal control and compliance with laws and regulations; and provided further that the audited financial report for fiscal year 2003-2004 shall be submitted to the legislature no later than twenty days prior to the convening of the 2005 regular session."

(8) By adding a new section to read as follows:

"SECTION 25.3. Provided that the Hawaii health systems corporation shall submit interim financial statements for the first six months of fiscal year 2004-2005; provided further that interim financial statements requested shall include, but not be limited to, a balance sheet and income statement, a breakdown of revenues and expenditures by location/hospital, aging of accounts receivable, aging of accounts payable, capital lease payment schedule, and cash flow projections for the current and next fiscal year; and provided further that this report shall be submitted to the legislature no later than thirty days after the end of the first half of fiscal year 2004-2005."

(9) By adding a new section to read as follows:

"SECTION 26.1. Provided that the adult mental health division (HTH 420) shall submit a quarterly report on all payments made pursuant to the memorandum of agreement between the department of human services and the department of health dated November 26, 2002, to the Med-QUEST division for community mental health program services determined to be eligible for federal financial participation and provided to eligible aged, blind, and disabled medicaid recipients; provided further that the report shall be submitted to the legislature no later than forty-five days after the end of each fiscal quarter."

(10) By amending section 33 to read as follows:

"SECTION 33. Provided that of the general fund appropriation for child out-of-home payments (HMS 303), the sum of $30,579,126 for fiscal year 2003—2004 and the sum of [$33,182,056] $36,827,090 for fiscal year 2004—2005 shall be expended for adoption assistance, permanency assistance, relative foster board, non-relative foster board, and board—related costs and difficulty of care payments; and provided further that the department of human services shall submit a report each year to the legislature on the number of children who receive adoption assistance or difficulty of care payments and the amount of these payments for the previous fiscal year and the current fiscal year, five months actual, no later than twenty days prior to the convening of the 2004 and 2005 regular sessions."

(11) By amending section 35 to read as follows:

"SECTION 35. Provided that of the general fund appropriation for adult and community care services (HMS 601), the sum of $1,833,307 for fiscal year 2003—2004 and the sum of [$1,833,307] $2,601,157 for fiscal year 2004—2005 shall be used to pay for chore services cash payments; provided further that any unexpended funds shall lapse to the general fund; provided further that the department of human services shall submit a report each year that shall include, but not be limited to:

(1) All expenditures made broken down by cost element; and

(2) The number of individuals served by the program;

and provided further that the report shall be submitted to the legislature no later than twenty days prior to the convening of the 2004 and 2005 regular sessions, respectively."

(12) By adding a new section to read as follows:

"SECTION 36.1. Provided that of the general fund appropriation for health care payments (HMS 230), the sum of $250,000 for fiscal year 2004—2005 shall be expended for compliance with the Health Insurance Portability and Accountability Act Final Security Rule; provided further that the department of human services shall submit a status report to the legislature that shall include, but not be limited to, the progress made in complying with the Health Insurance Portability and Accountability Act Final Security Rule, all outstanding tasks, and an expenditure report of all Health Insurance Portability and Accountability Act Final Security Rule-related activities performed by the department of human services; and provided further that this report shall be submitted to the legislature no later than twenty days prior to the convening of the 2005 regular session."

(13) By amending section 37 to read as follows:

"SECTION 37. Provided that of the general fund appropriation for home and community—based care services (HMS 603), the sum of $11,585,054 for fiscal year 2003—2004 and the sum of [$11,585,054] $12,085,054 for fiscal year 2004—2005 shall be expended for the nursing home without walls and residential alternative community care programs; provided further that the department of human services shall submit a report each year on the number of clients receiving services and projected to receive services, the number of individuals requesting services or on any waitlists, and the number of individuals in the State that qualify for these services; and provided further that this report shall be submitted to the legislature each year no later than twenty days prior to the convening of the 2004 and 2005 regular sessions, respectively."

(14) By adding a new section to read as follows:

"SECTION 37.1. Provided that the department of Hawaiian home lands shall submit a progress report concerning the implementation of the department's five year plan including, but not limited, to the following:

(1) The number of applicants awarded Hawaiian home lands;

(2) The number of applicants on the Hawaiian home lands waiting list; and

(3) The location, status of awards, and number of home-sites and housing units for each of the existing and planned housing development projects;

provided further that the report shall be submitted to the legislature no later than thirty days after the end of each fiscal quarter."

(15) By adding a new section to read as follows:

"SECTION 37.2. Provided that the department of Hawaiian home lands shall submit a report regarding the actual and projected revenues and expenditures of the department's trust funds that includes the previous three fiscal years, the current fiscal year, and the upcoming six fiscal years; provided further that the report shall be submitted under the above-established guidelines to the legislature no later than twenty days prior to the convening of the 2005 regular session."

(16) By adding a new section to read as follows:

"Section 38.1. Provided that the Med-QUEST division of the department of human services shall submit a report including, but not limited to, the following information:

(1) All payments made to certified provider agencies for community mental health program services, pursuant to the memorandum of agreement between the department of human services and the department of health dated November 26, 2002;

(2) All receipts of federal reimbursements;

(3) All payments made to the adult mental health division;

and provided further that the report shall be submitted to the legislature no later than thirty days after the end of each quarter."

(17) By amending section 39 to read as follows:

"SECTION 39. Provided that of the general fund appropriation for school-based budgeting (EDN 100), the sum of $123,918,240 for fiscal year 2003-2004 and the sum of [$136,579,047] $124,395,499 for fiscal year 2004-2005 shall be used to pay for health fund benefits for department of education employees [and]. The funds shall be transferred to the program planning, analysis, and budgeting program (BUF 101) of the department of budget and finance for this purpose[; and provided further that the funds shall be transferred] no later than July 16 of each respective fiscal year."

(18) By adding a new section to read as follows:

"SECTION 39.1. Provided that of the general fund appropriation for charter schools (EDN 600), the sum of $2,845,457 for fiscal year 2004-2005 shall be used to pay for health fund benefits for charter school employees. The funds shall be transferred to the program planning, analysis, and budgeting program (BUF 101) of the department of budget and finance for this purpose no later than July 16 of the respective fiscal year."

(19) By amending section 40 to read as follows:

"SECTION 40. Provided that of the general fund appropriation for school-based budgeting (EDN 100), the sum of $98,933,822 for fiscal year 2003-2004 and the sum of [$106,291,688] $98,377,766 for fiscal year 2004-2005 shall be used to pay for debt service on general obligation bonds issued for department of education projects [and]. The funds shall be transferred to the financial administration program (BUF 115) of the department of budget and finance for this purpose[; and provided further that the funds shall be transferred] no later than July 16 of each respective fiscal year."

(20) By amending section 41 to read as follows:

"SECTION 41. Provided that of the general fund appropriation for school-based budgeting (EDN 100), the sum of $76,403,876 for fiscal year 2003-2004 and the sum of [$105,883,879] $104,693,245 for fiscal year 2004-2005 shall be used to pay for pension accumulation contributions for department of education employees; provided further that the sum of $63,911,192 for fiscal year 2003-2004 and the sum of [$65,914,430] $66,142,475 for fiscal year 2004-2005 shall be used to pay for social [security/Medicare] security/medicare contributions for department of education employees; provided further that the amounts shall be transferred to the retirement program (BUF 141) of the department of budget and finance for that purpose[; and provided further that the funds shall be transferred] no later than July 16 of each respective fiscal year."

(21) By adding a new section to read as follows:

"SECTION 41.1. Provided that of the general fund appropriation for charter schools (EDN 600), the sum of $1,190,634 for fiscal year 2004-2005 shall be used to pay for pension accumulation contributions for charter school employees; provided further that the sum of $1,451,756 for fiscal year 2004-2005 shall be used to pay for social security/medicare contributions for charter school employees; provided further that the funds shall be transferred to the retirement program (BUF 141) of the department of budget and finance for that purpose no later than July 16 of the respective fiscal year."

(22) By amending section 42 to read as follows:

"SECTION 42. Provided that of the general fund appropriations for school based budgeting (EDN 100), the following fiscal year 2004-2005 cost items shall be considered non-recurring cost items:

(1) Equipment for new [4,281,492]4,580,612

facilities-regular

instruction

(2) Equipment for new facilities- 128,122

special Education

(3) Equipment for new facilities- 106,143

school Administration

(4) Equipment for new facilities- 259,164[;]

school libraries

(5) Equipment for new facilities- 48,179;

support services

and provided further that the aforementioned cost items shall be reduced by the appropriate amount at the beginning of fiscal biennium 2005-2007."

    1. By adding a new section to read as follows:

"SECTION 42.1. Provided that of the general fund appropriation for school based budgeting (EDN 100) for fiscal year 2004-2005, the sum of $2,094,480 for school safety manager/resource officer contracted positions shall be expended as follows:

Honolulu office district (Farrington-Kaiser complex: Farrington high school, Dole middle school, Kalakaua middle school, Kaiser high school, Niu Valley middle school; Kaimuki-Kalani complex: Kaimuki high school, Jarrett middle school, Kalani high school, Kaimuki middle school; McKinley-Roosevelt complex: McKinley high school, Central middle school, Washington middle school, Roosevelt high school, Kawananakoa middle school, Stevenson middle school): $455,322.

Central office district (Aiea-Moanalua-Radford complex: Aiea high school, Aiea intermediate school, Moanalua high and middle school, Radford high school, Aliamanu middle school; Leilehua-Mililani-Waialua complex: Leilehua high school, Wahiawa middle school, Wheeler middle school, Mililani high and middle school, Waialua high school and Waialua intermediate school): $364,257.

Leeward office district: (Campbell-Kapolei-Waianae complex: Campbell high school, Ilima intermediate school, Kapolei high school, Kapolei middle school, Waianae high and intermediate school; Nanakuli-Pearl City-Waipahu complex: Nanakuli high and intermediate school, Pearl City high school, Highlands intermediate school, Waipahu high and intermediate school): $333,903.

Windward office district: (Castle-Kahuku complex: Castle high school, King intermediate school, Kahuku high and intermediate school; Kailua-Kalaheo complex: Kailua high school, Waimanalo elementary and intermediate school, Olomana school, Kalaheo high school, Kailua intermediate School): $242,838.

Hawaii office district: (Hilo-Laupahoehoe-Waiakea complex: Hilo high school, Hilo intermediate school, Waiakea high and intermediate school; Ka’u-Keaau-Pahoa complex: Ka’u high school, Keaau high and middle school, Pahoa high and intermediate school; Kohala-Honokaa-Kealakehe-Kohala-Konawaena complex: Honokaa high and intermediate school, Waimea middle school, Kealakehe high and intermediate school, Kohala high school, Konawaena high and middle school): $455,322.

Maui office district: (Baldwin-Kekaulike-Maui complex: Iao school, Samuel Enoka Kalama intermediate school, Lokelani intermediate school, Maui Waena intermediate school; Hana-Lahainaluna-Lanai-Molokai complex: Lahaina intermediate school): $151,774.

Kauai office district: (Kapaa-Kauai-Waimea complex: Kapaa middle school, Chiefess Kamakahelei middle school, Waimea Canyon school): $91,064."

(24) By amending section 51 to read as follows:

SECTION 51. Provided that of the general fund appropriation for systemwide support (UOH 900), the sum of $45,211,688 for fiscal year 2003-2004 and the sum of [$49,864,433] $46,455,135 for fiscal year 2004-2005 shall be used to pay for health fund benefits for university of Hawaii employees [and]. The funds shall be transferred to the program planning, analysis, and budgeting program (BUF 101) of the department of budget and finance for that purpose[; and provided further that the funds shall be transferred] no later than July 16 of each respective fiscal year.

(25) By amending section 52 to read as follows:

"SECTION 52. Provided that of the general fund appropriation for systemwide support (UOH 900), the sum of $45,661,764 for fiscal year 2003-2004 and the sum of [$49,057,702] $45,405,122 for fiscal year 2004-2005 shall be used to pay for debt service on general obligation bonds issued for university of Hawaii projects [and]. The funds shall be transferred to the financial administration program (BUF 115) of the department of budget and finance for that purpose[; and provided further that the funds shall be transferred] no later than July 16 of each respective fiscal year."

(26) By amending section 53 to read as follows:

SECTION 53. Provided that of the general fund appropriation for systemwide support (UOH 900), the sum of $29,936,414 for fiscal year 2003-2004 and the sum of $41,477,688 for fiscal year 2004-2005 shall be used to pay for pension accumulation contributions for university of Hawaii employees; provided further that the sum of $24,548,788 for fiscal year 2003-2004 and the sum of [$25,318,248] $25,963,472 for fiscal year 2004-2005 shall be used to pay for social [security/Medicare] security/medicare contributions for university of Hawaii employees; provided further that the amounts shall be transferred to the retirement program (BUF 141) of the department of budget and finance for that purpose[; and provided further that the funds shall be transferred] no later than July 16 of each respective fiscal year.

(27) By amending section 56 to read as follows:

"SECTION 56. Provided that of the general fund appropriation for intake service centers (PSD 410), corrections program services (PSD 420), and adult parole supervision and counseling (PSD 612), the sum of $418,401 for fiscal year 2003-2004 and the sum of [$418,401] $918,401 for fiscal year 2004-2005 shall be expended for substance abuse treatment, sex offender treatment, transition skills and job development, and mental health treatment programs for the pretrial, incarcerated, and parolee populations; provided further that any unexpended funds shall lapse to the general fund; provided further that the department of public safety shall submit a report each year on all services provided, graduation rates, recidivism rates of graduates, and expenditures for the previous fiscal year and the current fiscal year, four months actual; provided further that this report shall include monthly parole population counts and parole revocations for the previous fiscal year and the current fiscal year, four months actual; and provided further that this report shall be submitted to the legislature no later than twenty days prior to the convening of the 2004 and 2005 regular sessions[, respectively]."

(28) By amending section 57 to read as follows:

"SECTION 57. Provided that of the general fund appropriation for general administration (PSD 900), the sum of $28,523,136 for fiscal year 2003-2004 and the sum of [$28,523,136] $33,520,992 for fiscal year 2004-2005 shall be expended for mainland prison contracts for transportation and necessary operation costs of housing; provided further that if the department of public safety determines that there are inmates who can be released or paroled for the purpose of treatment, and that such release or parole lowers the number of beds that need to be leased in mainland facilities, then an appropriate part of this sum may be used for treatment services; provided further that any unexpended funds shall lapse into the general fund; provided further that the department of public safety shall submit a report each year of all expenditures made for [the] mainland prisoners for the previous fiscal year and the current fiscal year, four months actual; and provided further that this report shall be submitted to the legislature no later than twenty days prior to the convening of the 2004 and 2005 regular sessions[, respectively]."

(29) By amending section 58 to read as follows:

"SECTION 58. Provided that of the general fund appropriation for general administration (PSD 900), the sum of $2,628,000 for fiscal year 2003-2004 and the sum of [$2,628,000] $3,384,747 for fiscal year 2004-2005 shall be expended for the housing of inmates at the Hawaii based federal detention centers or mainland facilities; provided further that the department of public safety shall provide a report to the legislature each year concerning its actions surrounding the transportation of additional inmates to mainland facilities to make available more space, the total cost including transportation and housing of an inmate on the mainland versus renting bed space at the federal detention center, and a detailed breakdown of the criteria used to select which inmates are eligible to be moved to mainland facilities; and provided further that this report shall be submitted to the legislature no later than twenty days prior to the convening of the 2004 and 2005 regular sessions[, respectively]."

(30) By amending section 63 to read as follows:

SECTION 63. Provided that of the general fund and inter-departmental transfer funds appropriated for program planning, analysis, and budgeting (BUF 101), the sums of [$300,106,277] $290,530,300 and [$330,724,775] $308,112,682, respectively for fiscal year 2003-2004 and fiscal year 2004-2005, or so much thereof as [shall] may be necessary, shall be expended for the State employers share of health premiums for active employees and retirees; provided further that the Hawaii employer-union health benefits trust fund shall only contract for and offer health benefit and insurance plans that satisfy the objectives of chapter 87A, Hawaii Revised Statutes; provided further that the total aggregate cost of plans contracted for and offered to state active employees and retirees in fiscal year 2003-2004 and fiscal year 2004-2005 shall not exceed the total aggregate amount appropriated for the state employers’ share of that fiscal year adjusted for active and retiree enrollment levels; provided further that funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund.

(31) By amending section 64 to read as follows:

"SECTION 64. Provided that of the general fund appropriation for program[,] planning, analysis, and budgeting (BUF 101), the sum of $600,789 for fiscal year 2003-2004 and [$570,789] $770,789 for fiscal year 2004-2005 shall be expended as a subsidy to the Bishop Museum; and provided further that any unexpended funds for this purpose shall lapse to the general fund."

(32) By amending section 65 to read as follows:

"SECTION 65. Provided that of the general fund appropriation for the office of elections [(LTG 102),] (AGS 879), the sum of $1,229,348 for fiscal year 2004-2005 shall be expended for election day workers, which shall include but not be limited to section heads, specialists, assistants, computer programmers, warehouse workers, warehouse supervisors, precinct officials, troubleshooters, and other various poll workers; provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

(33) By amending section 68 to read as follows:

"SECTION 68. Provided that of the general fund appropriation for financial administration (BUF 115), the sum of [$206,109,206] $190,299,559 for fiscal year 2003-2004 and the sum of [$221,437,876] $204,163,271 for fiscal year 2004-2005 shall be used to pay for interest and principal on general obligation bonds; provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

(34) By adding a new section to read as follows:

"SECTION 68.1. Provided that of the revolving fund appropriation for the criminal forfeiture revolving fund, any revenue in excess of $1,200,000 after the close of fiscal year 2003-2004 shall be transferred to the department of health alcohol and drug abuse division’s drug demand reduction assessments special fund to be expended for the purpose of alcohol and drug abuse prevention and treatment."

(35) By amending section 72 to read as follows:

"SECTION 72. Provided that of the general fund appropriation for work force attraction, selection, classification, and effectiveness (HRD 102), the sum of $4,933,726 for fiscal year 2003-2004 and the sum of [$4,933,726] $6,789,622 for fiscal year 2004-2005 shall be expended for workers' compensation claims; and provided further that the department of human resources development shall submit a detailed report each year of all expenditures, including the number of claims for workers' compensation claim payments; statistics on the duration of payments made to claimants; statistics on the average compensation paid per claimant; and a breakdown of the claims paid by department. This report shall be submitted to the legislature no later than twenty days prior to the convening of the 2004 and 2005 regular sessions[, respectively]."

(36) By amending section 75 to read as follows:

"SECTION 75. Provided that of the general fund appropriation for the department of budget and finance, retirement (BUF 141), the sum of $62,609,484 for fiscal year 2003-2004 and the sum of [$64,571,922] $66,217,510 for fiscal year 2004-2005 shall be expended for the employer’s share of the social [security/Medicare] security/medicare payment for employees; provided further that funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

(37) By amending section 76 to read as follows:

"SECTION 76. Provided that of the interdepartmental transfer appropriation for retirement (BUF 141), the sum of $88,459,980 for fiscal year 2003-2004 and the sum of [$91,232,678] $93,557,703 for fiscal year 2004-2005 shall be expended for the university of Hawaii and department of education’s employer’s share of the social [security/Medicare] security/medicare payment; provided further that funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

(38) By adding a new section to read as follows:

"SECTION 76.1. Provided that the department of accounting and general services shall submit a report on risk management (AGS 203); provided further that the report shall include, but not be limited to, information regarding the sufficient amount of funds that should be in the state risk management revolving fund for emergency use, no later than twenty days prior to the convening of the 2005 regular session."

SECTION 5. Part IV, Act 200, Session Laws of Hawaii 2003, is amended by amending section 77 to read as follows:

"SECTION 77. CAPITAL IMPROVEMENT PROJECTS AUTHORIZED. The sums of money appropriated or authorized in part II of this Act for capital improvements shall be expended for the projects listed below. Accounting of the appropriations by the department of accounting and general services shall be based on the projects as such projects are listed in this section. Several related or similar projects may be combined into a single project, if such combination is advantageous or convenient for implementation; and provided further that the total cost of the projects thus combined shall not exceed the total of the sum specified for the projects separately. (The amount after each cost element and the total funding for each project listed in this part are in thousands of dollars.)

A. ECONOMIC DEVELOPMENT

BED101 - BUSINESS DEVELOPMENT AND MARKETING

0.01. HAWAII THEATRE CENTER, OAHU

DESIGN AND CONSTRUCTION FOR THE RESTORATION AND MAINTENANCE OF THE HAWAII THEATRE CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 30

CONSTRUCTION 120

TOTAL FUNDING BED C 150 C

 

0.02. OAHU ARTS CENTER, OAHU

PLANS AND DESIGN FOR A PERFORMING ARTS EDUCATION CENTER AND AN AUDITORIUM. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 199

DESIGN 1

TOTAL FUNDING BED C 200 C

 

BED107 - FOREIGN TRADE ZONE

0.03. FTZ002 PIER 2 WAREHOUSE AND OFFICE IMPROVEMENTS, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE EXPANSION OF EXISTING OFFICE AND WAREHOUSE SPACE. PROJECT MAY INCLUDE THE INSTALLATION OF A NEW CHILLER SYSTEM AND A FACILITY FOR FUMIGATION.

PLANS 50

DESIGN 50

CONSTRUCTION 1,700

EQUIPMENT 100

TOTAL FUNDING BED N 1,900 N

 

 

0.04. FOREIGN-TRADE ZONE SECURITY IMPROVEMENTS, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR VARIOUS IMPROVEMENTS TO THE PHYSICAL SECURITY OF THE FOREIGN-TRADE ZONE FACILITY AND THE UPGRADE OF THE ALARM AND SURVEILLANCE SYSTEM.

DESIGN 25

CONSTRUCTION 75

EQUIPMENT 150

TOTAL FUNDING BED C 250 C

 

BED113 - TOURISM

0.05. HCC501 HAWAII CONVENTION CENTER MAJOR REPAIR, REPLACEMENT AND MAINTENANCE, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE MAJOR REPAIR, REPLACEMENT AND MAINTENANCE OF THE HAWAII CONVENTION CENTER. REPLACEMENT OF WORN FLOOR COVERING, OF OUTDATED EQUIPMENT, INSTALLATION OF NEW EQUIPMENT AND MAJOR MODIFICATION AND REFURBISHING OF THE CENTER.

PLANS 10

DESIGN 10

CONSTRUCTION 280

EQUIPMENT 1,700

TOTAL FUNDING BED C 2,000 C

 

 

0.06. HONOLULU ZOO SOCIETY, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR THE DEVELOPMENT OF AN EDUCATION/DISCOVERY CENTER COMPLEX, VETERINARY CLINIC, AND HAWAIIAN ISLANDS EXHIBIT AT THE HONOLULU ZOO. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 1

DESIGN 49

CONSTRUCTION 150

TOTAL FUNDING BED C 200 C

 

0.07. MILITARY AVIATION MUSEUM OF THE PACIFIC, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR THE DEVELOPMENT OF AN AVIATION MUSEUM AND NATIONAL HISTORIC SITE ON FORD ISLAND. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 50

DESIGN 100

CONSTRUCTION 350

TOTAL FUNDING BED C 500 C

 

 

AGR141 - AGRICULTURAL RESOURCE MANAGEMENT

[1. 200202 STATE AGRICULTURAL WATER AND USE DEVELOPMENT PLAN, STATEWIDE

PLANS TO PREPARE STATE AGRICULTURAL WATER PLAN AS MANDATED BY ACT 101, SLH 1998. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 300

TOTAL FUNDING AGR 150 C C

AGR 150 N N]

1. 200401 STATE AGRICULTURAL WATER AND USE DEVELOPMENT PLAN, STATEWIDE

PLANS TO PREPARE STATE AGRICULTURAL WATER PLAN AS MANDATED BY ACT 101, SLH 1998. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 300

TOTAL FUNDING AGR 150 C C

AGR 150 N N

 

2. 970001 WAIANAE AGRICULTURAL PARK, DRAINAGE IMPROVEMENTS, OAHU

CONSTRUCTION FOR THE WAIANAE AGRICULTURAL PARK SUBDIVISION, CONSISTING OF OPEN DITCHES, SEDIMENT PONDS AND OTHER APPURTENANT WORKS.

CONSTRUCTION 2,200

TOTAL FUNDING AGR 2,200 C C

 

[3. MOLOKAI IRRIGATION SYSTEM IMPROVEMENTS, MOLOKAI

PLANS FOR THE IDENTIFICATION OF NEW SOURCES FOR THE MOLOKAI IRRIGATION SYSTEM, IMPROVEMENTS TO ADDRESS LONG-TERM NEEDS, AND EXPANSION.

PLANS 200

TOTAL FUNDING AGR 200 C C]

3. 200106 MOLOKAI IRRIGATION SYSTEM IMPROVEMENTS, MOLOKAI

PLANS FOR THE IDENTIFICATION OF NEW SOURCES FOR THE MOLOKAI IRRIGATION SYSTEM, IMPROVEMENTS TO ADDRESS LONG-TERM NEEDS, AND EXPANSION.

PLANS 200

TOTAL FUNDING AGR 200 C C

 

3.01. AGRICULTURAL WATER AND INFRASTRUCTURE DEVELOPMENT, STATEWIDE

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE DEVELOPMENT OF NEW WATER RESOURCES AND IMPROVEMENTS TO EXISTING WATER INFRASTRUCTURE, STATEWIDE.

PLANS 25

LAND 125

DESIGN 25

CONSTRUCTION 1,300

EQUIPMENT 25

TOTAL FUNDING AGR C 1,500 C

 

 

3.02. PAAUILO RENDERING PLANT, HAWAII

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION OF EXISTING FACILITY AND REPLACEMENT OF EQUIPMENT.

PLANS 75

DESIGN 75

CONSTRUCTION 750

EQUIPMENT 200

TOTAL FUNDING AGR C 1,100 C

 

AGR153 - AQUACULTURE DEVELOPMENT PROGRAM

[4. THE OCEANIC INSTITUTE, HAWAII

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE OCEANIC INSTITUTE'S CENTER FOR APPLIED AQUACULTURE AND MARINE BIOTECHNOLOGY AQUATIC FEEDS RESEARCH AND PILOT PRODUCTION FACILITY IN HILO. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 498

EQUIPMENT 1

TOTAL FUNDING AGR 500 C C]

 

4. P30002 THE OCEANIC INSTITUTE, HAWAII

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE OCEANIC INSTITUTE'S CENTER FOR APPLIED AQUACULTURE AND MARINE BIOTECHNOLOGY AQUATIC FEEDS RESEARCH AND PILOT PRODUCTION FACILITY IN HILO. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 498

EQUIPMENT 1

TOTAL FUNDING AGR 500 C C

 

BED143 - HIGH TECHNOLOGY DEVELOPMENT CORPORATION

4.01. TE005 MAUI RESEARCH AND TECHNOLOGY CENTER BUILDING C, MAUI

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR BUILDING(S) ON THE SITE OF THE MAUI RESEARCH AND TECHNOLOGY CENTER, KIHEI, MAUI, HAWAII. BUILDING(S) TO BE USED BY TECHNOLOGY COMPANIES AND FOR TECHNOLOGY PURPOSES.

PLANS 5

DESIGN 700

CONSTRUCTION 7,500

EQUIPMENT 200

TOTAL FUNDING BED E 8,405 E

 

 

4.02. BIOTECHNOLOGY INCUBATOR AND INNOVATION FACILITY AT KAKAAKO, OAHU

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A BIOTECH INCUBATOR AND INNOVATION FACILITY INCLUDING WET LAB SPACE AT KAKAAKO.

PLANS 500

LAND 1

DESIGN 1,497

CONSTRUCTION 1

EQUIPMENT 1

TOTAL FUNDING BED C 2,000 C

 

BED146 - NATURAL ENERGY LABORATORY OF HAWAII AUTHORITY

4.03. NELH25 NELHA MAIN PUMP STATION RENOVATION AND UPGRADE, HAWAII

PLANS, DESIGN, AND CONSTRUCTION FOR THE RENOVATION TO THE EXISTING PUMP STATION.

PLANS 30

DESIGN 60

CONSTRUCTION 750

TOTAL FUNDING BED C 840 C

 

 

LNR141 - WATER AND LAND DEVELOPMENT

[5. J32 WAIMANALO WASTEWATER TREATMENT PLANT IMPROVEMENTS, OAHU

CONSTRUCTION FOR INCREMENTAL IMPROVEMENTS TO MEET WATER QUALITY STANDARDS, INCLUDING INJECTION WELLS, BACKWASH FILTER STRUCTURE AND FILTER CELLS, CHLORINE MIXING AND CONTACT CHAMBER, DISSOLVED AIR FLOTATION THICKENER, CLARIFIERS, PUMP STATION, FLOOD PROOFING, EQUALIZATION BASIN SYSTEM UPGRADES, AND OTHER RELATED WORK.

CONSTRUCTION 1,400

TOTAL FUNDING LNR 1,400 C C]

5. J32 WAIMANALO WASTEWATER TREATMENT PLANT IMPROVEMENTS, OAHU

CONSTRUCTION FOR INCREMENTAL IMPROVEMENTS TO MEET WATER QUALITY STANDARDS, INCLUDING INJECTION WELLS, FILTER STRUCTURES AND FILTER CELLS, DISINFECTION MIXING AND CONTACT CHAMBER, DISSOLVED AIR FLOTATION THICKENER, CLARIFIERS, PUMP STATION, FLOOD PROOFING, EQUALIZATION BASIN SYSTEM UPGRADES, TERTIARY TREATMENT, AND OTHER RELATED WORK.

CONSTRUCTION 1,400 1,800

TOTAL FUNDING LNR 1,400 C 1,800 C

 

 

5.01. ALA WAI WATERSHED IMPROVEMENTS, OAHU

DESIGN AND CONSTRUCTION OF RETENTION BASINS AND VEGETATIVE COVER ALONG STREAM BANKS IN THE ALA WAI WATERSHED AREA TO REDUCE SEDIMENT FLOW INTO THE ALA WAI CANAL.

DESIGN 1

CONSTRUCTION 399

TOTAL FUNDING LNR C 400 C

 

BED150 - HAWAII COMMUNITY DEVELOPMENT AUTHORITY

[6. HCD001 KAKAAKO COMMUNITY DEVELOPMENT DISTRICT, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR COSTS FOR PROJECT FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENT PROJECTS FOR HAWAII COMMUNITY DEVELOPMENT AUTHORITY'S KAKAAKO COMMUNITY DEVELOPMENT DISTRICT. FUNDS MAY BE USED TO MATCH FEDERAL AND NON-STATE FUNDS, AS MAY BE AVAILABLE.

PLANS 1,309 1,324

LAND 1 1

DESIGN 1 1

CONSTRUCTION 1 1

TOTAL FUNDING BED 1,312 C 1,327 C]

 

6. HCD001 KAKAAKO COMMUNITY DEVELOPMENT DISTRICT, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR COSTS FOR PROJECT FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENT PROJECTS FOR HAWAII COMMUNITY DEVELOPMENT AUTHORITY'S KAKAAKO COMMUNITY DEVELOPMENT DISTRICT. FUNDS MAY BE USED TO MATCH FEDERAL AND NON-STATE FUNDS, AS MAY BE AVAILABLE.

PLANS 1,309

LAND 1

DESIGN 1

CONSTRUCTION 1

TOTAL FUNDING BED 1,312 C C

 

6.01. KA010 KAKAAKO PARKING STRUCTURE, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR COSTS OR PORTIONS THEREOF ASSOCIATED WITH CONSTRUCTION OF A 1000-STALL PUBLIC PARKING FACILITY.

PLANS 1

DESIGN 1,999

CONSTRUCTION 18,000

TOTAL FUNDING BED E 20,000 E

 

 

6.02. HONUAKAHA HOUSING COMPLEX RECONSTRUCTION AND IMPROVEMENTS, OAHU

DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE HONUAKAHA HOUSING COMPLEX. IMPROVEMENTS MAY INCLUDE REROOFING, SLAB REPAIR, WATERPROOFING, RENOVATIONS, REPLACEMENT OF COURTYARD AND PLANTER HARDSCAPE AND LANDSCAPE, AND OTHER MISCELLANEOUS IMPROVEMENTS.

DESIGN 400

CONSTRUCTION 2,600

TOTAL FUNDING BED C 3,000 C

 

 

B. EMPLOYMENT

HMS802 - VOCATIONAL REHABILITATION

[1. LANAKILA REHABILITATION CENTER, OAHU

DESIGN AND CONSTRUCTION FOR THE RENOVATION AND IMPROVEMENT OF THE HOOPONO ANNEX. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 499

TOTAL FUNDING HMS 500 C C]

1. P30003 LANAKILA REHABILITATION CENTER, OAHU

DESIGN AND CONSTRUCTION FOR THE RENOVATION AND IMPROVEMENT OF THE HOOPONO ANNEX. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 499

TOTAL FUNDING HMS 500 C C

 

LBR903 - OFFICE OF COMMUNITY SERVICES

[2. HONOLULU COMMUNITY ACTION PROGRAM, OAHU

LAND ACQUISITION FOR THE ACQUISITION OF THE MENDONCA BUILDING FOR THE HONOLULU COMMUNITY ACTION PROGRAM. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

LAND 625

TOTAL FUNDING LBR 625 C C]

 

2. P30004 HONOLULU COMMUNITY ACTION PROGRAM, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR AN ADMINISTRATIVE HEADQUARTERS AND RELATED COMMUNITY FACILITIES FOR THE HONOLULU COMMUNITY ACTION PROGRAM. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 1

LAND 622

DESIGN 1

CONSTRUCTION 1

TOTAL FUNDING LBR 625 C C

 

[3. ORI ANUENUE HALE, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT TO CONSTRUCT AND EQUIP ORI ANUENUE HALE'S COMMUNITY SERVICE FACILITY IN CENTRAL OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 2,000

EQUIPMENT 499

TOTAL FUNDING LBR 2,500 C C]

 

3. P30005 ORI ANUENUE HALE, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT TO CONSTRUCT AND EQUIP ORI ANUENUE HALE'S COMMUNITY SERVICE FACILITY IN CENTRAL OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 2,000

EQUIPMENT 499

TOTAL FUNDING LBR 2,500 C C

 

[4. SEAGULL SCHOOLS, OAHU

DESIGN AND CONSTRUCTION FOR CHILDCARE CENTERS ON OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 699

TOTAL FUNDING LBR 700 C C]

4. P30006 SEAGULL SCHOOLS, OAHU

DESIGN AND CONSTRUCTION FOR CHILDCARE CENTERS ON OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 699

TOTAL FUNDING LBR 700 C C

 

 

C. TRANSPORTATION FACILITIES

TRN102 - HONOLULU INTERNATIONAL AIRPORT

1. A20A HONOLULU INTERNATIONAL AIRPORT, INTRA-TERMINAL TRANSPORTATION SYSTEM, OAHU

CONSTRUCTION TO IMPLEMENT THE RECOMMENDATIONS OF THE INTRA-TERMINAL TRANSPORTATION SYSTEM, PHASE I PLANNING STUDY AND RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 45,000

TOTAL FUNDING TRN E 20,000 E

TRN N 25,000 N

2. A24A HONOLULU INTERNATIONAL AIRPORT, EMERGENCY OPERATIONS CENTER, OAHU

CONSTRUCTION OF AN EMERGENCY OPERATIONS CENTER AND RELATED IMPROVEMENTS AT THE AIRPORT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 9,800

TOTAL FUNDING TRN 3,800 E E

TRN 6,000 N N

 

3. A41K HONOLULU INTERNATIONAL AIRPORT, ARCHITECTURAL BARRIER REMOVAL, OAHU

CONSTRUCTION FOR ARCHITECTURAL BARRIER REMOVAL TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS AT HONOLULU INTERNATIONAL AIRPORT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 3,000

TOTAL FUNDING TRN 700 B B

TRN 2,300 X X

3.01. A24B HONOLULU INTERNATIONAL AIRPORT, INLINE BAGGAGE SYSTEM IMPROVEMENTS, OAHU

CONSTRUCTION OF INLINE BAGGAGE SYSTEM IMPROVEMENTS INCLUDING EXPLOSIVE DETECTION SYSTEMS, BAGGAGE BELT CONVEYORS AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 28,250

TOTAL FUNDING TRN E 12,250 E

TRN N 16,000 N

 

 

3.02. A29A HONOLULU INTERNATIONAL AIRPORT, AIR CONDITIONING SYSTEM IMPROVEMENTS, OAHU

DESIGN FOR A REPLACEMENT OF THE AIRPORT CHILLER PLANT AND CONSTRUCTION OF A CHILLED WATER LOOP LOCATED IN THE OVERSEAS TERMINAL OF HONOLULU INTERNATIONAL AIRPORT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 2,250

TOTAL FUNDING TRN B 525 B

TRN N 1,725 N

 

TRN104 - GENERAL AVIATION

4. A71C KALAELOA AIRPORT FACILITY IMPROVEMENTS, OAHU

DESIGN AND CONSTRUCTION FOR KALAELOA AIRPORT FACILITY IMPROVEMENTS INCLUDING LEASE LOTS, APRONS, RUNWAYS, TAXIWAYS, AND AVIATION FACILITIES SUCH AS THE CONTROL TOWER, AIRPORT RESCUE FIRE FIGHTING (ARFF) BUILDING, HANGAR, AND AVIATION FUEL SYSTEM. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 50

CONSTRUCTION 450

TOTAL FUNDING TRN 50 B 50 B

TRN N 400 N

 

TRN111 - HILO INTERNATIONAL AIRPORT

5. B10P HILO INTERNATIONAL AIRPORT, INSTALLATION OF NEW FIRE ALARM SYSTEM, HAWAII

CONSTRUCTION FOR THE INSTALLATION OF A NEW FIRE ALARM SYSTEM.

CONSTRUCTION 250

TOTAL FUNDING TRN 250 B B

6. B10Q HILO INTERNATIONAL AIRPORT, INSTALLATION OF SECURITY FENCING, HAWAII

CONSTRUCTION FOR THE INSTALLATION OF SECURITY FENCING AND RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 900

TOTAL FUNDING TRN 300 E E

TRN 600 N N

7. B10S HILO INTERNATIONAL AIRPORT, MAINTENANCE BASEYARD IMPROVEMENTS, HAWAII

CONSTRUCTION FOR MAINTENANCE BASEYARD IMPROVEMENTS, INCLUDING REPLACING THE ROOF AND OTHER STRUCTURAL MEMBERS OF THE MAINTENANCE BUILDING, ADDING A NEW INVENTORY STORAGE BUILDING, AND A NEW CRASH FIRE REPAIR BAY.

CONSTRUCTION 500

TOTAL FUNDING TRN 500 B B

 

7.01. B10N NOISE ATTENUATION FOR KEAUKAHA SUBDIVISION, HAWAII

CONSTRUCTION FOR NOISE ATTENUATION OF PROPERTIES WITHIN THE 65-75 DNL CONTOUR RANGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 700

TOTAL FUNDING TRN B 100 B

TRN N 600 N

 

TRN114 - KONA INTERNATIONAL AIRPORT AT KEAHOLE

8. C03B KONA INTERNATIONAL AIRPORT AT KEAHOLE, PARKING LOT EXPANSION, HAWAII

CONSTRUCTION FOR ADDITIONAL PARKING SPACES AT THE EXISTING EMPLOYEE PARKING LOT TO RELIEVE OVERFLOW CONDITIONS.

CONSTRUCTION 1,500

TOTAL FUNDING TRN 1,500 E E

TRN131 - KAHULUI AIRPORT

9. D08E KAHULUI AIRPORT GENERAL PURPOSE APRON AND ASAP BUILDING, MAUI

CONSTRUCTION FOR AN AVIATION FACILITY INCLUDING GENERAL PURPOSE APRON AND ALIEN SPECIES ACTION PLAN (ASAP) BUILDING. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 21,620

TOTAL FUNDING TRN 7,500 E E

TRN 14,120 N N

 

9.01. D04L KAHULUI AIRPORT TERMINAL DEVELOPMENT, MAUI

CONSTRUCTION OF TERMINAL IMPROVEMENTS INCLUDING ADDITIONAL TICKET LOBBIES, CONCESSION AND BAGGAGE CLAIM FACILITIES, SYSTEM IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 12,470

TOTAL FUNDING TRN E 5,700 E

TRN N 6,770 N

 

9.02. D05A KAHULUI AIRPORT RUNWAY SAFETY AREA IMPROVEMENTS, MAUI

DESIGN OF THE RUNWAY SAFETY AREA IMPROVEMENTS INCLUDING SITE WORK, INSTALLATION OF A DRAINAGE SYSTEM AND BOX CULVERT, CONSTRUCTION OF A NEW SERVICE ROAD, RELOCATION OF PERIMETER FENCING AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1,000

TOTAL FUNDING TRN B 1,000 B

 

 

9.03. D08L KAHULUI AIRPORT, INLINE BAGGAGE SYSTEM IMPROVEMENTS, MAUI

CONSTRUCTION OF INLINE BAGGAGE SYSTEM IMPROVEMENTS INCLUDING EXPLOSIVE DETECTION SYSTEMS, BAGGAGE BELT CONVEYORS AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 20,425

TOTAL FUNDING TRN E 11,800 E

TRN N 8,625 N

 

TRN141 - MOLOKAI AIRPORT

9.04. D55B MOLOKAI AIRPORT ARFF STATION IMPROVEMENTS, MOLOKAI

DESIGN FOR THE MOLOKAI AIRPORT AIRCRAFT RESCUE AND FIRE FIGHTING (ARFF) STATION IMPROVEMENTS INCLUDING SITE WORK, DEMOLITION AND RECONSTRUCTION AND REPLACEMENT OF A BUILDING, UTILITIES, DRIVEWAY WITH A PARKING AREA AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 300

TOTAL FUNDING TRN E 300 E

 

 

TRN151 - LANAI AIRPORT

9.05. D70D LANAI AIRPORT ARFF STATION IMPROVEMENTS, LANAI

DESIGN FOR THE LANAI AIRPORT AIRCRAFT RESCUE AND FIRE FIGHTING (ARFF) STATION IMPROVEMENTS INCLUDING SITE WORK, DEMOLITION AND RECONSTRUCTION AND REPLACEMENT OF A BUILDING, UTILITIES, DRIVEWAY WITH A PARKING AREA AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 150

TOTAL FUNDING TRN E 150 E

 

TRN161 - LIHUE AIRPORT

10. E03F LIHUE AIRPORT HELIPORT IMPROVEMENTS, KAUAI

CONSTRUCTION FOR A HELIPORT AT THE AIRPORT.

CONSTRUCTION 9,000

TOTAL FUNDING TRN 9,000 E E

11. E03J LIHUE AIRPORT, BAGGAGE CLAIM IMPROVEMENTS, KAUAI

CONSTRUCTION FOR IMPROVEMENTS TO BAGGAGE FACILITIES TO ACCOMMODATE THE LARGER BAGGAGE CAPACITY OF WIDE-BODY AIRCRAFT.

CONSTRUCTION 2,500

TOTAL FUNDING TRN 2,500 B B

 

TRN195 - AIRPORTS ADMINISTRATION

12. F04J AIRPORT PLANNING STUDY, STATEWIDE

PLANS FOR AIRPORT IMPROVEMENTS, ECONOMIC STUDIES, RESEARCH, AND ADVANCE PLANNING OF FEDERAL AID AND NON-FEDERAL AID PROJECTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1,000 1,000

TOTAL FUNDING TRN 900 B 900 B

TRN 100 N 100 N

13. F05A AIRPORT FIRE ALARM SYSTEM IMPROVEMENTS, STATEWIDE

CONSTRUCTION FOR FIRE ALARM SYSTEM IMPROVEMENTS AT AIRPORTS, STATEWIDE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 3,000

TOTAL FUNDING TRN 1,000 B B

TRN 2,000 N N

14. F06G LAND ACQUISITION, STATEWIDE

LAND ACQUISITION FOR AVIGATIONAL EASEMENTS, PROPERTY ACQUISITION, AND RELATED COSTS SUCH AS TITLE SEARCH, BOUNDARY SURVEYS, AND LAND APPRAISALS AT AIRPORTS STATEWIDE.

LAND 100

TOTAL FUNDING TRN 100 B B

 

[15. F08F AIRPORTS DIVISION CAPITAL IMPROVEMENT PROGRAM PROJECT STAFF COSTS, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S AIRPORTS DIVISION. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM PROJECT RELATED POSITIONS.

PLANS 100 100

DESIGN 800 800

CONSTRUCTION 850 850

TOTAL FUNDING TRN 1,750 B 1,750 B]

15. F08F AIRPORTS DIVISION CAPITAL IMPROVEMENT PROGRAM PROJECT STAFF COSTS, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S AIRPORTS DIVISION. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM PROJECT RELATED POSITIONS.

PLANS 100 109

DESIGN 800 860

CONSTRUCTION 850 931

TOTAL FUNDING TRN 1,750 B 1,900 B

 

 

16. F08G MISCELLANEOUS AIRPORT PROJECTS, STATEWIDE

DESIGN AND CONSTRUCTION OF IMPROVEMENTS AT VARIOUS STATE AIRPORTS. IMPROVEMENTS FOR SAFETY AND CERTIFICATION REQUIREMENTS, OPERATIONAL EFFICIENCY, AND PROJECTS REQUIRED FOR AIRPORT RELATED DEVELOPMENT.

DESIGN 300 300

CONSTRUCTION 2,700 2,700

TOTAL FUNDING TRN 3,000 B 3,000 B

17. F08H PROJECT DEFINITION REPORTS, STATEWIDE

PLANS FOR PROJECT SCOPING FOR PROJECTS UNDER THE CAPITAL IMPROVEMENT PROGRAM AT STATEWIDE AIRPORTS.

PLANS 750

TOTAL FUNDING TRN 750 B B

18. F08N AIRPORT ARCHITECTURAL BARRIER REMOVAL, STATEWIDE

CONSTRUCTION FOR ARCHITECTURAL BARRIER REMOVAL AT STATEWIDE AIRPORTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 2,000

TOTAL FUNDING TRN 1,000 B B

TRN 1,000 N N

 

19. F08O CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

CONSTRUCTION FOR CONSTRUCTION MANAGEMENT SUPPORT AT AIRPORT FACILITIES, STATEWIDE.

CONSTRUCTION 125 125

TOTAL FUNDING TRN 125 B 125 B

20. F08Q ARCHITECTURAL AND ENGINEERING SUPPORT, STATEWIDE

DESIGN AND CONSTRUCTION OF VARIOUS PROJECTS REQUIRING ARCHITECTURAL OR ENGINEERING CONSULTANT SUPPORT AT AIRPORTS STATEWIDE.

DESIGN 250 250

CONSTRUCTION 250 250

TOTAL FUNDING TRN 500 B 500 B

21. F08S RIAT RECOMMENDATIONS FOR AIRFIELD IMPROVEMENTS, STATEWIDE

CONSTRUCTION FOR RUNWAY INCURSION ACTION TEAM (RIAT) RECOMMENDATIONS FOR AIRFIELD IMPROVEMENTS REQUIRED BY THE FAA AT STATEWIDE AIRPORTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 2,500

TOTAL FUNDING TRN 900 B B

TRN 1,600 N N

 

21.01. F08L AIRFIELD LIGHTS AND SIGN REPLACEMENT, STATEWIDE

CONSTRUCTION OF TAXIWAY LIGHTS, AIRFIELD SIGNS AND RELATED APPURTENANCES AT STATEWIDE AIRPORTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 8,220

TOTAL FUNDING TRN B 2,700 B

TRN N 5,520 N

 

TRN301 - HONOLULU HARBOR

22. J04 IMPROVEMENTS TO FACILITIES AT PIERS 19-29, HONOLULU HARBOR, OAHU

DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AND PIER AREAS INCLUDING VESSEL BERTHING FACILITIES, UTILITIES, ROADWAYS, PAVED PARKING, AND OTHER IMPROVEMENTS.

DESIGN 250

CONSTRUCTION 2,500

TOTAL FUNDING TRN 250 B 2,500 B

[23. J06 SAND ISLAND CONTAINER YARD IMPROVEMENTS, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR IMPROVEMENTS TO THE CONTAINER YARD INCLUDING RECONSTRUCTION OF PAVING, LIGHTING, UTILITIES, AND OTHER IMPROVEMENTS.

CONSTRUCTION 24,500

TOTAL FUNDING TRN 24,500 E E]

 

23. J06 SAND ISLAND CONTAINER YARD IMPROVEMENTS, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR IMPROVEMENTS TO THE CONTAINER YARD INCLUDING RECONSTRUCTION OF PAVING, LIGHTING, UTILITIES, AND OTHER IMPROVEMENTS.

CONSTRUCTION 24,500 11,500

TOTAL FUNDING TRN 24,500 E 11,500 E

 

[24. J26 CRUISE TERMINAL IMPROVEMENTS AT PIER 2, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR RENOVATIONS AND SITE IMPROVEMENTS TO THE EXISTING FACILITIES FOR USE AS A CRUISE TERMINAL, AND OTHER RELATED IMPROVEMENTS.

CONSTRUCTION 10,000

TOTAL FUNDING TRN 10,000 E E]

24. J26 CRUISE TERMINAL IMPROVEMENTS AT PIER 2, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR RENOVATIONS AND SITE IMPROVEMENTS TO THE EXISTING FACILITIES FOR USE AS A CRUISE TERMINAL, AND OTHER RELATED IMPROVEMENTS.

CONSTRUCTION 10,000 10,000

TOTAL FUNDING TRN B 10,000 B

TRN 10,000 E E

 

 

24.01. J07 PIER 51B CONTAINER YARD IMPROVEMENTS, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR IMPROVEMENTS TO THE CONTAINER YARD INCLUDING RECONSTRUCTION OF PAVING, DRAINAGE, UTILITIES, AND OTHER RELATED IMPROVEMENTS.

CONSTRUCTION 20,000

TOTAL FUNDING TRN E 20,000 E

 

24.02. J23 PIERS 19-20 IMPROVEMENTS, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR PIER IMPROVEMENTS INCLUDING THE UPGRADING OF VESSEL BERTHING FACILITIES, AND OTHER RELATED IMPROVEMENTS.

CONSTRUCTION 600

TOTAL FUNDING TRN B 600 B

 

24.03. J34 PIERS 36 TO 38 IMPROVEMENTS, HONOLULU HARBOR, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS AT THE DOMESTIC COMMERCIAL FISHING VILLAGE INCLUDING ENVIRONMENTAL STUDIES AND MITIGATION, UTILITY SERVICES, ROADWAYS, PARKING, AND OTHER RELATED IMPROVEMENTS.

PLANS 100

DESIGN 500

CONSTRUCTION 2,400

TOTAL FUNDING TRN B 3,000 B

 

 

24.04. J35 KEEHI INDUSTRIAL PARK IMPROVEMENTS, HONOLULU HARBOR, OAHU

CONSTRUCTION FOR SITE IMPROVEMENTS TO THE MARITIME-INDUSTRIAL SUBDIVISION INCLUDING ROADWAY UPGRADES, AND OTHER RELATED IMPROVEMENTS.

CONSTRUCTION 450

TOTAL FUNDING TRN B 450 B

 

TRN303 - KALAELOA BARBERS POINT HARBOR

25. J10 KALAELOA-BARBERS POINT HARBOR MODIFICATIONS, OAHU

DESIGN FOR DEEPENING OF THE TURNING BASIN AND CHANNEL MODIFICATIONS AT KALAELOA-BARBERS POINT HARBOR. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 400

TOTAL FUNDING TRN B 400 B

TRN311 - HILO HARBOR

25.01. L06 CONTAINER FACILITY IMPROVEMENTS, HILO HARBOR, HAWAII

DESIGN AND CONSTRUCTION FOR HARBOR IMPROVEMENTS INCLUDING MODIFICATIONS TO PIERS, YARDS, SHEDS, UTILITIES, AND OTHER RELATED IMPROVEMENTS.

DESIGN 75

CONSTRUCTION 500

TOTAL FUNDING TRN B 575 B

 

 

TRN331 - KAHULUI HARBOR

26. M09 BARGE TERMINAL IMPROVEMENTS, KAHULUI HARBOR, MAUI

CONSTRUCTION FOR IMPROVEMENTS TO THE BARGE TERMINAL INCLUDING PIERS, YARDS, SHEDS, AND OTHER IMPROVEMENTS.

CONSTRUCTION 1,500

TOTAL FUNDING TRN 1,500 E E

TRN361 - NAWILIWILI HARBOR

27. K07 NAWILIWILI HARBOR CHANNEL MODIFICATIONS, KAUAI

PLANS FOR DEEPENING, WIDENING, AND OTHER IMPROVEMENTS TO THE ENTRANCE CHANNEL AT NAWILIWILI HARBOR. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 300

TOTAL FUNDING TRN 300 B B

TRN395 - HARBORS ADMINISTRATION

[28. I00 HARBORS DIVISION CAPITAL IMPROVEMENT PROGRAM PROJECTS STAFF COSTS, STATEWIDE

PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S HARBORS DIVISION. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

PLANS 750 750

TOTAL FUNDING TRN 750 B 750 B]

 

28. I00 HARBORS DIVISION CAPITAL IMPROVEMENT PROGRAM PROJECTS STAFF COSTS, STATEWIDE

PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S HARBORS DIVISION. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

PLANS 750 890

TOTAL FUNDING TRN 750 B 890 B

 

29. I01 HARBOR PLANNING, STATEWIDE

PLANS FOR CONTINUING HARBOR STUDIES, RESEARCH, AND ADVANCE PLANNING OF HARBOR AND TERMINAL FACILITIES ON ALL ISLANDS.

PLANS 350 350

TOTAL FUNDING TRN 350 B 350 B

30. I03 MISCELLANEOUS IMPROVEMENTS TO FACILITIES AT NEIGHBOR ISLAND PORTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AREAS, SHEDS, PIERS, UTILITIES, WATER AREAS, AND OTHER FACILITIES.

DESIGN 75 75

CONSTRUCTION 300 300

TOTAL FUNDING TRN 375 B 375 B

 

31. I04 COMMERCIAL HARBORS SEWER SYSTEM IMPROVEMENTS, STATEWIDE

CONSTRUCTION FOR THE PHASE-OUT OF LARGE CAPACITY CESSPOOLS AT COMMERCIAL HARBOR FACILITIES AND OTHER RELATED IMPROVEMENTS.

CONSTRUCTION 1,000

TOTAL FUNDING TRN 1,000 B B

32. I05 MISCELLANEOUS IMPROVEMENTS TO FACILITIES AT OAHU PORTS, OAHU

DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AREAS, SHEDS, PIERS, UTILITIES, WATER AREAS, AND OTHER FACILITIES.

DESIGN 50 50

CONSTRUCTION 250 250

TOTAL FUNDING TRN 300 B 300 B

33. I07 ENVIRONMENTAL REMEDIATION OF COMMERCIAL HARBOR FACILITIES, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION FOR STUDIES AND ENVIRONMENTAL REMEDIATION MEASURES TO PROVIDE A SAFE WORKING ENVIRONMENT FOR MARITIME BUSINESSES AND PERSONNEL WORKING AT HARBOR FACILITIES.

PLANS 500

DESIGN 500

CONSTRUCTION 1,000

TOTAL FUNDING TRN 2,000 B B

 

34. I13 CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

CONSTRUCTION FOR CONSULTANT SERVICES DURING CONSTRUCTION PROJECTS AT HARBOR FACILITIES STATEWIDE.

CONSTRUCTION 1,000

TOTAL FUNDING TRN 1,000 B B

35. I15 SECURITY IMPROVEMENTS AT COMMERCIAL HARBORS, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION OF SECURITY SYSTEM IMPROVEMENTS AT COMMERCIAL HARBOR FACILITIES, STATEWIDE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 500

DESIGN 1,000

CONSTRUCTION 2,750

TOTAL FUNDING TRN 3,250 B B

TRN 1,000 N N

36. I16 INTELLIGENT TRANSPORTATION SYSTEMS STUDIES, STATEWIDE

PLANS FOR STUDIES TO IMPROVE THE INTERMODAL MOVEMENT OF CARGO BETWEEN WATER TRANSPORTATION TERMINALS AND LANDSIDE DESTINATIONS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1,250

TOTAL FUNDING TRN 250 B B

TRN 1,000 N N

 

TRN501 - OAHU HIGHWAYS

37. S269 KAMEHAMEHA HIGHWAY, SOUTH PUNALUU BRIDGE REPLACEMENT, OAHU

CONSTRUCTION FOR REPLACEMENT OF SOUTH PUNALUU BRIDGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 12,250

TOTAL FUNDING TRN 2,450 E E

TRN 9,800 N N

38. S271 INTERSTATE ROUTE H-1 AND MOANALUA FREEWAYS IMPROVEMENTS, PUULOA INTERCHANGE TO KAPIOLANI INTERCHANGE, OAHU

CONSTRUCTION FOR AN ADDITIONAL LANE ON THE H-1 FREEWAY EASTBOUND LANES FROM THE VICINITY OF MIDDLE STREET TO THE VICINITY OF VINEYARD BOULEVARD. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 6,500

TOTAL FUNDING TRN 1,300 E E

TRN 5,200 N N

 

39. S276 KALANIANAOLE HIGHWAY IMPROVEMENTS, RETAINING WALL AT MAKAPUU, OAHU

CONSTRUCTION FOR CONSTRUCTING AND/OR REPAIRING A RETAINING WALL ALONG KALANIANAOLE HIGHWAY IN THE VICINITY OF MAKAPUU POINT, INCLUDING SUBSURFACE INVESTIGATION AND SLOPE PROTECTION. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 6,000

TOTAL FUNDING TRN 1,200 E E

TRN 4,800 N N

40. S280 INTERSTATE ROUTE H-1, PEARL CITY VIADUCT AND WAIMALU VIADUCT IMPROVEMENTS, OAHU

DESIGN FOR THE REPLACING, REPAIRING, AND/OR STRENGTHENING OF THE PEARL CITY AND WAIMALU VIADUCT'S CONCRETE DECK AND OTHER STRUCTURAL COMPONENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1,500

TOTAL FUNDING TRN 300 E E

TRN 1,200 N N

 

41. S287 KAMEHAMEHA HIGHWAY BIKEWAY, VICINITY OF RADFORD DRIVE TO THE ARIZONA MEMORIAL, OAHU

CONSTRUCTION FOR A BIKE LANE ON KAMEHAMEHA HIGHWAY FROM THE VICINITY OF RADFORD DRIVE TO THE ARIZONA MEMORIAL. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 1,250

TOTAL FUNDING TRN 250 E E

TRN 1,000 N N

42. S298 KAMEHAMEHA HIGHWAY, KOKOLOLIO STREAM BRIDGE REPLACEMENT, OAHU

CONSTRUCTION FOR REPLACEMENT OF KOKOLOLIO STREAM BRIDGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 4,100

TOTAL FUNDING TRN 820 E E

TRN 3,280 N N

 

43. S313 INTERSTATE ROUTE H-1, ADDITION AND MODIFICATION OF FREEWAY ACCESS, MAKAKILO TO PALAILAI INTERCHANGES, OAHU

PLANS FOR IMPROVING/MODIFYING THE MAKAKILO AND PALAILAI INTERCHANGES AND CONSTRUCTING A NEW INTERCHANGE (KAPOLEI INTERCHANGE). THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 2,000

TOTAL FUNDING TRN E 400 E

TRN N 1,600 N

44. S314 KAMEHAMEHA HIGHWAY, UPPER POAMOHO STREAM BRIDGE REPLACEMENT, OAHU

DESIGN FOR REPLACEMENT OF A MULTI-GIRDER REINFORCED CONCRETE BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF WAHIAWA. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 2,275

TOTAL FUNDING TRN 455 E E

TRN 1,820 N N

 

45. S315 KAMEHAMEHA HIGHWAY, REHABILITATION OF LAIELOA STREAM BRIDGE, OAHU

DESIGN FOR REHABILITATION OF A CONCRETE SLAB BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF LAIE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 725

TOTAL FUNDING TRN E 145 E

TRN N 580 N

46. S316 KAMEHAMEHA HIGHWAY, KAALAEA STREAM BRIDGE REPLACEMENT, OAHU

DESIGN FOR REPLACEMENT OF A TWO SPAN CONCRETE BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF KAHALUU. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1,000

TOTAL FUNDING TRN E 200 E

TRN N 800 N

47. S317 KAMEHAMEHA HIGHWAY, REHABILITATION OF WAIPILOPILO STREAM BRIDGE, OAHU

DESIGN FOR REHABILITATION OF A CONCRETE TEE-BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF HAUULA. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 600

TOTAL FUNDING TRN E 120 E

TRN N 480 N

 

48. S318 HIGHWAY LIGHTING REPLACEMENT AT VARIOUS LOCATIONS, OAHU

DESIGN AND CONSTRUCTION FOR REPLACING AND/OR UPGRADING THE EXISTING HIGHWAY LIGHTING SYSTEM ON STATE HIGHWAYS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 900

CONSTRUCTION 3,000

TOTAL FUNDING TRN 180 E 600 E

TRN 720 N 2,400 N

49. S319 PEARL CITY, WAIANAE AND KANEOHE BASEYARDS, WASHDOWN RACKS, OAHU

DESIGN FOR INSTALLING WASHDOWN RACKS TO INCLUDE A WATER RECYCLING UNIT, STEAM PRESSURE WASHERS, AND A CONCRETE PAD FOR COMPLIANCE WITH THE DEPARTMENT OF HEALTH REGULATIONS AND THE CLEAN WATER ACT.

DESIGN 250

TOTAL FUNDING TRN 250 E E

 

50. S320 KAMEHAMEHA HIGHWAY WIDENING, LANIKUHANA AVENUE TO KA UKA BOULEVARD, OAHU

PLANS FOR WIDENING KAMEHAMEHA HIGHWAY TO A FOUR-LANE DIVIDED FACILITY WITH SHOULDERS FOR BICYCLES AND DISABLED VEHICLES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1,500

TOTAL FUNDING TRN E 300 E

TRN N 1,200 N

51. S321 INTERSTATE ROUTE H-1 IMPROVEMENTS, EASTBOUND, WARD AVENUE ON-RAMP TO UNIVERSITY INTERCHANGE, OAHU

PLANS FOR IMPROVING EASTBOUND TRAFFIC FLOW ON INTERSTATE ROUTE H-1 FROM WARD AVENUE ON-RAMP TO UNIVERSITY INTERCHANGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1,500

TOTAL FUNDING TRN 300 E E

TRN 1,200 N N

 

52. S322 INTERSTATE ROUTE H-1, WAIAWA INTERCHANGE, WESTBOUND, WAIPAHU OFF-RAMP IMPROVEMENTS, OAHU

DESIGN FOR WIDENING THE WAIPAHU OFF-RAMP FROM ONE TO TWO LANES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 3,000

TOTAL FUNDING TRN E 600 E

TRN N 2,400 N

53. S323 INTERSTATE ROUTE H-1, ADDITIONAL WESTBOUND LANE, VICINITY OF THE PEARL CITY VIADUCT TO PAIWA INTERCHANGE, OAHU

DESIGN FOR CONSTRUCTING AN ADDITIONAL H-1 WESTBOUND LANE THROUGH THE WAIAWA INTERCHANGE AND AN ADDITIONAL LANE TO THE OFF-RAMP AT THE PAIWA INTERCHANGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 2,500

TOTAL FUNDING TRN 500 E E

TRN 2,000 N N

 

54. SP9901 FORT WEAVER ROAD WIDENING, VICINITY OF LAULAUNUI STREET TO VICINITY OF GEIGER ROAD, OAHU

CONSTRUCTION FOR WIDENING OF FORT WEAVER ROAD TO A SIX-LANE FACILITY FROM VICINITY OF LAULAUNUI STREET TO THE VICINITY OF GEIGER ROAD, INCLUDING INSTALLING A TRAFFIC CAMERA SYSTEM FROM WAIPAHU STREET TO PAPIPI ROAD. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 15,000

TOTAL FUNDING TRN 3,000 E E

TRN 12,000 N N

[55. FARRINGTON HIGHWAY IMPROVEMENTS, HAKIMO ROAD TO KAUKAMA ROAD, OAHU

DESIGN AND CONSTRUCTION OF IMPROVEMENTS BETWEEN HAKIMO ROAD AND KAUKAMA ROAD INCLUDING A MEDIAN, PAVED SHOULDERS, SIDEWALKS, UTILITY WORK, AND OTHER IMPROVEMENTS.

DESIGN 2,500

CONSTRUCTION 22,500

TOTAL FUNDING TRN 25,000 E E]

 

55. SP0301 FARRINGTON HIGHWAY IMPROVEMENTS, HAKIMO ROAD TO KAUKAMA ROAD, OAHU

DESIGN AND CONSTRUCTION OF IMPROVEMENTS BETWEEN HAKIMO ROAD AND KAUKAMA ROAD INCLUDING A MEDIAN, PAVED SHOULDERS, SIDEWALKS, UTILITY WORK, AND OTHER IMPROVEMENTS.

DESIGN 2,500

CONSTRUCTION 22,500

TOTAL FUNDING TRN 25,000 E E

 

[56. FRANKLIN D. ROOSEVELT AVENUE EXTENSION, OAHU

LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE EXTENSION OF FRANKLIN D. ROOSEVELT AVENUE TO MEET THE INTERSECTION OF KAMOKILA BLVD/KAPOLEI PARKWAY.

LAND 2,000

DESIGN 275

CONSTRUCTION 1,850

TOTAL FUNDING TRN 4,125 E E]

56. SP0302 FRANKLIN D. ROOSEVELT AVENUE EXTENSION, OAHU

LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE EXTENSION OF FRANKLIN D. ROOSEVELT AVENUE TO MEET THE INTERSECTION OF KAMOKILA BLVD/KAPOLEI PARKWAY.

LAND 2,000

DESIGN 275

CONSTRUCTION 1,850

TOTAL FUNDING TRN 4,125 E E

 

 

[57. KAHEKILI HIGHWAY CONTRAFLOW LANE, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR A CONTRAFLOW LANE FROM HAIKU ROAD TO HUI IWA STREET/VALLEY OF THE TEMPLES.

PLANS 1

DESIGN 49

CONSTRUCTION 450

TOTAL FUNDING TRN 500 E E]

57. SP0303 KAHEKILI HIGHWAY CONTRAFLOW LANE, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR A CONTRAFLOW LANE FROM HAIKU ROAD TO HUI IWA STREET/VALLEY OF THE TEMPLES.

PLANS 1

DESIGN 49

CONSTRUCTION 450

TOTAL FUNDING TRN 500 E E

 

[58. KAMEHAMEHA HIGHWAY IMPROVEMENTS, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR A LEFT TURN FROM KAMEHAMEHA HIGHWAY INTO THE KAHUKU HIGH SCHOOL CAMPUS ENTRANCE.

PLANS 5

DESIGN 20

CONSTRUCTION 75

TOTAL FUNDING TRN 100 E E]

 

58. SP0304 KAMEHAMEHA HIGHWAY IMPROVEMENTS, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR A LEFT TURN FROM KAMEHAMEHA HIGHWAY INTO THE KAHUKU HIGH SCHOOL CAMPUS ENTRANCE.

PLANS 5

DESIGN 20

CONSTRUCTION 75

TOTAL FUNDING TRN 100 E E

 

[59. KAMEHAMEHA HIGHWAY IMPROVEMENTS, OAHU

DESIGN AND CONSTRUCTION FOR CROSSWALKS ON KAMEHAMEHA HIGHWAY NEAR BUS STOPS FROM KAHALUU TO KAWELA BAY.

DESIGN 15

CONSTRUCTION 50

TOTAL FUNDING TRN 65 E E]

59. SP0305 KAMEHAMEHA HIGHWAY IMPROVEMENTS, OAHU

DESIGN AND CONSTRUCTION FOR CROSSWALKS ON KAMEHAMEHA HIGHWAY NEAR BUS STOPS FROM KAHALUU TO KAWELA BAY.

DESIGN 15

CONSTRUCTION 50

TOTAL FUNDING TRN 65 E E

 

 

[60. REGIONAL TRAFFIC STUDY, OAHU

PLANS FOR STUDIES TO DEVELOP ALTERNATIVES TO REDUCE TRAFFIC CONGESTION IN THE AREAS BOUNDED BY WARD AVENUE, LUNALILO H1 FREEWAY, KAPAHULU AVENUE, ALONG KALAKAUA AVENUE, AND ALA MOANA BOULEVARD.

PLANS 200

TOTAL FUNDING TRN 200 E E]

60. SP0306 REGIONAL TRAFFIC STUDY, OAHU

PLANS FOR STUDIES TO DEVELOP ALTERNATIVES TO REDUCE TRAFFIC CONGESTION IN THE AREAS BOUNDED BY WARD AVENUE, LUNALILO H1 FREEWAY, KAPAHULU AVENUE, ALONG KALAKAUA AVENUE, AND ALA MOANA BOULEVARD.

PLANS 200

TOTAL FUNDING TRN 200 E E

 

61. S325 KUNIA ROAD IMPROVEMENTS, VICINITY OF HONOWAI STREET TO VICINITY OF SOUTH KUPUNA LOOP, OAHU

CONSTRUCTION FOR WIDENING KUNIA ROAD, INSTALLING TRAFFIC SIGNALS AT HONOWAI STREET, AND CONSTRUCTING CURB AND GUTTER, CONCRETE SIDEWALK, AND DRAINAGE STRUCTURES.

CONSTRUCTION 2,000

TOTAL FUNDING TRN 2,000 E E

 

61.01. S257 CASTLE HILLS ACCESS ROAD, DRAINAGE IMPROVEMENTS, OAHU

LAND ACQUISITION AND CONSTRUCTION FOR STORM RETENTION STRUCTURES AND EROSION CONTROL TO REPAIR STORM DAMAGE AND EROSION AND CONSTRUCTING CONCRETE SIDEWALKS, WHEELCHAIR RAMPS, AND OTHER RELATED IMPROVEMENTS.

LAND 100

CONSTRUCTION 6,000

TOTAL FUNDING TRN X 6,100 X

 

61.02. S270 TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAYS, OAHU

DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAYS FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS FOR MORE EFFICIENT TRAFFIC FLOW.

DESIGN 100

CONSTRUCTION 1,000

TOTAL FUNDING TRN E 1,100 E

 

 

61.03. S273 KAMEHAMEHA HIGHWAY, INTERSECTION IMPROVEMENTS AT KUILIMA DRIVE, OAHU

LAND ACQUISITION FOR A LEFT TURN LANE ON KAMEHAMEHA HIGHWAY INTO KUILIMA DRIVE, REPLACING O`IO STREAM BRIDGE AND OTHER RELATED IMPROVEMENTS.

LAND 100

TOTAL FUNDING TRN X 100 X

 

61.04. S297 KAMEHAMEHA HIGHWAY, KAWELA STREAM BRIDGE REPLACEMENT, OAHU

CONSTRUCTION FOR REPLACEMENT OF KAWELA STREAM BRIDGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 2,000

TOTAL FUNDING TRN E 400 E

TRN N 1,600 N

 

61.05. S299 KAMEHAMEHA HIGHWAY, NORTH KAHANA STREAM BRIDGE REPLACEMENT, OAHU

CONSTRUCTION FOR REPLACEMENT OF NORTH KAHANA STREAM BRIDGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 5,000

TOTAL FUNDING TRN E 1,000 E

TRN N 4,000 N

 

 

61.06. S307 KAMEHAMEHA HIGHWAY, KALUANUI STREAM BRIDGE REPLACEMENT, OAHU

LAND ACQUISITION FOR REPLACEMENT OF KALUANUI STREAM BRIDGE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REPLACEMENT.

LAND 100

TOTAL FUNDING TRN E 20 E

TRN N 80 N

 

61.07. S324 FARRINGTON HIGHWAY, REPLACEMENT OF MAIPALAOA BRIDGE, OAHU

LAND ACQUISITION AND DESIGN FOR REPLACEMENT OF A PRESTRESSED TEE-BEAM BRIDGE ON FARRINGTON HIGHWAY IN THE VICINITY OF MAILI. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

LAND 350

DESIGN 2,000

TOTAL FUNDING TRN E 470 E

TRN N 1,880 N

 

61.08. S326 KALANIANAOLE HIGHWAY MEDIAN IMPROVEMENTS, VICINITY OF OLOMANA GOLF COURSE, OAHU

DESIGN FOR MEDIAN IMPROVEMENTS, WIDENING OF THE ROADWAY, INSTALLING SIGNS, MARKINGS, AND OTHER INCIDENTAL IMPROVEMENTS IN THE VICINITY OF OLOMANA GOLF COURSE.

DESIGN 350

TOTAL FUNDING TRN E 350 E

 

 

61.09. SP9101 NORTH/SOUTH ROAD, KAPOLEI PARKWAY TO VICINITY OF INTERSTATE ROUTE H-1, OAHU

CONSTRUCTION FOR NORTH/SOUTH ROAD FROM KAPOLEI PARKWAY TO VICINITY OF THE H-1 FREEWAY. IMPROVEMENTS INCLUDE A MULTI-LANE HIGHWAY AND AN INTERCHANGE AT THE H-1 FREEWAY. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 24,000

TOTAL FUNDING TRN E 4,800 E

TRN N 19,200 N

 

61.10. SP9805 KAMEHAMEHA HIGHWAY-KAHEKILI HIGHWAY INTERSECTION IMPROVEMENTS, OAHU

CONSTRUCTION FOR PERMANENT IMPROVEMENTS AT THE KAMEHAMEHA HIGHWAY AND KAHEKILI HIGHWAY INTERSECTION.

CONSTRUCTION 2,250

TOTAL FUNDING TRN E 2,250 E

 

 

TRN511 - HAWAII HIGHWAYS

[62. T11 PUAINAKO STREET WIDENING, KANOELEHUA AVENUE TO KOMOHANA STREET, HAWAII

LAND ACQUISITION AND DESIGN TO WIDEN AND REALIGN PUAINAKO STREET FROM 2 TO 4 LANES FROM KANOELEHUA AVENUE TO KOMOHANA STREET.

LAND 100

DESIGN 350

TOTAL FUNDING TRN 450 E E]

62. T011 PUAINAKO STREET WIDENING, KANOELEHUA AVENUE TO KOMOHANA STREET, HAWAII

LAND ACQUISITION AND DESIGN TO WIDEN AND REALIGN PUAINAKO STREET FROM 2 TO 4 LANES FROM KANOELEHUA AVENUE TO KOMOHANA STREET. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

LAND 100 500

DESIGN 350

TOTAL FUNDING TRN 450 E 100 E

TRN N 400 N

 

 

63. T077 GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, HAWAII

DESIGN AND CONSTRUCTION FOR INSTALLING AND/OR UPGRADING EXISTING GUARDRAILS, END TERMINALS, TRANSITIONS, BRIDGE RAILING, BRIDGE END POSTS AND CRASH ATTENUATOR, AND RECONSTRUCTING AND PAVING SHOULDERS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 100

CONSTRUCTION 1,400 1,400

TOTAL FUNDING TRN 300 E 280 E

TRN 1,200 N 1,120 N

64. T080 KAWAIHAE ROAD, WAIAKA STREAM BRIDGE REPLACEMENT AND REALIGNMENT, HAWAII

DESIGN FOR REPLACING THE EXISTING WAIAKA STREAM BRIDGE, REALIGNING THE BRIDGE APPROACHES, RECONSTRUCTING THE ROUTE 19/ROUTE 250 INTERSECTION, AND INSTALLING SAFETY IMPROVEMENTS.

DESIGN 1,000

TOTAL FUNDING TRN 1,000 X X

 

65. T118 TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES, HAWAII

DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

DESIGN 100

CONSTRUCTION 1,750

TOTAL FUNDING TRN 1,850 E E

66. T133 VOLCANO ROAD DRAINAGE IMPROVEMENTS, KULANI ROAD TO MOUNTAIN VIEW SCHOOL, HAWAII

DESIGN FOR DRAINAGE IMPROVEMENTS, INCLUDING INSTALLING A CONCRETE-LINED DITCH WITH GRATING, AN ASPHALT-LINED DITCH, GUARDRAILS, CULVERTS, AND FENCING.

DESIGN 350

TOTAL FUNDING TRN 350 E E

 

67. T134 HONOKAA BASEYARD IMPROVEMENTS, HAWAII

DESIGN FOR IMPROVEMENTS TO HONOKAA BASEYARD, INCLUDING EXTENDING THE EXISTING GARAGE AND CONSTRUCTING A STORAGE ROOM.

DESIGN 100

TOTAL FUNDING TRN 100 E E

68. T135 MAMALAHOA HIGHWAY DRAINAGE IMPROVEMENTS AT KAWA, HAWAII

DESIGN FOR DRAINAGE IMPROVEMENTS, INCLUDING THE INSTALLATION OF DRAINAGE BOX CULVERTS AND RAISING OF THE ROADWAY.

DESIGN 350

TOTAL FUNDING TRN 350 E E

69. T136 HAWAII BELT ROAD DRAINAGE IMPROVEMENTS, VICINITY OF HAKALAU BRIDGE, HAWAII

DESIGN FOR DRAINAGE IMPROVEMENTS, INCLUDING INSTALLING A DRAINAGE SPILLWAY AND BOX CULVERTS.

DESIGN 350

TOTAL FUNDING TRN E 350 E

 

69.01. T127 KEAAU-PAHOA ROAD SHOULDER LANE CONVERSION, KEAAU BYPASS ROAD TO SHOWER DRIVE, HAWAII

LAND ACQUISITION FOR RECONSTRUCTING AND WIDENING THE EXISTING SHOULDER AND CONSTRUCTING NEW SHOULDERS ON THE INBOUND SIDE OF THE HIGHWAY. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

LAND 300

TOTAL FUNDING TRN E 60 E

TRN N 240 N

 

69.02. T132 VOLCANO ROAD INTERSECTION IMPROVEMENTS AT KULANI ROAD, HAWAII

LAND ACQUISITION FOR CONSTRUCTING LEFT TURN LANES AT THE KULANI ROAD INTERSECTION. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

LAND 500

TOTAL FUNDING TRN E 100 E

TRN N 400 N

 

 

69.03. TP0001 KOHALA MOUNTAIN ROAD REALIGNMENT, VICINITY OF KAHUA RANCH, HAWAII

LAND ACQUISITION AND DESIGN FOR THE REALIGNMENT AND WIDENING OF ROADWAY AT KAHUA RANCH AND THE INSTALLATION OF GUARDRAILS, CULVERTS, SIGNS, AND PAVEMENT MARKINGS.

LAND 100

DESIGN 150

TOTAL FUNDING TRN E 250 E

 

TRN531 - MAUI HIGHWAYS

70. V42 HALEAKALA HIGHWAY WIDENING, PUKALANI BYPASS TO HANA HIGHWAY, MAUI

CONSTRUCTION FOR THE WIDENING OF HALEAKALA HIGHWAY FROM 3 TO 4 LANES BETWEEN PUKALANI BYPASS TO HANA HIGHWAY. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 19,525

TOTAL FUNDING TRN 3,905 E E

TRN 15,620 N N

[71. V74 PAIA BYPASS, MAUI

PLANS AND DESIGN FOR ALTERNATIVE TRAFFIC IMPROVEMENTS IN THE VICINITY OF PAIA TOWN.

PLANS 100

DESIGN 1,500

TOTAL FUNDING TRN 1,600 E E]

 

71. V74 PAIA BYPASS, MAUI

PLANS, DESIGN, AND CONSTRUCTION FOR ALTERNATIVE TRAFFIC IMPROVEMENTS IN THE VICINITY OF PAIA TOWN.

PLANS 100

DESIGN 1,500

CONSTRUCTION 37,500

TOTAL FUNDING TRN 1,600 E 7,500 E

TRN N 30,000 N

 

72. V78 HONOAPIILANI HIGHWAY PASSING LANES, MAALAEA HARBOR TO PUAMANA, MAUI

DESIGN FOR CONSTRUCTING PASSING LANES ON HONOAPIILANI HIGHWAY BETWEEN MAALAEA HARBOR AND PUAMANA.

DESIGN 1,500

TOTAL FUNDING TRN 1,500 X X

73. V93 WAIEHU BEACH ROAD, REHABILITATION OF IAO STREAM BRIDGE, MAUI

LAND ACQUISITION AND DESIGN FOR REHABILITATION OF A CONCRETE TEE-BEAM BRIDGE ON WAIEHU BEACH ROAD IN THE VICINITY OF WAILUKU. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

LAND 300

DESIGN 900

TOTAL FUNDING TRN 180 E 60 E

TRN 720 N 240 N

 

74. V94 HONOAPIILANI HIGHWAY, REPLACEMENT OF HONOLUA BRIDGE, MAUI

DESIGN FOR REPLACEMENT OF A CONCRETE TEE-BEAM BRIDGE ON HONOAPIILANI HIGHWAY IN THE VICINITY OF HONOLUA BAY. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 750

TOTAL FUNDING TRN E 150 E

TRN N 600 N

[75. V95 HALEAKALA HIGHWAY WIDENING AT MILEPOST 0.8, MAUI

DESIGN FOR WIDENING THE HIGHWAY FROM ONE TO TWO LANES, EXTENDING A BOX CULVERT, AND CONSTRUCTING HEADWALLS AND WING WALLS.

DESIGN 60

TOTAL FUNDING TRN 60 E E]

 

75. V95 HALEAKALA HIGHWAY WIDENING AT MILEPOST 0.8, MAUI

LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR WIDENING THE HIGHWAY FROM ONE TO TWO LANES, EXTENDING A BOX CULVERT, AND CONSTRUCTING HEADWALLS AND WING WALLS.

LAND 45

DESIGN 60

CONSTRUCTION 860

TOTAL FUNDING TRN 60 E 905 E

 

76. V073 PUUNENE AVENUE/MOKULELE HIGHWAY WIDENING, KUIHELANI HIGHWAY TO PIILANI HIGHWAY, MAUI

CONSTRUCTION FOR THE WIDENING OF PUUNENE AVENUE AND MOKULELE HIGHWAY FROM TWO TO FOUR LANES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 22,500

TOTAL FUNDING TRN 4,500 E E

TRN 18,000 N N

[77. HONOAPIILANI HIGHWAY WIDENING, LAHAINA TO MAALAEA, MAUI

PLANS FOR THE WIDENING OF HONOAPIILANI HIGHWAY FROM LAHAINA TO MAALAEA.

PLANS 2,500

TOTAL FUNDING TRN 2,500 E E]

 

77. P30013 HONOAPIILANI HIGHWAY WIDENING, LAHAINA TO MAALAEA, MAUI

PLANS FOR THE WIDENING OF HONOAPIILANI HIGHWAY FROM LAHAINA TO MAALAEA.

PLANS 2,500

TOTAL FUNDING TRN 2,500 E E

 

77.01. V051 HONOAPIILANI HIGHWAY WIDENING AND/OR REALIGNMENT, HONOKOWAI TO LAUNIUPOKO, MAUI

CONSTRUCTION FOR A NEW ALIGNMENT OF HONOAPIILANI HIGHWAY FROM LAHAINALUNA ROAD TO THE VICINITY OF THE PROPOSED KEAWE STREET EXTENSION, INCLUDING AN UNDERPASS AT LAHAINALUNA ROAD. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 30,000

TOTAL FUNDING TRN E 6,000 E

TRN N 24,000 N

 

 

77.02. V063 KAHULUI AIRPORT ACCESS ROAD, MAUI

CONSTRUCTION FOR A PORTION OF THE NEW ACCESS ROAD TO KAHULUI AIRPORT FROM THE VICINITY OF PUUNENE AVENUE TO HANA HIGHWAY. INCLUDES AN AT-GRADE INTERSECTION AT HANA HIGHWAY, STRIPING, LANDSCAPING, DRAINAGE, HIGHWAY LIGHTING, UTILITIES, AND OTHER MISCELLANEOUS IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 19,000

TOTAL FUNDING TRN E 3,800 E

TRN N 15,200 N

 

77.03. VP0104 HONOAPIILANI HIGHWAY WIDENING, LAHAINALUNA ROAD TO SOUTH OF FRONT STREET, MAUI

LAND ACQUISITION FOR THE WIDENING OF HONOAPIILANI HIGHWAY FROM TWO TO FOUR LANES FROM THE VICINITY OF LAHAINALUNA ROAD TO THE VICINITY OF FRONT STREET.

LAND 100

TOTAL FUNDING TRN E 100 E

 

 

TRN541 - MOLOKAI HIGHWAYS

78. W08 GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, MOLOKAI

CONSTRUCTION TO BUILD ASPHALT CONCRETE PAVED SHOULDERS AND INSTALLING AND/OR UPGRADING EXISTING GUARDRAIL. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 700

TOTAL FUNDING TRN 140 E E

TRN 560 N N

79. W012 MAUNALOA HIGHWAY SLOPE STABILIZATION AT MP 13 AND MP 14.3, MOLOKAI

DESIGN FOR THE STABILIZATION OF THE EMBANKMENT AT MILE POST 13 AND MILE POST 14.3.

DESIGN 225

TOTAL FUNDING TRN 225 E E

TRN561 - KAUAI HIGHWAYS

80. X51 GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, KAUAI

DESIGN AND CONSTRUCTION FOR INSTALLING AND/OR UPGRADING OF GUARDRAILS, END TERMINALS, TRANSITIONS, BRIDGE RAILINGS, BRIDGE ENDPOSTS, AND CRASH ATTENUATORS; AND RECONSTRUCTING AND PAVING OF SHOULDERS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 200

CONSTRUCTION 1,000 1,000

TOTAL FUNDING TRN 280 E 200 E

TRN 920 N 800 N

 

81. X112 TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAYS, KAUAI

LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

LAND 150

DESIGN 100

CONSTRUCTION 1,200

TOTAL FUNDING TRN 150 E 1,300 E

82. X122 KUHIO HIGHWAY, ROUTE 560, SLOPE PROTECTION, HANALEI HILL, KAUAI

LAND ACQUISITION AND DESIGN FOR CONSTRUCTING SLOPE STABILIZATION AND PROTECTION.

LAND 100

DESIGN 200

TOTAL FUNDING TRN 200 E 100 E

83. X123 WAIMEA CANYON DRIVE/KOKEE ROAD IMPROVEMENTS, MP 0-14, KAUAI

DESIGN FOR CONSTRUCTING PAVED SHOULDERS, INSTALLING GUARDRAIL, AND OTHER IMPROVEMENTS.

DESIGN 100

TOTAL FUNDING TRN E 100 E

 

84. X124 KUHIO HIGHWAY, KAPAIA BRIDGE REPLACEMENT, KAUAI

DESIGN FOR REPLACEMENT OF A MULTI-TEE BEAM REINFORCED CONCRETE GIRDER BRIDGE ON KUHIO HIGHWAY IN THE VICINITY OF KAPAIA. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1,300

TOTAL FUNDING TRN E 260 E

TRN N 1,040 N

85. X125 KAUMUALII HIGHWAY, OMAO BRIDGE REHABILITATION, KAUAI

LAND ACQUISITION AND DESIGN FOR REHABILITATION OF A CONCRETE TEE GIRDER BRIDGE ON KAUMUALII HIGHWAY IN THE VICINITY OF OMAO ROAD. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

LAND 280

DESIGN 1,050

TOTAL FUNDING TRN 210 E 60 E

TRN 840 N 220 N

 

86. X126 POULI ROAD CONNECTOR, KUHIO HIGHWAY TO TEMPORARY KAPAA BYPASS, KAUAI

PLANS FOR CONSTRUCTING A NEW ROAD CONNECTING KUHIO HIGHWAY TO THE TEMPORARY KAPAA BYPASS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 500

TOTAL FUNDING TRN 100 E E

TRN 400 N N

86.01. X118 KUAMOO ROAD, RETAINING WALL IN THE VICINITY OF MP 1.1, KAUAI

LAND ACQUISITION FOR REPLACING AN EXISTING WALL.

LAND 80

TOTAL FUNDING TRN E 80 E

 

86.02. X120 KAUMUALII HIGHWAY, KUHIO HIGHWAY, AND KUAMOO ROAD RETAINING WALLS, KAUAI

LAND ACQUISITION FOR CONSTRUCTING AND/OR RECONSTRUCTING RETAINING WALLS AND OTHER APPURTENANT IMPROVEMENTS AT VARIOUS LOCATIONS.

LAND 100

TOTAL FUNDING TRN E 100 E

 

 

86.03. X121 KUHIO HIGHWAY, REPLACEMENT OF WAINIHA BRIDGES, KAUAI

LAND ACQUISITION FOR REPLACEMENT OF WAINIHA BRIDGES NOS. 1, 2, AND 3.

LAND 225

TOTAL FUNDING TRN E 225 E

 

TRN595 - HIGHWAYS ADMINISTRATION

[87. X91 PEDESTRIAN FACILITIES AND ADA COMPLIANCE AT VARIOUS LOCATIONS, STATEWIDE

DESIGN AND CONSTRUCTION FOR CONSTRUCTING PEDESTRIAN FACILITIES AND INSTALLING AND/OR UPGRADING CURB RAMPS AND BUS STOPS ON STATE HIGHWAYS AND UPGRADING THE HIGHWAYS DIVISION BUILDING FACILITIES TO MEET COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA). THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 100

CONSTRUCTION 450 1,000

TOTAL FUNDING TRN 190 E 200 E

TRN 360 N 800 N]

 

87. X91 PEDESTRIAN FACILITIES AND ADA COMPLIANCE AT VARIOUS LOCATIONS, STATEWIDE

DESIGN AND CONSTRUCTION FOR CONSTRUCTING PEDESTRIAN FACILITIES AND INSTALLING AND/OR UPGRADING CURB RAMPS AND BUS STOPS ON STATE HIGHWAYS AND UPGRADING THE HIGHWAYS DIVISION BUILDING FACILITIES TO MEET COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA). THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 100

CONSTRUCTION 450 30,000

TOTAL FUNDING TRN 190 E 6,000 E

TRN 360 N 24,000 N

 

88. X96 CLOSE-OUT OF HIGHWAY RIGHTS-OF-WAY, STATEWIDE

LAND ACQUISITION FOR COMPLETION OF ACQUISITION OF OUTSTANDING RIGHT-OF-WAY PARCELS ON PREVIOUSLY CONSTRUCTED PROJECTS. ALSO PROVIDES FOR THE TRANSFER OF REAL ESTATE INTERESTS FROM THE STATE TO THE COUNTIES FOR THE IMPLEMENTATION OF THE STATE HIGHWAY SYSTEM.

LAND 200

TOTAL FUNDING TRN 200 E E

 

89. X97 MISCELLANEOUS DRAINAGE IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR DRAINAGE IMPROVEMENTS TO EXISTING HIGHWAY FACILITIES INCLUDING INSTALLATION OF DRAINAGE FACILITIES, CATCH BASINS, GRATED DROP INLETS, LINED SWALES, HEADWALLS, AND CULVERTS AT VARIOUS LOCATIONS.

DESIGN 100

CONSTRUCTION 1,000 1,275

TOTAL FUNDING TRN 1,100 E 1,275 E

90. X98 IMPROVEMENTS TO INTERSECTIONS AND HIGHWAY FACILITIES, STATEWIDE

DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR TRAFFIC SAFETY. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 375

CONSTRUCTION 2,500

TOTAL FUNDING TRN 375 E 500 E

TRN N 2,000 N

 

[91. X99 HIGHWAY PLANNING, STATEWIDE

PLANS FOR ROAD USE, ROAD LIFE, ECONOMIC STUDIES, RESEARCH, ADVANCE PLANNING, AND SCOPING OF FEDERAL AID AND NON-FEDERAL AID HIGHWAY PROJECTS AND PROGRAMS, AND STUDIES REQUIRED BY THE FEDERAL HIGHWAYS ADMINISTRATION. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1,000

TOTAL FUNDING TRN 200 E E

TRN 800 N N]

91. X99 HIGHWAY PLANNING, STATEWIDE

PLANS FOR ROAD USE, ROAD LIFE, ECONOMIC STUDIES, RESEARCH, ADVANCE PLANNING, AND SCOPING OF FEDERAL AID AND NON-FEDERAL AID HIGHWAY PROJECTS AND PROGRAMS, AND STUDIES REQUIRED BY THE FEDERAL HIGHWAYS ADMINISTRATION. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1,000 1,000

TOTAL FUNDING TRN 200 E 200 E

TRN 800 N 800 N

 

 

92. X221 TRAFFIC SIGNAL MODERNIZATION AT VARIOUS LOCATIONS, STATEWIDE

DESIGN AND CONSTRUCTION FOR REPLACING EXISTING TRAFFIC SIGNAL SYSTEMS; PROVIDING INTERCONNECTION OF SIGNALIZED INTERSECTIONS; UPGRADING EXISTING TRAFFIC SIGNAL SYSTEMS TO MEET CURRENT AMERICANS WITH DISABILITIES STANDARDS; AND INSTALLING CLOSE CIRCUIT TELEVISION FOR THE FREEWAY MANAGEMENT SYSTEM. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 300

CONSTRUCTION 1,500 1,500

TOTAL FUNDING TRN 600 E 300 E

TRN 1,200 N 1,200 N

 

93. X225 HIGHWAYS DIVISION CAPITAL IMPROVEMENT PROGRAM STAFF COSTS, STATEWIDE

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S HIGHWAYS DIVISION. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM PROJECT RELATED POSITIONS.

PLANS 1 1

LAND 1 1

DESIGN 1 1

CONSTRUCTION 14,497 14,497

TOTAL FUNDING TRN 8,500 B 8,500 B

TRN 6,000 N 6,000 N

94. X226 CLOSEOUT OF HIGHWAY CONSTRUCTION PROJECTS, STATEWIDE

CONSTRUCTION FOR COMPLETION OF OUTSTANDING CONSTRUCTION PROJECTS FOR POSTING OF AS-BUILT PLANS, OUTSTANDING UTILITY BILLINGS AND PAYMENTS TO OTHERS FOR PROJECT RELATED WORK.

CONSTRUCTION 250 250

TOTAL FUNDING TRN 249 E 249 E

TRN 1 N 1 N

 

95. X227 ROCKFALL PROTECTION/SLOPE STABILIZATION AT VARIOUS LOCATIONS, STATEWIDE

DESIGN FOR ROCKFALL/SLOPE PROTECTION AND SLOPE STABILIZATION MITIGATION MEASURES AT VARIOUS LOCATIONS STATEWIDE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1,000

TOTAL FUNDING TRN 200 E E

TRN 800 N N

96. X230 BIKEWAY IMPROVEMENTS AT VARIOUS LOCATIONS, STATEWIDE

DESIGN TO PROVIDE BICYCLE FACILITIES ON STATE HIGHWAYS. THE FEDERAL LEGISLATION TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) PROVIDES FOR IMPROVING CONDITIONS AND SAFETY FOR THE BICYCLING MODE OF TRAVEL. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1,000

TOTAL FUNDING TRN 200 E E

TRN 800 N N

 

97. X231 HIGHWAYS DIVISION MATERIALS TESTING AND RESEARCH FACILITY RENOVATION, STATEWIDE

DESIGN FOR RENOVATION AND IMPROVEMENTS TO THE HIGHWAYS DIVISION MATERIALS TESTING AND RESEARCH FACILITY.

DESIGN 500

TOTAL FUNDING TRN E 500 E

 

D. ENVIRONMENTAL PROTECTION

HTH840 - ENVIRONMENTAL MANAGEMENT

1. 840401 WASTEWATER TREATMENT REVOLVING FUND FOR POLLUTION CONTROL, STATEWIDE

CONSTRUCTION FOR FUNDS TO MATCH FEDERAL CAPITALIZATION GRANTS FOR WASTEWATER PROJECTS. FUNDS APPROPRIATED TO BE TRANSFERRED TO WATER POLLUTION CONTROL REVOLVING FUND ESTABLISHED PURSUANT TO CHAPTER 342-D, HRS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 12,515 12,515

TOTAL FUNDING HTH 2,086 C 2,086 C

HTH 10,429 N 10,429 N

2. 840402 SAFE DRINKING WATER REVOLVING FUND, STATEWIDE

CONSTRUCTION FOR FUNDS TO MATCH FEDERAL CAPITALIZATION GRANTS TO COMPLY WITH THE SAFE DRINKING WATER ACT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 9,664 9,664

TOTAL FUNDING HTH 1,611 C 1,611 C

HTH 8,053 N 8,053 N

 

LNR906 - LNR - NATURAL AND PHYSICAL ENVIRONMENT

3. 950026 CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF LAND AND NATURAL RESOURCES. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

PLANS 1,750 1,750

TOTAL FUNDING LNR 1,750 C 1,750 C

3.01. J00 ADA PUBLIC ACCESSIBILITY AT DLNR FACILITIES, STATEWIDE

CONSTRUCTION TO PROVIDE PUBLIC ACCESSIBILITY AT DLNR FACILITIES.

CONSTRUCTION 2,500

TOTAL FUNDING LNR C 2,500 C

 

 

E. HEALTH

HTH595 - HEALTH RESOURCES ADMINISTRATION

[1. ST. FRANCIS HEALTHCARE SYSTEM, MAUI

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR ST. FRANCIS HEALTHCARE SYSTEM'S MAUI RENAL DIALYSIS CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 748

EQUIPMENT 1

TOTAL FUNDING HTH 750 C C]

1. P30014 ST. FRANCIS HEALTHCARE SYSTEM, MAUI

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR ST. FRANCIS HEALTHCARE SYSTEM'S MAUI RENAL DIALYSIS CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 748

EQUIPMENT 1

TOTAL FUNDING HTH 750 C C

 

1.01. HANA COMMUNITY HEALTH CENTER, MAUI

CONSTRUCTION FOR THE HANA COMMUNITY HEALTH CENTER'S NUTRITION TRAINING CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

CONSTRUCTION 250

TOTAL FUNDING HTH C 250 C

 

 

1.02. MOLOKAI GENERAL HOSPITAL, MOLOKAI

DESIGN AND CONSTRUCTION FOR COMPLETION OF PHASE II OF CAMPUS REDEVELOPMENT AND RENOVATION OF THE WOMEN'S HEALTH CENTER BUILDING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 319

TOTAL FUNDING HTH C 320 C

 

1.03. POHAI NANI GOOD SAMARITAN, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A WELLNESS CENTER FOR SENIORS ON OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 5

DESIGN 20

CONSTRUCTION 124

EQUIPMENT 1

TOTAL FUNDING HTH C 150 C

 

HTH210 - HAWAII HEALTH SYSTEMS CORPORATION

2. HHSC41 KOHALA HOSPITAL, EMERGENCY ELECTRICAL SYSTEM SWITCH, HAWAII

CONSTRUCTION TO ADD SWITCHGEAR EQUIPMENT TO FACILITATE EMERGENCY POWER DISTRIBUTION.

CONSTRUCTION 100

TOTAL FUNDING HTH 100 C C

 

3. HHSC43 KAUAI VETERANS MEMORIAL HOSPITAL, REROOF MEDICAL SURGICAL, SNF, NURSING ADMINISTRATION, PT, AND OT, KAUAI

DESIGN AND CONSTRUCTION TO REROOF THE MEDICAL SURGICAL, SNF, NURSING ADMINISTRATION, PT, AND OT AREAS.

DESIGN 25

CONSTRUCTION 296

TOTAL FUNDING HTH 321 C C

[4. HAWAII HEALTH SYSTEMS FOUNDATION, HAWAII

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A LONG-TERM CARE VETERANS HOME LOCATED ON THE CAMPUS OF HILO MEDICAL CENTER.

PLANS 1

LAND 1

DESIGN 2,000

CONSTRUCTION 12,998

EQUIPMENT 1,000

TOTAL FUNDING HTH 16,000 C C]

 

4. P30015 HAWAII HEALTH SYSTEMS FOUNDATION, HAWAII

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A LONG-TERM CARE VETERANS HOME LOCATED ON THE CAMPUS OF HILO MEDICAL CENTER.

PLANS 1

LAND 1

DESIGN 2,000

CONSTRUCTION 6,998

EQUIPMENT 1,000

TOTAL FUNDING HTH 10,000 C C

 

[5. KULAMALU SKILLED NURSING/INTERMEDIATE CARE FACILITY, MAUI

LAND ACQUISITION AND DESIGN FOR A SKILLED NURSING/INTERMEDIATE CARE FACILITY.

LAND 2,900

DESIGN 850

TOTAL FUNDING HTH 3,750 C C]

 

5. P30016 KULAMALU SKILLED NURSING/INTERMEDIATE CARE FACILITY, MAUI

LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A SKILLED NURSING/INTERMEDIATE CARE FACILITY.

LAND 2,900 179

DESIGN 850 1,468

CONSTRUCTION 6,477

EQUIPMENT 1

TOTAL FUNDING HTH 3,750 C 8,125 C

 

5.01. HHSC44 HILO MEDICAL CENTER EMERGENCY ROOM RENOVATION, HAWAII

PLANS AND DESIGN TO RENOVATE THE EXISTING EMERGENCY ROOM, EXPANSION, AND NEW RAMP.

PLANS 192

DESIGN 385

TOTAL FUNDING HTH C 577 C

 

5.02. HHSC45 LEAHI HOSPITAL, SUPPORT BUILDING REPAIR, OAHU

DESIGN AND CONSTRUCTION TO REPLACE THE SINCLAIR ROOF AND REPAIR ATHERTON FIRE ESCAPE STAIRWELL.

DESIGN 92

CONSTRUCTION 361

TOTAL FUNDING HTH C 453 C

 

 

5.03. HHSC46 KULA HOSPITAL, FIRE SPRINKLER SYSTEM, MAUI

DESIGN AND CONSTRUCTION FOR A FIRE SPRINKLER SYSTEM AT KULA HOSPITAL.

DESIGN 43

CONSTRUCTION 390

TOTAL FUNDING HTH C 433 C

 

5.04. HHSC47 KULA HOSPITAL, CORRECTION OF ADA DEFICIENCIES, MAUI

DESIGN AND CONSTRUCTION TO CORRECT ADA DEFICIENCIES TO INCLUDE RAMPS, BATHROOMS, ACCESS, RAILS, SIGNAGE, STAIRS, ETC.

DESIGN 16

CONSTRUCTION 264

TOTAL FUNDING HTH C 280 C

 

5.05. HHSC48 LEAHI HOSPITAL, LIFE SAFETY AND ADA RENOVATIONS, OAHU

DESIGN AND CONSTRUCTION TO BRING THE FACILITY UP TO CODE ON LIFE SAFETY AND ADA REQUIREMENTS.

DESIGN 34

CONSTRUCTION 160

TOTAL FUNDING HTH C 194 C

 

 

5.06. HHSC49 MALUHIA HOSPITAL, KITCHEN EQUIPMENT, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT TO INSTALL NEW KITCHEN APPLIANCES TO REDUCE RISK OF INFECTION THROUGH FOOD SERVICES/PROCESSING.

PLANS 3

DESIGN 9

CONSTRUCTION 50

EQUIPMENT 75

TOTAL FUNDING HTH C 137 C

 

 

F. SOCIAL SERVICES

HMS501 - YOUTH SERVICES ADMINISTRATION

[1. HALE KIPA, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE DEVELOPMENT OF THE HALE KIPA COMPREHENSIVE PROGRAM SUPPORT CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 50

LAND 200

DESIGN 200

CONSTRUCTION 200

TOTAL FUNDING HMS 650 C C]

1. P30017 HALE KIPA, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE DEVELOPMENT OF THE HALE KIPA COMPREHENSIVE PROGRAM SUPPORT CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 50

LAND 200

DESIGN 200

CONSTRUCTION 200

TOTAL FUNDING HMS 650 C C

 

 

DEF112 - SERVICES TO VETERANS

2. OVS004 AIEA BAY PUMPHOUSE PROPERTY ENVIRONMENTAL REMEDIATION, OAHU

DESIGN FOR REMEDIATION ACTIONS FOR ENVIRONMENTAL CLEANUP. SITE ASSESSMENT WILL INCLUDE A PRIORITY FOCUS ON THE MERCURY CONTAMINATION ISSUE. MAY ALSO INCLUDE MISCELLANEOUS WORK RELATING TO SITE CLEANUP, SECURITY OF PROPERTY, AND VARIOUS CLOSE OUT ACTIONS REQUIRED BY OTHER STATE AND FEDERAL GOVERNMENT AGENCIES.

DESIGN 150

TOTAL FUNDING DEF 150 C C

HMS601 - ADULT AND COMMUNITY CARE SERVICES BRANCH

[3. PALOLO CHINESE HOME, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT TO CONSTRUCT THE PALOLO CHINESE HOME'S FOOD SERVICE COMPLEX, WELLNESS CENTER, AND SUPPORTING INFRASTRUCTURE. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 498

EQUIPMENT 1

TOTAL FUNDING HMS 500 C C]

 

3. P30018 PALOLO CHINESE HOME, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT TO CONSTRUCT THE PALOLO CHINESE HOME'S FOOD SERVICE COMPLEX, WELLNESS CENTER, AND SUPPORTING INFRASTRUCTURE. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 1

CONSTRUCTION 498

EQUIPMENT 1

TOTAL FUNDING HMS 500 C C

 

HMS220 - RENTAL HOUSING SERVICES

3.01. RH006 LARGE CAPACITY CESSPOOL CONVERSIONS FOR FEDERAL AND STATE PROJECTS, HAWAII

DESIGN AND CONSTRUCTION TO CLOSE AND UPGRADE A TOTAL OF 39 LARGE CAPACITY CESSPOOLS ON THE ISLAND OF HAWAII.

DESIGN 300

CONSTRUCTION 1,700

TOTAL FUNDING HMS C 2,000 C

 

3.02. RH004A RENOVATION OF STATE OWNED HOUSING PROJECTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE RENOVATION, REPAIR, AND MODERNIZATION OF STATE OWNED HOUSING PROJECTS.

DESIGN 200

CONSTRUCTION 1,800

TOTAL FUNDING HMS C 2,000 C

 

 

HMS229 - HCDCH ADMINISTRATION

3.03. RH005 REROOF AND SPALL REPAIR AT POHULANI ELDERLY HOUSING, OAHU

DESIGN AND CONSTRUCTION FOR THE REROOFING AND SPALL REPAIR AT POHULANI ELDERLY HOUSING.

DESIGN 60

CONSTRUCTION 600

TOTAL FUNDING HMS C 660 C

 

HHL602 - PLANNING, DEVELOPMENT, MANAGEMENT, AND GENERAL SUPPORT FOR HAWAIIAN HOMESTEADS

[4. WAIMANALO HAWAIIAN HOMES ASSOCIATION, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR A NEW HALAU BUILDING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 1

DESIGN 1

CONSTRUCTION 598

TOTAL FUNDING HHL 600 C C]

4. P30019 WAIMANALO HAWAIIAN HOMES ASSOCIATION, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR A NEW HALAU BUILDING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 1

DESIGN 1

CONSTRUCTION 598

TOTAL FUNDING HHL 600 C C

 

 

HMS901 - GENERAL SUPPORT FOR SOCIAL SERVICES

4.01. YWCA OF OAHU, OAHU

CONSTRUCTION FOR RENOVATIONS TO THE FERNHURST TRANSITIONAL RESIDENCE FOR WOMEN AND CHILDREN. THIS PROJECT QUALIFIES FOR A GRANT, PURSUANT TO CHAPTER 42F, HRS.

CONSTRUCTION 500

TOTAL FUNDING HMS C 500 C

 

 

G. FORMAL EDUCATION

EDN100 - SCHOOL-BASED BUDGETING

1. 101 LUMP SUM CIP - RELOCATION OR CONSTRUCTION OF TEMPORARY FACILITIES, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR RELOCATION OR CONSTRUCTION OF TEMPORARY FACILITIES EACH SCHOOL YEAR TO MEET ENROLLMENT SHIFTS AMONG SCHOOLS, PROGRAM DEMANDS, UNFORESEEN EMERGENCIES, AND TO PROVIDE TEMPORARY FACILITIES AND/OR TRAILER PORTABLES WHILE SCHOOLS ARE BEING PLANNED AND/OR UNDER CONSTRUCTION/REPAIR; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 200 200

CONSTRUCTION 3,600 3,600

EQUIPMENT 200 200

TOTAL FUNDING AGS 4,000 B 4,000 B

2. 002 LUMP SUM CIP - MINOR RENOVATIONS TO BUILDINGS AND SCHOOL SITES, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR MINOR ADDITIONS, RENOVATIONS, AND IMPROVEMENTS TO BUILDINGS AND SCHOOL SITES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 150 150

CONSTRUCTION 1,700 1,700

EQUIPMENT 150 150

TOTAL FUNDING AGS 2,000 B 2,000 B

 

3. 003 LUMP SUM CIP - MASTER PLANS, SITE STUDIES, AND MINOR LAND ACQUISITIONS, STATEWIDE

PLANS AND LAND ACQUISITION FOR MASTER PLANNING, SITE SELECTION, PRE-LAND ACQUISITION STUDIES TO MEET FUTURE AND UNFORESEEN NEEDS AND CIP ASSISTANCE FROM DAGS IN PROVIDING COST ESTIMATES FOR BUDGETING AND EXPENDITURE PLANNING.

PLANS 245 245

LAND 5 5

TOTAL FUNDING AGS 250 B 250 B

4. 004 LUMP SUM CIP - RENOVATIONS FOR NOISE AND HEAT ABATEMENT, STATEWIDE

DESIGN AND CONSTRUCTION FOR CORRECTIVE MEASURES TO SCHOOLS AFFECTED BY EXCESSIVE NOISE, VENTILATION, AND/OR HIGH TEMPERATURE PROBLEMS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 200 200

CONSTRUCTION 800 800

TOTAL FUNDING AGS 1,000 B 1,000 B

 

5. 005 LUMP SUM CIP - FIRE PROTECTION, CODE VIOLATIONS, AND ALARM SYSTEMS, STATEWIDE

DESIGN AND CONSTRUCTION FOR FIRE PROTECTION SYSTEMS AND/OR CORRECTIVE MEASURES TO ADDRESS FIRE CODE VIOLATIONS TO MEET COUNTY FIRE PROTECTION STANDARDS AND/OR FIRE CODE VIOLATIONS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100 100

CONSTRUCTION 400 400

TOTAL FUNDING AGS 500 B 500 B

6. 006 LUMP SUM CIP - ARCHITECTURAL BARRIERS AND SPECIAL EDUCATION CLASSROOMS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE PROVISION OF RAMPS, ELEVATORS, AND OTHER CORRECTIVE MEASURES FOR ACCESSIBILITY OF SCHOOL FACILITIES TO PHYSICALLY CHALLENGED PERSONS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 300 300

CONSTRUCTION 1,700 1,700

TOTAL FUNDING AGS 2,000 B 2,000 B

 

7. 007071 LUMP SUM CIP - PUBLIC ACCOMMODATIONS TRANSITION PLANS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE PROVISIONS OF RAMPS, ELEVATORS, AND OTHER CORRECTIVE MEASURES FOR SCHOOL FACILITIES TYPICALLY VISITED BY THE PUBLIC; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 250 250

CONSTRUCTION 500 500

TOTAL FUNDING AGS 750 B 750 B

8. 007 LUMP SUM CIP - SPECIAL EDUCATION CLASSROOMS, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION AND/OR CONSTRUCTION OF CLASSROOMS FOR SPECIAL EDUCATION; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100 100

CONSTRUCTION 300 300

EQUIPMENT 100 100

TOTAL FUNDING AGS 500 B 500 B

 

[9. 008 LUMP SUM CIP - ASBESTOS REMOVAL AND/OR LEAD PAINT REMOVAL IN SCHOOL BUILDINGS, STATEWIDE

DESIGN AND CONSTRUCTION FOR CORRECTION, IMPROVEMENT, AND RENOVATION TO ALL EXISTING SCHOOL BUILDINGS, STATEWIDE. PROJECT TO INCLUDE THE REMOVAL OF ASBESTOS AND/OR LEAD PAINT.

DESIGN 50 50

CONSTRUCTION 450 450

TOTAL FUNDING AGS 500 B 500 B]

9. 008 LUMP SUM CIP - ASBESTOS REMOVAL AND/OR LEAD PAINT REMOVAL IN SCHOOL BUILDINGS, STATEWIDE

DESIGN AND CONSTRUCTION FOR CORRECTION, IMPROVEMENT, AND RENOVATION TO ALL EXISTING SCHOOL BUILDINGS, STATEWIDE. PROJECT TO INCLUDE THE REMOVAL OF ASBESTOS AND/OR LEAD PAINT.

DESIGN 50 100

CONSTRUCTION 450 900

TOTAL FUNDING AGS 500 B 1,000 B

 

 

10. 009 LUMP SUM CIP - REQUIREMENTS FOR HEALTH AND SAFETY/LAWS AND ORDINANCES, STATEWIDE

DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO SCHOOL FACILITIES AND GROUNDS TO MEET HEALTH, SAFETY REQUIREMENTS/LAWS AND ORDINANCES AND/OR COUNTY REQUIREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100 100

CONSTRUCTION 400 400

TOTAL FUNDING AGS 500 B 500 B

11. 010 LUMP SUM CIP - PROJECT ADJUSTMENT FUND, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A CONTINGENCY FUND FOR PROJECT ADJUSTMENT PURPOSES SUBJECT TO THE PROVISIONS OF THE APPROPRIATIONS ACT. OTHER DEPARTMENT OF EDUCATION PROJECTS WITHIN THIS ACT WITH UNREQUIRED BALANCES MAY BE TRANSFERRED INTO THIS PROJECT.

DESIGN 200 200

CONSTRUCTION 700 700

EQUIPMENT 100 100

TOTAL FUNDING AGS 1,000 B 1,000 B

 

12. 011 LUMP SUM CIP - TELECOMMUNICATIONS AND POWER INFRASTRUCTURE, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR TELECOMMUNICATIONS AND POWER INFRASTRUCTURE IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 250 250

CONSTRUCTION 1,700 1,700

EQUIPMENT 50 50

TOTAL FUNDING AGS 2,000 B 2,000 B

[13. 014 LUMP SUM CIP - CAPITAL IMPROVEMENTS PROGRAM COSTS, STATEWIDE

PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF EDUCATION.

PLANS 250 250

TOTAL FUNDING EDN 250 B 250 B]

 

13. 014 LUMP SUM CIP - CAPITAL IMPROVEMENTS PROGRAM COSTS, STATEWIDE

PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF EDUCATION. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CIP RELATED POSITIONS.

PLANS 250 250

TOTAL FUNDING EDN 250 B 250 B

 

14. 060 LUMP SUM CIP - STATE/DISTRICT RELOCATING AND IMPROVEMENTS, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR STATE AND DISTRICT OFFICE IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25 25

CONSTRUCTION 50 50

EQUIPMENT 25 25

TOTAL FUNDING AGS 100 B 100 B

15. 014050 LUMP SUM CIP - ELECTRICAL UPGRADES, STATEWIDE

DESIGN AND CONSTRUCTION FOR ELECTRICAL SYSTEM UPGRADES AT SCHOOLS, STATEWIDE; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 400 400

CONSTRUCTION 1,100 1,100

TOTAL FUNDING AGS 1,500 B 1,500 B

 

16. P00026 LUMP SUM CIP - PLAYGROUND EQUIPMENT, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT TO REPLACE PLAYGROUND EQUIPMENT WHICH DO NOT MEET U.S. CONSUMER PRODUCTS SAFETY COMMISSION SAFETY STANDARDS, PROVIDE APPROPRIATE PADDING IN THE AREA OF PLAYGROUND EQUIPMENT, PROVIDE ACCESSIBILITY TO THE PLAY AREAS/EQUIPMENT PER AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG); GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100 100

CONSTRUCTION 500 500

EQUIPMENT 150 150

TOTAL FUNDING AGS 750 B 750 B

17. 009002 LUMP SUM CIP - PLAYGROUND EQUIPMENT ACCESSIBILITY, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT TO REPLACE PLAYGROUND EQUIPMENT WHICH DO NOT MEET SAFETY STANDARDS, PROVIDE APPROPRIATE PADDING IN THE AREA OF PLAYGROUND EQUIPMENT, PROVIDE ACCESSIBILITY TO THE PLAY AREAS/EQUIPMENT PER AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG); GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 40 40

CONSTRUCTION 260 260

EQUIPMENT 200 200

TOTAL FUNDING AGS 500 B 500 B

 

[18. 018 LUMP SUM CIP - ELIMINATION OF CESSPOOLS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE ELIMINATION OF CESSPOOLS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 250 250

CONSTRUCTION 950 950

TOTAL FUNDING AGS 1,200 B 1,200 B]

18. 018 LUMP SUM CIP - ELIMINATION OF CESSPOOLS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE ELIMINATION OF CESSPOOLS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 250 600

CONSTRUCTION 950 2,400

TOTAL FUNDING AGS 1,200 B 3,000 B

 

19. 019 LUMP SUM CIP - GENDER EQUITY, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR GENDER EQUITY PROJECTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 300 300

CONSTRUCTION 1,500 1,500

EQUIPMENT 200 200

TOTAL FUNDING AGS 2,000 B 2,000 B

 

19.01. LUMP SUM CIP - SCHOOL BUILDING IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC SCHOOL FACILITIES, STATEWIDE. MAY INCLUDE PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES, ROOFING, AIR CONDITIONING, PAINTING, PLUMBING, AND OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC SCHOOL FACILITIES.

DESIGN 17,000

CONSTRUCTION 83,000

TOTAL FUNDING AGS B 100,000 B

 

19.02. AIEA INTERMEDIATE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR PORTABLE CLASSROOM BUILDINGS TO PROVIDE APPROPRIATE LEARNING FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 40

CONSTRUCTION 230

TOTAL FUNDING AGS B 270 B

 

[20. CAMPBELL HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE IMPROVEMENT AND UPGRADE OF THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 150

CONSTRUCTION 1,000

TOTAL FUNDING AGS 1,150 B B]

 

20. P30020 CAMPBELL HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE IMPROVEMENT AND UPGRADE OF THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 150

CONSTRUCTION 1,000

TOTAL FUNDING AGS 1,150 B B

 

20.01. EWA BEACH ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A SIX CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 360

CONSTRUCTION 4,500

EQUIPMENT 40

TOTAL FUNDING AGS B 4,900 B

 

[21. FERN ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO REPLACE THE ROOFS OF BUILDINGS J, B, AND C; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 35

CONSTRUCTION 200

TOTAL FUNDING AGS 235 B B]

 

21. P30021 FERN ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO REPLACE THE ROOFS OF BUILDINGS J, B, AND C; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 35

CONSTRUCTION 200

TOTAL FUNDING AGS 235 B B

 

[22. 402051 HANA HIGH AND ELEMENTARY SCHOOL, MAUI

CONSTRUCTION AND EQUIPMENT FOR A SIX-CLASSROOM BUILDING AT HANA HIGH AND ELEMENTARY SCHOOL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 2,900

EQUIPMENT 100

TOTAL FUNDING AGS 3,000 B B]

22. 402051 HANA HIGH AND ELEMENTARY SCHOOL, MAUI

CONSTRUCTION AND EQUIPMENT FOR A SIX-CLASSROOM BUILDING AT HANA HIGH AND ELEMENTARY SCHOOL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 2,900 2,000

EQUIPMENT 100

TOTAL FUNDING AGS 3,000 B 2,000 B

 

 

[23. HEEIA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE EXPANSION OF THE PARKING LOT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 30

CONSTRUCTION 150

TOTAL FUNDING AGS 180 B B]

23. P30022 HEEIA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE EXPANSION OF THE PARKING LOT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 30

CONSTRUCTION 150

TOTAL FUNDING AGS 180 B B

 

[24. HIGHLANDS INTERMEDIATE SCHOOL, OAHU

CONSTRUCTION FOR THE EXTENSION OF THE MUSIC BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 704

TOTAL FUNDING AGS 704 B B]

 

24. P10030 HIGHLANDS INTERMEDIATE SCHOOL, OAHU

CONSTRUCTION FOR THE EXTENSION OF THE MUSIC BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 704

TOTAL FUNDING AGS 704 B B

 

24.01. HILO HIGH SCHOOL, HAWAII

PLANS AND DESIGN FOR A GYMNASIUM TO INCLUDE CLASSROOMS; DEMOLITION OF EXISTING STRUCTURE AND PORTABLE; REMOVAL OF ASBESTOS AND LEAD PAINT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1,000

DESIGN 1,000

TOTAL FUNDING AGS B 2,000 B

 

[25. HONOWAI ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE INSTALLATION OF AIR CONDITIONING FOR THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 50

EQUIPMENT 125

TOTAL FUNDING AGS 200 B B]

 

25. P30024 HONOWAI ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE INSTALLATION OF AIR CONDITIONING FOR THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 50

EQUIPMENT 125

TOTAL FUNDING AGS 200 B B

 

25.01. ILIMA INTERMEDIATE SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO UPGRADE THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 500

TOTAL FUNDING AGS B 550 B

 

25.02. KAAAWA ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A NEW LIBRARY; RENOVATE TEMPORARY LIBRARY TO GENERAL CLASSROOMS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 300

CONSTRUCTION 2,350

EQUIPMENT 100

TOTAL FUNDING AGS B 2,750 B

 

 

25.03. KAAHUMANU ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR A TEACHERS' PARKING LOT ALONG PIIKOI STREET WITH FENCE ENCLOSURES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 35

CONSTRUCTION 215

TOTAL FUNDING AGS B 250 B

 

[26. KAHUKU HIGH AND INTERMEDIATE SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR RENOVATIONS AND IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 350

EQUIPMENT 25

TOTAL FUNDING AGS 400 B B]

26. P30025 KAHUKU HIGH AND INTERMEDIATE SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR RENOVATIONS AND IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 350

EQUIPMENT 25

TOTAL FUNDING AGS 400 B B

 

 

26.01. KAHUKU HIGH SCHOOL, OAHU

DESIGN FOR A NEW ATHLETIC FIELD; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 400

TOTAL FUNDING AGS B 400 B

 

[27. KAIMUKI HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR A SCIENCE CENTER IN BUILDING G; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 105

TOTAL FUNDING AGS 130 B B]

27. P30026 KAIMUKI HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR A SCIENCE CENTER IN BUILDING G; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 105

TOTAL FUNDING AGS 130 B B

 

 

[28. KAIMUKI HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR ATHLETIC FIELD RESTROOM FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 33

CONSTRUCTION 300

TOTAL FUNDING AGS 333 B B]

28. P30027 KAIMUKI HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR ATHLETIC FIELD RESTROOM FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 33

CONSTRUCTION 300

TOTAL FUNDING AGS 333 B B

 

[29. KALIHI-WAENA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO REROOF BUILDINGS A AND B; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 260

TOTAL FUNDING AGS 285 B B]

 

29. P30028 KALIHI-WAENA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO REROOF BUILDINGS A AND B; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 260

TOTAL FUNDING AGS 285 B B

 

[30. KALIHI-WAENA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO RENOVATE AND IMPROVE BUILDING H FOR THE RELOCATION OF THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 250

TOTAL FUNDING AGS 300 B B]

30. P30029 KALIHI-WAENA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO RENOVATE AND IMPROVE BUILDING H FOR THE RELOCATION OF THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 250

TOTAL FUNDING AGS 300 B B

 

 

30.01. KAPAA ELEMENTARY SCHOOL, KAUAI

DESIGN FOR A NEW LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 250

TOTAL FUNDING AGS B 250 B

 

[31. KAPALAMA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR ADDITIONAL PARKING STALLS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 20

CONSTRUCTION 130

TOTAL FUNDING AGS 150 B B]

31. P30030 KAPALAMA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR ADDITIONAL PARKING STALLS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 20

CONSTRUCTION 130

TOTAL FUNDING AGS 150 B B

 

 

31.01. KAPALAMA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO RESURFACE THE BASKETBALL COURT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 10

CONSTRUCTION 65

TOTAL FUNDING AGS B 75 B

 

[32. KAWANANAKOA MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO UPGRADE THE ELECTRICAL AND PLUMBING SYSTEMS IN THE AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100

CONSTRUCTION 500

TOTAL FUNDING AGS 600 B B]

32. P02036 KAWANANAKOA MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO UPGRADE THE ELECTRICAL AND PLUMBING SYSTEMS IN THE AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100

CONSTRUCTION 500

TOTAL FUNDING AGS 600 B B

 

 

[33. KAWANANAKOA MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE RENOVATION, IMPROVEMENT, AND/OR EXPANSION OF THE MUSIC BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 300

TOTAL FUNDING AGS 350 B B]

33. P10035 KAWANANAKOA MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE RENOVATION, IMPROVEMENT, AND/OR EXPANSION OF THE MUSIC BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 300

TOTAL FUNDING AGS 350 B B

 

33.01. KAWANANAKOA MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE RENOVATION OF THE AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 700

TOTAL FUNDING AGS B 750 B

 

 

33.02. 390551 KEALAKEHE INTERMEDIATE SCHOOL, HAWAII

DESIGN AND CONSTRUCTION FOR A NEW ADMINISTRATION/LIBRARY BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 575

TOTAL FUNDING AGS B 600 B

 

33.03. KIHEI HIGH SCHOOL, MAUI

PLANS AND DESIGN FOR A NEW PUBLIC HIGH SCHOOL IN KIHEI, MAUI; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 500

DESIGN 5,000

TOTAL FUNDING AGS B 5,500 B

 

[34. KILAUEA ELEMENTARY SCHOOL, KAUAI

PLANS AND DESIGN FOR A CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1

DESIGN 299

TOTAL FUNDING AGS 300 B B]

 

34. 459B51 KILAUEA ELEMENTARY SCHOOL, KAUAI

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1

DESIGN 299

CONSTRUCTION 2,000

EQUIPMENT 100

TOTAL FUNDING AGS 300 B 2,100 B

 

[35. LAHAINALUNA HIGH SCHOOL, MAUI

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AN ATHLETIC LOCKER ROOM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 1,998

EQUIPMENT 1

TOTAL FUNDING AGS 2,000 B B]

35. P30034 LAHAINALUNA HIGH SCHOOL, MAUI

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AN ATHLETIC LOCKER ROOM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 1,998

EQUIPMENT 1

TOTAL FUNDING AGS 2,000 B B

 

 

[36. LEILEHUA HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE CONVERSION OF ROOM FIFTY-THREE INTO A TECHNOLOGY CENTER; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 225

EQUIPMENT 1

TOTAL FUNDING AGS 251 B B]

36. P30035 LEILEHUA HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE CONVERSION OF ROOM FIFTY-THREE INTO A TECHNOLOGY CENTER; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 25

CONSTRUCTION 225

EQUIPMENT 1

TOTAL FUNDING AGS 251 B B

 

[37. LEILEHUA HIGH SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 999

EQUIPMENT 1

TOTAL FUNDING AGS 1,000 B B]

 

37. 214051 LEILEHUA HIGH SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 999

EQUIPMENT 1

TOTAL FUNDING AGS 1,000 B B

 

37.01. LINCOLN ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE INSTALLATION OF AIR CONDITIONING IN BUILDINGS A, B, D, E, F, AND G; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100

CONSTRUCTION 580

EQUIPMENT 20

TOTAL FUNDING AGS B 700 B

 

[38. MANOA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO UPGRADE THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 250

TOTAL FUNDING AGS 300 B B]

 

38. P30037 MANOA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO UPGRADE THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 250

TOTAL FUNDING AGS 300 B B

 

39. 851100 MAUI LANI ELEMENTARY SCHOOL, MAUI

LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE FIRST AND SECOND INCREMENT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

LAND 1

DESIGN 1,000

CONSTRUCTION 11,500 11,500

EQUIPMENT 499 500

TOTAL FUNDING AGS 13,000 B 12,000 B

39.01. MAUKA LANI ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 350

CONSTRUCTION 4,500

EQUIPMENT 60

TOTAL FUNDING AGS B 4,910 B

 

 

[40. MCKINLEY HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE EXPANSION OF THE CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 65

CONSTRUCTION 250

EQUIPMENT 5

TOTAL FUNDING AGS 320 B B]

40. P30038 MCKINLEY HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE EXPANSION OF THE CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 65

CONSTRUCTION 250

EQUIPMENT 5

TOTAL FUNDING AGS 320 B B

 

[41. 216051 MILILANI HIGH SCHOOL, OAHU

DESIGN FOR A TEN CLASSROOM BUILDING AT MILILANI HIGH SCHOOL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 360

TOTAL FUNDING AGS 360 B B]

 

41. 216051 MILILANI HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A TEN CLASSROOM BUILDING AT MILILANI HIGH SCHOOL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 360

TOTAL FUNDING AGS 360 B B

 

[42. MOANALUA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION OF AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 750

TOTAL FUNDING AGS 800 B B]

42. P30039 MOANALUA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION OF AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 750

TOTAL FUNDING AGS 800 B B

 

 

42.01. MOANALUA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO EXPAND THE EXISTING LIBRARY TO ACCOMMODATE A VIDEO/MEDIA PRODUCTION CENTER FOR STUDENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 250

TOTAL FUNDING AGS B 300 B

 

42.02. MOANALUA HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE EXPANSION AND/OR RENOVATION OF EXISTING LOCKER ROOMS; INSTALLATION OF STUDENT BATHROOMS, WATER FOUNTAINS, AND SINKS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 40

CONSTRUCTION 241

TOTAL FUNDING AGS B 281 B

 

42.03. MOANALUA INTERMEDIATE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE UPGRADE OF THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 54

CONSTRUCTION 100

TOTAL FUNDING AGS B 154 B

 

 

[43. 263151 NANAKULI HIGH SCHOOL, OAHU

DESIGN FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 300

TOTAL FUNDING AGS 300 B B]

43. 263151 NANAKULI HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 300

TOTAL FUNDING AGS 300 B B

 

43.01. NANAKULI HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AN ATHLETIC COMPLEX; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 850

EQUIPMENT 1

TOTAL FUNDING AGS B 852 B

 

 

[44. NANAKULI IV ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE INCREMENT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 100

EQUIPMENT 349

TOTAL FUNDING AGS 450 B B]

44. 823100 NANAKULI IV ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE INCREMENT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 100

EQUIPMENT 349

TOTAL FUNDING AGS 450 B B

 

44.01. NOELANI ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE UPGRADE OF THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 250

TOTAL FUNDING AGS B 300 B

 

 

44.02. NUUANU ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO REROOF BUILDINGS B, E, D, AND I; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 44

CONSTRUCTION 100

TOTAL FUNDING AGS B 144 B

 

[45. 293100 OCEAN POINTE ELEMENTARY SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR FIRST AND SECOND INCREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 12,500

EQUIPMENT 500

TOTAL FUNDING AGS B 13,000 B]

45. 293100 OCEAN POINTE ELEMENTARY SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR FIRST AND SECOND INCREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 18,500

EQUIPMENT 500

TOTAL FUNDING AGS B 19,000 B

 

 

46. 383151 PAHOA HIGH SCHOOL, HAWAII

DESIGN FOR A GYMNASIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 650

TOTAL FUNDING AGS 650 B B

[47. PEARL CITY ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AIR CONDITIONING OF BUILDING C; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 75

CONSTRUCTION 400

EQUIPMENT 25

TOTAL FUNDING AGS 500 B B]

47. P30041 PEARL CITY ELEMENTARY SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR AIR CONDITIONING OF BUILDING C; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 75

CONSTRUCTION 400

EQUIPMENT 25

TOTAL FUNDING AGS 500 B B

 

 

47.01. PEARL CITY HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR A WEIGHT TRAINING ROOM AND ATHLETIC TRAINING ROOM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 999

TOTAL FUNDING AGS B 1,000 B

 

47.02. PEARL CITY HIGHLANDS ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE UPGRADE OF THE ELECTRICAL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 85

CONSTRUCTION 500

TOTAL FUNDING AGS B 585 B

 

[48. PEARLRIDGE ELEMENTARY SCHOOL, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR THE EXPANSION OF THE CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1

DESIGN 150

CONSTRUCTION 799

TOTAL FUNDING AGS 950 B B]

 

48. P30042 PEARLRIDGE ELEMENTARY SCHOOL, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR THE EXPANSION OF THE CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1

DESIGN 150

CONSTRUCTION 799

TOTAL FUNDING AGS 950 B B

 

48.01. RADFORD HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A MULTI-PURPOSE CLASSROOM TO EXPAND THE FOOD SERVICE PROGRAM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 300

EQUIPMENT 50

TOTAL FUNDING AGS B 400 B

 

48.02. RED HILL ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO INSTALL AIR CONDITIONING IN THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 15

CONSTRUCTION 135

TOTAL FUNDING AGS B 150 B

 

 

[49. ROOSEVELT HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR AN AIR CONDITIONING SYSTEM FOR BUILDING A; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 450

TOTAL FUNDING AGS 500 B B]

49. P30043 ROOSEVELT HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR AN AIR CONDITIONING SYSTEM FOR BUILDING A; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 50

CONSTRUCTION 450

TOTAL FUNDING AGS 500 B B

 

[50. ROOSEVELT HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION OF BUILDING A; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 2,498

EQUIPMENT 1

TOTAL FUNDING AGS 2,500 B B]

 

50. 146A60 ROOSEVELT HIGH SCHOOL, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION OF BUILDING A; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 2,498

EQUIPMENT 1

TOTAL FUNDING AGS 2,500 B B

 

[51. SALT LAKE ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO RENOVATE BUILDING E TO CREATE MORE CLASSROOMS AND RELATED IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 83

CONSTRUCTION 437

TOTAL FUNDING AGS 520 B B]

51. P30045 SALT LAKE ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION TO RENOVATE BUILDING E TO CREATE MORE CLASSROOMS AND RELATED IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 83

CONSTRUCTION 437

TOTAL FUNDING AGS 520 B B

 

 

[52. SHAFTER ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR ADDITIONAL PARKING STALLS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 15

CONSTRUCTION 75

TOTAL FUNDING AGS 90 B B]

52. P30046 SHAFTER ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR ADDITIONAL PARKING STALLS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 15

CONSTRUCTION 75

TOTAL FUNDING AGS 90 B B

 

52.01. STEVENSON MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR A RETAINING WALL AT AUWAIOLIMU STREET; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 75

CONSTRUCTION 425

TOTAL FUNDING AGS B 500 B

 

 

52.02. SUNSET BEACH ELEMENTARY SCHOOL, OAHU

DESIGN FOR A NEW ADMINISTRATION BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 100

TOTAL FUNDING AGS B 100 B

 

52.03. WAHIAWA ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE RENOVATION OF ADMINISTRATION OFFICES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 149

CONSTRUCTION 1

TOTAL FUNDING AGS B 150 B

 

[53. WAIAKEA HIGH SCHOOL, HAWAII

PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS TO THE TRACK, INCLUDING INSTALLATION OF AN ALL WEATHER TRACK AND FIELD IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 100

DESIGN 250

CONSTRUCTION 2,450

TOTAL FUNDING AGS 2,800 B B]

 

53. P30047 WAIAKEA HIGH SCHOOL, HAWAII

PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS TO THE TRACK, INCLUDING INSTALLATION OF AN ALL WEATHER TRACK AND FIELD IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 100

DESIGN 250

CONSTRUCTION 2,450

TOTAL FUNDING AGS 2,800 B B

 

54. 272051 WAIANAE HIGH SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 4,800

EQUIPMENT 100

TOTAL FUNDING AGS 4,900 B B

54.01. WAIANAE HIGH SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR PERMANENT BLEACHERS ON THE VISITORS SIDE OF THE FOOTBALL FIELD; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 67

CONSTRUCTION 745

TOTAL FUNDING AGS B 812 B

 

 

[55. WAIKELE ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE EXTENSION OF THE PARKING LOT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 15

CONSTRUCTION 110

TOTAL FUNDING AGS 125 B B]

55. P30048 WAIKELE ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE EXTENSION OF THE PARKING LOT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 15

CONSTRUCTION 110

TOTAL FUNDING AGS 125 B B

 

[56. WAIMEA HIGH SCHOOL, KAUAI

DESIGN AND CONSTRUCTION OF NEW LOCKER ROOMS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 799

TOTAL FUNDING AGS 800 B B]

 

56. P30049 WAIMEA HIGH SCHOOL, KAUAI

DESIGN AND CONSTRUCTION OF NEW LOCKER ROOMS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 1

CONSTRUCTION 799

TOTAL FUNDING AGS 800 B B

 

[57. WAIMEA MIDDLE SCHOOL, HAWAII

PLANS AND DESIGN FOR THE FIRST AND SECOND INCREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1,000

DESIGN 1,000

TOTAL FUNDING AGS 2,000 B B]

57. P30050 WAIMEA MIDDLE SCHOOL, HAWAII

PLANS AND DESIGN FOR THE FIRST AND SECOND INCREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1,000

DESIGN 1,000

TOTAL FUNDING AGS 2,000 B B

 

 

57.01. WAIPAHU ELEMENTARY SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 400

CONSTRUCTION 3,000

TOTAL FUNDING AGS B 3,400 B

 

58. 277251 WAIPAHU HIGH SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 4,750

EQUIPMENT 100

TOTAL FUNDING AGS 4,850 B B

[59. WAIPAHU INTERMEDIATE SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR A CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 3,199

EQUIPMENT 1

TOTAL FUNDING AGS 3,200 B B]

 

59. 278451 WAIPAHU INTERMEDIATE SCHOOL, OAHU

CONSTRUCTION AND EQUIPMENT FOR A CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 3,199

EQUIPMENT 1

TOTAL FUNDING AGS 3,200 B B

 

[60. WASHINGTON MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE REPLACEMENT OF THE BELL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 20

CONSTRUCTION 150

TOTAL FUNDING AGS 170 B B]

60. P30052 WASHINGTON MIDDLE SCHOOL, OAHU

DESIGN AND CONSTRUCTION FOR THE REPLACEMENT OF THE BELL SYSTEM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 20

CONSTRUCTION 150

TOTAL FUNDING AGS 170 B B

 

 

AGS807 - PHYSICAL PLANT OPERATIONS AND MAINTENANCE - AGS

[61. CSD03 LUMP SUM CIP - SCHOOL BUILDING IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC SCHOOL FACILITIES, STATEWIDE. MAY INCLUDE PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES, ROOFING, AIR CONDITIONING, PAINTING, PLUMBING, AND OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC SCHOOL FACILITIES.

DESIGN 5,000 2,000

CONSTRUCTION 30,000 5,000

TOTAL FUNDING AGS 35,000 C 7,000 C]

61. CSD03 LUMP SUM CIP - SCHOOL BUILDING IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC SCHOOL FACILITIES, STATEWIDE. MAY INCLUDE PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES, ROOFING, AIR CONDITIONING, PAINTING, PLUMBING, AND OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC SCHOOL FACILITIES.

DESIGN 5,000

CONSTRUCTION 30,000

TOTAL FUNDING AGS 35,000 C C

 

 

EDN407 - PUBLIC LIBRARIES

[62. 01-H&S HEALTH AND SAFETY, STATEWIDE

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR HEALTH, SAFETY, ACCESSIBILITY, AND OTHER CODE REQUIREMENTS. PROJECT MAY INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL OF HAZARDOUS MATERIALS, RENOVATIONS FOR LIBRARY PATRONS AND EMPLOYEES, ENVIRONMENTAL CONTROLS, FIRE PROTECTION, IMPROVEMENTS TO BUILDING AND GROUNDS, AND OTHER RELATED WORK.

PLANS 45

DESIGN 150

CONSTRUCTION 800

EQUIPMENT 5

TOTAL FUNDING AGS 1,000 C C]

 

62. 01-H&S HEALTH AND SAFETY, STATEWIDE

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR HEALTH, SAFETY, ACCESSIBILITY, AND OTHER CODE REQUIREMENTS. PROJECT MAY INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL OF HAZARDOUS MATERIALS, RENOVATIONS FOR LIBRARY PATRONS AND EMPLOYEES, ENVIRONMENTAL CONTROLS, FIRE PROTECTION, IMPROVEMENTS TO BUILDING AND GROUNDS, AND OTHER RELATED WORK. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 45 100

DESIGN 150 400

CONSTRUCTION 800 1,400

EQUIPMENT 5 100

TOTAL FUNDING AGS 1,000 C 2,000 C

 

[63. KAPAA PUBLIC LIBRARY, KAUAI

PLANS AND DESIGN FOR THE EXPANSION OF THE LIBRARY.

PLANS 1

DESIGN 49

TOTAL FUNDING AGS 50 C C]

63. P30053 KAPAA PUBLIC LIBRARY, KAUAI

PLANS AND DESIGN FOR THE EXPANSION OF THE LIBRARY.

PLANS 1

DESIGN 49

TOTAL FUNDING AGS 50 C C

 

 

[64. MANOA PUBLIC LIBRARY, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE EXPANSION AND IMPROVEMENT OF THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1

LAND 50

DESIGN 49

CONSTRUCTION 400

TOTAL FUNDING AGS 500 C C]

64. P30054 MANOA PUBLIC LIBRARY, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE EXPANSION AND/OR REPLACEMENT OF THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS 1 100

LAND 50

DESIGN 49 450

CONSTRUCTION 400 2,950

TOTAL FUNDING AGS 500 C 3,500 C

 

UOH100 - UNIVERSITY OF HAWAII, MANOA

65. 693 UHM, USDA FRUIT FLY FACILITY IN WAIMANALO, OAHU

CONSTRUCTION FOR THE USDA FRUIT FLY FACILITY IN WAIMANALO. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

CONSTRUCTION 10,000

TOTAL FUNDING UOH 10,000 N N

 

[66. UHM, MAKAI ATHLETIC TRAINING ROOM, RENOVATION AND EXPANSION, OAHU

CONSTRUCTION AND EQUIPMENT FOR THE MAKAI ATHLETIC TRAINING ROOM RENOVATION AND EXPANSION; EQUIPMENT AND APPURTENANCES.

CONSTRUCTION 114

EQUIPMENT 1

TOTAL FUNDING UOH 115 C C]

66. 298 UHM, MAKAI ATHLETIC TRAINING ROOM, RENOVATION AND EXPANSION, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE MAKAI ATHLETIC TRAINING ROOM RENOVATION AND EXPANSION; EQUIPMENT AND APPURTENANCES.

DESIGN 10

CONSTRUCTION 114 110

EQUIPMENT 1

TOTAL FUNDING UOH 115 C 120 C

 

UOH210 - UNIVERSITY OF HAWAII, HILO

67. 448 UHH, STUDENT LIFE AND EVENTS COMPLEX, HAWAII

DESIGN FOR THE STUDENT LIFE AND EVENTS COMPLEX. PROJECT MAY INCLUDE PARKING FACILITIES AND THE RELOCATION OF PROGRAMS AFFECTED BY THIS PROJECT.

DESIGN 1,260

TOTAL FUNDING UOH 1,260 C C

 

[68. UHH, PACIFIC AQUACULTURE AND COASTAL RESOURCES CENTER, HAWAII

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS FOR THE PACIFIC AQUACULTURE AND COASTAL RESOURCES CENTER. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1

CONSTRUCTION 1,998

EQUIPMENT 1

TOTAL FUNDING UOH 2,000 C C]

68. 698 UHH, PACIFIC AQUACULTURE AND COASTAL RESOURCES CENTER, HAWAII

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS FOR THE PACIFIC AQUACULTURE AND COASTAL RESOURCES CENTER. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

DESIGN 1

CONSTRUCTION 1,998

EQUIPMENT 1

TOTAL FUNDING UOH 2,000 C C

 

 

68.01. UHH, NORTH HAWAII RESEARCH AND EDUCATION CENTER, PHASE II, HAWAII

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR RENOVATIONS AND IMPROVEMENTS FOR THE NORTH HAWAII RESEARCH AND EDUCATION CENTER.

PLANS 1

DESIGN 430

CONSTRUCTION 3,268

EQUIPMENT 1

TOTAL FUNDING UOH C 3,700 C

 

68.02. UHH, PHARMACY BUILDING, HAWAII

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A PHARMACY BUILDING AT THE UNIVERSITY OF HAWAII AT HILO. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 175

DESIGN 1,666

CONSTRUCTION 15,071

EQUIPMENT 1,493

TOTAL FUNDING UOH N 18,405 N

 

 

68.03. UHH, KOMOHANA RESEARCH AND OUTREACH CENTER, HAWAII

DESIGN, CONSTRUCTION, AND EQUIPMENT TO RENOVATE EXISTING SPACE TO CREATE LABORATORIES, LABORATORY SUPPORT SPACES, CONFERENCE ROOMS, CLASSROOMS, AND OFFICES; AND BUILD REPLACEMENT GREENHOUSES AND SUPPORT SPACES FOR GREENHOUSES FOR THE KOMOHANA RESEARCH AND OUTREACH CENTER IN HILO.

DESIGN 1,535

CONSTRUCTION 5,714

EQUIPMENT 1

TOTAL FUNDING UOH C 7,250 C

 

UOH800 - UNIVERSITY OF HAWAII, COMMUNITY COLLEGES

[69. KAP, CANNON CLUB SITE DEVELOPMENT, OAHU

PLANS, LAND ACQUISITION, AND DESIGN FOR THE DEVELOPMENT OF THE CANNON CLUB SITE FOR THE CULINARY ARTS PROGRAM AT KAPIOLANI COMMUNITY COLLEGE.

PLANS 148

LAND 1

DESIGN 1

TOTAL FUNDING UOH 150 C C]

 

69. B42 KAP, CANNON CLUB SITE DEVELOPMENT, OAHU

PLANS, LAND ACQUISITION, AND DESIGN FOR THE DEVELOPMENT OF THE CANNON CLUB SITE FOR THE CULINARY ARTS PROGRAM AT KAPIOLANI COMMUNITY COLLEGE.

PLANS 148

LAND 1

DESIGN 1

TOTAL FUNDING UOH 150 C C

 

[70. LEE, FOOD SERVICES PROGRAM, PHASE II, OAHU

DESIGN FOR THE RENOVATION AND EXPANSION OF THE DINING ROOM FOR THE CULINARY ARTS PROGRAM.

DESIGN 150

TOTAL FUNDING UOH 150 C C]

70. L27 LEE, FOOD SERVICES PROGRAM, PHASE II, OAHU

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION AND EXPANSION OF THE DINING ROOM FOR THE CULINARY ARTS PROGRAM.

DESIGN 150 1

CONSTRUCTION 1,421

EQUIPMENT 250

TOTAL FUNDING UOH 150 C 1,672 C

 

 

70.01. MAU, STUDENT SERVICES BUILDING RENOVATION, MAUI

DESIGN AND CONSTRUCTION FOR THE RENOVATION OF THE STUDENT SERVICES BUILDING.

DESIGN 1

CONSTRUCTION 3,499

TOTAL FUNDING UOH C 3,500 C

 

70.02. KAU, AIR CONDITIONING PLANT RENOVATION, KAUAI

DESIGN AND CONSTRUCTION FOR THE RENOVATION OF THE AIR CONDITIONING PLANT AT KAUAI COMMUNITY COLLEGE.

DESIGN 25

CONSTRUCTION 325

TOTAL FUNDING UOH C 350 C

 

70.03. KAU, SECOND ACCESS ROAD, KAUAI

DESIGN AND CONSTRUCTION FOR THE EXTENSION OF THE EXISTING ACCESS ROAD TO CONNECT WITH KAUMUALII HIGHWAY AT THE INTERSECTION WITH NUHOU STREET.

DESIGN 35

CONSTRUCTION 315

TOTAL FUNDING UOH C 250 C

UOH R 100 R

 

 

UOH900 - UNIVERSITY OF HAWAII, SYSTEM WIDE SUPPORT

[71. 521 SYS, INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR INFRASTRUCTURE AND RELATED IMPROVEMENTS AT UNIVERSITY CAMPUSES, SYSTEMWIDE.

DESIGN 420

CONSTRUCTION 7,417

TOTAL FUNDING UOH 7,837 C C]

71. 521 SYS, INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

PLANS, DESIGN AND CONSTRUCTION FOR INFRASTRUCTURE AND RELATED IMPROVEMENTS AT UNIVERSITY CAMPUSES, SYSTEMWIDE.

PLANS 106

DESIGN 420 121

CONSTRUCTION 7,417 1,212

TOTAL FUNDING UOH 7,837 C 1,439 C

 

[72. 536 SYS, HEALTH, SAFETY, AND CODE REQUIREMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR MODIFICATIONS TO EXISTING FACILITIES AND/OR CONSTRUCTION OF NEW FACILITIES FOR HEALTH, SAFETY, AND CODE REQUIREMENTS.

DESIGN 51

CONSTRUCTION 3,266

TOTAL FUNDING UOH 3,317 C C]

 

72. 536 SYS, HEALTH, SAFETY, AND CODE REQUIREMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR MODIFICATIONS TO EXISTING FACILITIES AND/OR CONSTRUCTION OF NEW FACILITIES FOR HEALTH, SAFETY, AND CODE REQUIREMENTS.

DESIGN 51 1

CONSTRUCTION 3,266 379

TOTAL FUNDING UOH 3,317 C 380 C

 

[73. 537 SYS, FIRE SAFETY CODE COMPLIANCE, STATEWIDE

DESIGN AND CONSTRUCTION FOR FIRE SAFETY SYSTEMS. PROJECT MAY INCLUDE FIRE ALARM SYSTEMS, FIRE DETECTION SYSTEMS, FIRE SPRINKLER SYSTEMS, CENTRAL FIRE ALARM SYSTEMS, AND ALL OTHER FIRE SAFETY IMPROVEMENTS, SYSTEMWIDE.

DESIGN 626

CONSTRUCTION 2,349 1,910

TOTAL FUNDING UOH 2,975 C 1,910 C]

 

73. 537 SYS, FIRE SAFETY CODE COMPLIANCE, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR FIRE SAFETY SYSTEMS. PROJECT MAY INCLUDE FIRE ALARM SYSTEMS, FIRE DETECTION SYSTEMS, FIRE SPRINKLER SYSTEMS, CENTRAL FIRE ALARM SYSTEMS, AND ALL OTHER FIRE SAFETY IMPROVEMENTS, SYSTEMWIDE.

DESIGN 626 88

CONSTRUCTION 2,349 2,470

EQUIPMENT 1

TOTAL FUNDING UOH 2,975 C 2,559 C

 

[74. 541 SYS, CAPITAL RENEWAL AND DEFERRED MAINTENANCE, STATEWIDE

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE CAPITAL RENEWAL AND DEFERRED MAINTENANCE PROJECTS AT THE UNIVERSITY OF HAWAII. PROJECT TO INCLUDE REROOFING, MECHANICAL AND ELECTRICAL SYSTEMS, RENOVATIONS, RESURFACING, REPAINTING, AND OTHER REPAIRS AND PROJECT COSTS TO UPGRADE FACILITIES AT ALL UNIVERSITY CAMPUSES.

PLANS 50 50

DESIGN 400 400

CONSTRUCTION 4,545 4,545

EQUIPMENT 5 5

TOTAL FUNDING UOH 5,000 C 5,000 C]

 

74. 541 SYS, CAPITAL RENEWAL AND DEFERRED MAINTENANCE, STATEWIDE

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE CAPITAL RENEWAL AND DEFERRED MAINTENANCE PROJECTS AT THE UNIVERSITY OF HAWAII. PROJECT TO INCLUDE REROOFING, MECHANICAL AND ELECTRICAL SYSTEMS, RENOVATIONS, RESURFACING, REPAINTING, AND OTHER REPAIRS AND PROJECT COSTS TO UPGRADE FACILITIES AT ALL UNIVERSITY CAMPUSES.

PLANS 50 400

DESIGN 400 3,600

CONSTRUCTION 4,545 25,995

EQUIPMENT 5 5

TOTAL FUNDING UOH 5,000 C 30,000 C

 

 

H. CULTURE AND RECREATION

LNR806 - PARKS ADMINISTRATION AND OPERATION

[1. F07 LUMP SUM CIP, STATE PARK FACILITY IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE REMOVAL OF CESSPOOLS AND IMPROVEMENTS AND RENOVATIONS TO PARK FACILITIES TO INCLUDE SEWAGE DISPOSAL SYSTEMS, UPGRADE OF FACILITIES, AND OTHER RELATED IMPROVEMENTS.

DESIGN 50

CONSTRUCTION 450 500

TOTAL FUNDING LNR 500 C 500 C]

1. F07 LUMP SUM CIP, STATE PARK FACILITY IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE REMOVAL OF CESSPOOLS AND IMPROVEMENTS AND RENOVATIONS TO PARK FACILITIES TO INCLUDE SEWAGE DISPOSAL SYSTEMS, UPGRADE OF FACILITIES, AND OTHER RELATED IMPROVEMENTS.

DESIGN 50 10

CONSTRUCTION 450 9,490

TOTAL FUNDING LNR 500 C 9,500 C

 

 

1.01. H10 LUMP SUM CIP, STATE PARKS COMFORT STATIONS IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE REPLACEMENT OF OUTDATED COMFORT STATIONS AND RECONSTRUCTION OF COMFORT STATIONS BY UPGRADING THEM TO CURRENT STANDARDS.

DESIGN 500

CONSTRUCTION 4,500

TOTAL FUNDING LNR C 5,000 C

 

1.02. KEOLANAHIHI STATE PARK, HAWAII

LAND ACQUISITION TO EXPAND THE KEOLANAHIHI STATE HISTORICAL PARK.

LAND 600

TOTAL FUNDING LNR C 600 C

 

LNR801 - OCEAN-BASED RECREATION

2. 299B IMPROVEMENTS TO HARBOR FACILITIES, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION OF REPAIRS/IMPROVEMENTS AT VARIOUS BOATING FACILITIES THROUGHOUT THE STATE TO INCLUDE DREDGING, PAVING, UTILITIES, AND OTHER BERTHING AND SHORE FACILITIES INCLUDING BOAT RAMPS.

PLANS 10 10

DESIGN 20 20

CONSTRUCTION 120 120

TOTAL FUNDING LNR 150 D 150 D

 

3. 299C IMPROVEMENTS TO BOAT RAMP FACILITIES, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION FOR REPAIRS AND IMPROVEMENTS TO VARIOUS BOAT RAMP FACILITIES STATEWIDE, INCLUDING DREDGING, PAVING, UTILITIES, LOADING DOCKS, COMFORT STATIONS, AND OTHER FACILITIES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 50 50

DESIGN 50 50

CONSTRUCTION 400 400

TOTAL FUNDING LNR 125 C 125 C

LNR 375 N 375 N

4. 310K COMFORT STATION/SEWER IMPROVEMENTS TO BOATING FACILITIES, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION OF NEW COMFORT STATIONS AND REPLACEMENT OF EXISTING DETERIORATED COMFORT STATIONS THROUGHOUT THE STATE, INCLUDING SITE PREPARATION, SEWER IMPROVEMENTS, UTILITIES, AND PARKING FACILITIES.

PLANS 25 25

DESIGN 25 25

CONSTRUCTION 450 450

TOTAL FUNDING LNR 500 D 500 D

 

5. 320A KEEHI BOAT HARBOR, REPLACEMENT OF PIERS 100 AND 200, OAHU

PLANS AND DESIGN FOR THE REPLACEMENT OF DETERIORATED PIERS 100 AND 200.

PLANS 95

DESIGN 190

TOTAL FUNDING LNR 285 D D

6. 340F HALEIWA BOAT HARBOR IMPROVEMENTS, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR THE REPAIR OF DETERIORATED FACILITIES AND NEEDED IMPROVEMENTS.

PLANS 65

DESIGN 135

CONSTRUCTION 265

TOTAL FUNDING LNR 465 D D

6.01. 246B LAHAINA BOAT HARBOR COMFORT STATION REPLACEMENT, MAUI

CONSTRUCTION FOR THE REPLACEMENT OF THE DETERIORATED COMFORT STATION AT LAHAINA BOAT HARBOR.

CONSTRUCTION 900

TOTAL FUNDING LNR C 500 C

LNR N 400 N

 

 

6.02. 299E DBOR - IMPROVEMENTS TO HARBOR FACILITIES, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION OF REPAIRS/IMPROVEMENTS AT VARIOUS EXISTING BOATING FACILITIES THROUGHOUT THE STATE INCLUDING DREDGING, PAVING, UTILITIES, AND OTHER BERTHING AND SHORE FACILITIES INCLUDING BOAT RAMPS.

PLANS 250

DESIGN 500

CONSTRUCTION 8,250

TOTAL FUNDING LNR E 9,000 E

 

6.03. HANA RAMP AND WHARF, MAUI

DESIGN AND CONSTRUCTION FOR REPAIRS AND IMPROVEMENTS FOR THE HANA RAMP AND WHARF.

DESIGN 150

CONSTRUCTION 850

TOTAL FUNDING LNR E 1,000 E

 

6.04. MAALAEA SMALL BOAT HARBOR, MAUI

PLANS, DESIGN, AND CONSTRUCTION FOR THE REPAIR AND IMPROVEMENT OF THE PIERS AND ELECTRICAL SYSTEM AND THE INSTALLATION OF A PUMP-OUT FACILITY.

PLANS 35

DESIGN 35

CONSTRUCTION 700

TOTAL FUNDING LNR C 770 C

 

 

6.05. WAIANAE SMALL BOAT HARBOR, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR REPAIRS AND IMPROVEMENTS TO THE CONCRETE PIERS AND FINGER PIERS.

PLANS 20

DESIGN 30

CONSTRUCTION 450

TOTAL FUNDING LNR C 500 C

 

AGS889 - SPECTATOR EVENTS AND SHOWS - ALOHA STADIUM

7. SA0004 ALOHA STADIUM, PROCURE AIR BEARINGS FOR MOVABLE STANDS AND PEDESTRIAN BRIDGES, OAHU

EQUIPMENT FOR PROCURING NEW AIR BEARINGS FOR THREE OF THE MOVABLE STANDS AND EACH OF THE FOUR PEDESTRIAN BRIDGE SYSTEMS OF THE ALOHA STADIUM.

EQUIPMENT 650

TOTAL FUNDING AGS 650 B B

8. SA0006 ALOHA STADIUM, FIELD TURF REPLACEMENT, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT TO INSTALL FIELD TURF AND ASSOCIATED SUPPORT COMPONENTS.

PLANS 1

DESIGN 1

CONSTRUCTION 297

EQUIPMENT 1

TOTAL FUNDING AGS 300 C C

 

9. SA0005 PLANS FOR A NEW STADIUM, OAHU

PLANS FOR ADVANCED PLANNING INCLUDING BUT NOT LIMITED TO FUNCTIONAL NEEDS ASSESSMENT, AND AS APPLICABLE RESULTANT SITE SELECTION AND ASSOCIATED ENVIRONMENTAL PLANNING.

PLANS 300

TOTAL FUNDING AGS C 300 C

9.01. SA2004001 ALOHA STADIUM, REPLACE TELEPHONE SYSTEM, OAHU

DESIGN AND CONSTRUCTION TO REPLACE DETERIORATED COMMUNICATION HARDWARE AND CABLING, AND INSTALL A TELEPHONE SYSTEM THAT WILL SATISFY THE OPERATIONAL NEEDS OF THE ENTIRE STADIUM.

DESIGN 50

CONSTRUCTION 200

TOTAL FUNDING AGS C 250 C

 

9.02. SA2004004 ALOHA STADIUM, REPLACE TICKETING SYSTEM, OAHU

DESIGN AND CONSTRUCTION TO REPLACE TICKETING SYSTEM SOFTWARE AND HARDWARE.

DESIGN 10

CONSTRUCTION 240

TOTAL FUNDING AGS C 250 C

 

 

9.03. SA2004005 ALOHA STADIUM, INSTALL NETWORK CABLING AND UPGRADE INFORMATION TECHNOLOGY SYSTEM, OAHU

DESIGN AND CONSTRUCTION TO INSTALL NETWORK CABLING AND APPROPRIATE TRANSMISSION HARDWARE TO LINK THE TICKETING, SCOREBOARD, MAINTENANCE, GENERAL SERVICES, AND SECURITY OPERATIONS LOCATED AT THE NORTH END OF THE STADIUM, WITH THE PRIMARY NETWORK SYSTEM LOCATED AT THE ADMINISTRATIVE OFFICES ON THE SOUTH END OF THE STADIUM; AND REPLACE OBSOLETE AND FAILING COMPUTER AND INFORMATION TECHNOLOGY (IT) HARDWARE AND SOFTWARE SYSTEMS.

DESIGN 15

CONSTRUCTION 260

TOTAL FUNDING AGS C 275 C

 

 

I. PUBLIC SAFETY

PSD402 - HALAWA CORRECTIONAL FACILITY

0.01. 20021 HALAWA CORRECTIONAL FACILITY, LIFE SAFETY CODE IMPROVEMENTS, OAHU

DESIGN AND CONSTRUCTION FOR FIRE AND LIFE SAFETY CODE IMPROVEMENTS THROUGHOUT THE HALAWA CORRECTIONAL FACILITY.

DESIGN 125

CONSTRUCTION 5,835

TOTAL FUNDING AGS C 5,960 C

 

PSD403 - KULANI CORRECTIONAL FACILITY

1. 20025 KULANI CORRECTIONAL FACILITY, NEW SEWER SYSTEM, HAWAII

CONSTRUCTION FOR A NEW SEWER SYSTEM AT KULANI CORRECTIONAL FACILITY TO REPLACE EXISTING SYSTEM.

CONSTRUCTION 5,300

TOTAL FUNDING AGS 5,300 C C

PSD404 - WAIAWA CORRECTIONAL FACILITY

1.01. 20041 WAIAWA CORRECTIONAL FACILITY, WASTEWATER SYSTEM IMPROVEMENTS, OAHU

PLANS, DESIGN, AND CONSTRUCTION OF IMPROVEMENTS TO THE WASTEWATER SYSTEM TO REMEDY DEFICIENCIES.

PLANS 35

DESIGN 55

CONSTRUCTION 585

TOTAL FUNDING AGS C 675 C

 

 

1.02. 20042 WAIAWA CORRECTIONAL FACILITY, IMPROVEMENTS TO FACILITY POWER SYSTEM, OAHU

PLANS, DESIGN, AND CONSTRUCTION OF IMPROVEMENTS TO FACILITY POWER SYSTEM TO ADDRESS CHRONIC OUTAGES AND INCREASE SERVICE LOAD OF SECONDARY POWER SYSTEM.

PLANS 15

DESIGN 25

CONSTRUCTION 210

TOTAL FUNDING AGS C 250 C

 

PSD407 - OAHU COMMUNITY CORRECTIONAL CENTER

1.03. 20043 OAHU COMMUNITY CORRECTIONAL CENTER, NEW REPLACEMENT FACILITY, OAHU

PLANS AND LAND ACQUISITION FOR A NEW REPLACEMENT FACILITY FOR THE OAHU COMMUNITY CORRECTIONAL CENTER.

PLANS 1,375

LAND 125

TOTAL FUNDING AGS C 1,500 C

 

PSD408 - KAUAI COMMUNITY CORRECTIONAL CENTER

1.04. 20044 KAUAI COMMUNITY CORRECTIONAL CENTER, NEW REPLACEMENT FACILITY, KAUAI

PLANS AND LAND ACQUISITION FOR A NEW REPLACEMENT FACILITY FOR THE KAUAI COMMUNITY CORRECTIONAL CENTER.

PLANS 350

LAND 125

TOTAL FUNDING AGS C 475 C

 

 

PSD900 - GENERAL ADMINISTRATION

1.05. P20025 PROGRAM PLANNING AND CORRECTIONAL TREATMENT FACILITIES, STATEWIDE

PLANS FOR SYSTEMWIDE PROGRAM PLANNING AND DEVELOPMENT OF A NEW CORRECTIONAL TREATMENT FACILITY, STATEWIDE.

PLANS 1,000

TOTAL FUNDING AGS C 1,000 C

 

LNR810 - PREVENTION OF NATURAL DISASTERS

1.06. HALEIWA AND WAIALUA FLOOD MITIGATION, OAHU

PLANS TO STUDY VARIOUS OPTIONS PRIOR TO THE COMMENCEMENT OF THE ARMY CORPS OF ENGINEERS' PLANNED HELEMANO-PAUKAUILA-KAUKONAHUA WATERSHED MANAGEMENT PROJECT.

PLANS 100

TOTAL FUNDING LNR C 100 C

 

1.07. LAKE WILSON, FLOOD MITIGATION, OAHU

PLANS TO CONDUCT A STUDY OF FLOODING PROBLEMS CAUSED BY PEAK FLOWS FROM STORMS INTO LAKE WILSON; AN EXAMINATION OF APPROPRIATE DRAINAGE ALTERNATIVES; AND MITIGATION MEASURES TO LESSEN THE IMPACT OF URBANIZATION OF DOWNSTREAM WATERWAYS AND RELATED FLOOD PROBLEMS.

PLANS 300

TOTAL FUNDING LNR C 300 C

 

 

DEF110 - AMELIORATION OF PHYSICAL DISASTERS

2. C13 DISASTER WARNING AND COMMUNICATION DEVICES, STATEWIDE

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE INCREMENTAL ADDITION, REPLACEMENT, AND UPGRADE OF STATE CIVIL DEFENSE WARNING AND COMMUNICATIONS EQUIPMENT. THIS WILL EXPAND THE COVERAGE AND RELIABILITY OF THE WARNING AND CONTROL SYSTEM, AS WELL AS MODERNIZE AND ALLEVIATE SIREN COVERAGE GAP AREAS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1 1

LAND 1 1

DESIGN 85 85

CONSTRUCTION 1,003 1,003

EQUIPMENT 177 177

TOTAL FUNDING AGS 1,167 C 1,167 C

AGS 100 N 100 N

 

2.01. C14 STATE EMERGENCY OPERATIONS CENTER (EOC) REPLACEMENT FACILITY, PHASE I, OAHU

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A NEW EOC TO IMPROVE STATEWIDE EMERGENCY COMMUNICATIONS, DIRECTION, CONTROL, AND COORDINATION OF STATE AND COUNTY RESOURCES DURING EMERGENCIES AND DISASTERS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1

LAND 1

DESIGN 1,496

CONSTRUCTION 1

EQUIPMENT 1

TOTAL FUNDING AGS C 375 C

AGS N 1,125 N

 

2.02. LAKE WILSON, LOCAL FLOOD WARNING SYSTEM, OAHU

DESIGN AND CONSTRUCTION FOR STREAM GAUGES FOR A FLOOD WARNING SYSTEM FOR LAKE WILSON.

DESIGN 25

CONSTRUCTION 125

TOTAL FUNDING DEF C 75 C

DEF N 75 N

 

 

K. GOVERNMENT-WIDE SUPPORT

GOV100 - OFFICE OF THE GOVERNOR

1. G01 PROJECT ADJUSTMENT FUND, STATEWIDE

PLANS FOR THE ESTABLISHMENT OF A CONTINGENCY FUND FOR PROJECT ADJUSTMENT PURPOSES SUBJECT TO THE PROVISIONS OF THE APPROPRIATIONS ACT.

PLANS 1 1

TOTAL FUNDING GOV 1 C 1 C

BUF101 - PROGRAM PLANNING, ANALYSIS, AND BUDGETING

2. 00-01 HAWAIIAN HOME LANDS TRUST FUND, STATEWIDE

CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE HAWAIIAN HOME LANDS TRUST FUND TO SATISFY THE PROVISIONS OF ACT 14 SPSLH 1995.

CONSTRUCTION 30,000 30,000

TOTAL FUNDING BUF 30,000 C 30,000 C

[3. 00-02 STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND, STATEWIDE

CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND.

CONSTRUCTION 108,166 83,800

TOTAL FUNDING BUF 108,166 C 83,800 C]

 

3. 00-02 STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND, STATEWIDE

CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND.

CONSTRUCTION 108,166 229,233

TOTAL FUNDING BUF 108,166 C 229,233 C

 

[4. BISHOP MUSEUM, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION AND IMPROVEMENT OF THE BISHOP MUSEUM'S HAWAIIAN HALL COMPLEX. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 400

DESIGN 400

CONSTRUCTION 1,200 50

EQUIPMENT 1,950

TOTAL FUNDING AGS 2,000 C 2,000 C]

 

4. P30059 BISHOP MUSEUM, OAHU

PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE RENOVATION AND IMPROVEMENT OF THE BISHOP MUSEUM'S HAWAIIAN HALL COMPLEX. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS 400

DESIGN 400

CONSTRUCTION 1,200 50

EQUIPMENT 1,950

TOTAL FUNDING AGS 2,000 C 2,000 C

 

4.01. BISHOP MUSEUM, HAWAII

DESIGN AND CONSTRUCTION FOR THE BISHOP MUSEUM'S AMY B.H. GREENWELL VISITOR EDUCATION CENTER TO BE LOCATED IN CAPTAIN COOK, KONA, ON THE ISLAND OF HAWAII. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

DESIGN 100

CONSTRUCTION 400

TOTAL FUNDING BUF C 500 C

 

LNR101 - PUBLIC LANDS MANAGEMENT

5. E0302 DLNR HAZARDOUS WASTE MANAGEMENT PLAN, STATEWIDE

PLANS FOR DEVELOPMENT OF A HAZARDOUS WASTE MANAGEMENT PLAN FOR PUBLIC LANDS.

PLANS 250

TOTAL FUNDING LNR 250 B B

 

6. E0304 PLANNING FOR THE DEVELOPMENT OF PUBLIC LANDS, STATEWIDE

PLANS FOR MARKET ANALYSIS, FEASIBILITY STUDIES, MASTER PLANNING, ENVIRONMENTAL STUDIES, AND OTHER PLANNING ACTIVITIES FOR THE DEVELOPMENT OF UNDERUTILIZED PUBLIC LANDS STATEWIDE FOR THE PURPOSE OF INCREASED REVENUE GENERATION.

PLANS 500

TOTAL FUNDING LNR 500 B B

[7. OLD PUUNUI QUARRY SITE ROCKFALL MITIGATION, OAHU

PLANS, DESIGN, AND CONSTRUCTION TO MITIGATE ROCKFALL CONDITIONS ON STATE LANDS AT THE OLD PUUNUI QUARRY SITE IN NUUANU.

PLANS 100

DESIGN 155

CONSTRUCTION 2,600

TOTAL FUNDING LNR 2,855 B B]

 

7. P30060 OLD PUUNUI QUARRY SITE ROCKFALL MITIGATION, OAHU

PLANS, DESIGN, AND CONSTRUCTION TO MITIGATE ROCKFALL CONDITIONS ON STATE LANDS AT THE OLD PUUNUI QUARRY SITE IN NUUANU.

PLANS 100

DESIGN 155

CONSTRUCTION 2,600

TOTAL FUNDING LNR 255 B B

LNR C 2,600 C

 

[8. KOMO MAI DRIVE ROCKFALL MITIGATION, OAHU

PLANS, DESIGN, AND CONSTRUCTION TO MITIGATE ROCKFALL CONDITIONS ON STATE LANDS ABOVE KOMO MAI DRIVE.

PLANS 100

DESIGN 100

CONSTRUCTION 3,200

TOTAL FUNDING LNR 3,400 B B]

 

8. P30061 KOMO MAI DRIVE ROCKFALL MITIGATION, OAHU

PLANS, DESIGN, AND CONSTRUCTION TO MITIGATE ROCKFALL CONDITIONS ON STATE LANDS ABOVE KOMO MAI DRIVE.

PLANS 100

DESIGN 100

CONSTRUCTION 3,200

TOTAL FUNDING LNR 200 B B

LNR C 3,200 C

 

[9. WAIKIKI BEACH MAINTENANCE, OAHU

DESIGN AND CONSTRUCTION FOR BEACH MAINTENANCE AT WAIKIKI BEACH, INCLUDING WIDENING OF THE BEACH BY REPLENISHING THE SAND BETWEEN THE NORTH KUHIO BEACH GROIN AND THE KAPAHULU STORM DRAIN.

DESIGN 50

CONSTRUCTION 650

TOTAL FUNDING LNR 700 B B]

9. P30062 WAIKIKI BEACH MAINTENANCE, OAHU

DESIGN AND CONSTRUCTION FOR BEACH MAINTENANCE AT WAIKIKI BEACH, INCLUDING WIDENING OF THE BEACH BY REPLENISHING THE SAND BETWEEN THE NORTH KUHIO BEACH GROIN AND THE KAPAHULU STORM DRAIN.

DESIGN 50

CONSTRUCTION 650

TOTAL FUNDING LNR 700 B B

 

 

9.01. MOANALUA STREAM DREDGING, OAHU

PLANS, DESIGN, AND CONSTRUCTION FOR THE DREDGING OF MOANALUA STREAM FROM THE STREAM MOUTH TO THE VICINITY OF MOANALUA FREEWAY. PROJECT TO INCLUDE BATHY-MATRIC SURVEY TO DETERMINE STREAM DEPTHS.

PLANS 50

DESIGN 250

CONSTRUCTION 700

TOTAL FUNDING LNR C 500 C

LNR S 500 S

 

9.02. TRUST FOR PUBLIC LAND, MAUI

LAND ACQUISITION FOR 70 ACRES IN THE HANA DISTRICT FOR THE PROTECTION OF CULTURAL AND NATURAL RESOURCES FROM DEVELOPMENT AND TO ENSURE PUBLIC ACCESS. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

LAND 300

TOTAL FUNDING LNR C 100 C

LNR R 200 R

 

 

AGS221 - CONSTRUCTION

10. B101M HEALTH AND SAFETY REQUIREMENTS, STATEWIDE

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE MITIGATION/ELIMINATION OF CONDITIONS HAZARDOUS TO HEALTH AND SAFETY, INCLUDING THE REMOVAL OF HAZARDOUS MATERIALS AND/OR CORRECTIONS OF PHYSICAL CONDITIONS IN STATE FACILITIES TO MEET CURRENT CODE AND/OR SAFETY REQUIREMENTS, STATEWIDE.

DESIGN 45 45

CONSTRUCTION 200 200

EQUIPMENT 5 5

TOTAL FUNDING AGS 250 C 250 C

11. E109 CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF ACCOUNTING AND GENERAL SERVICES. PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENTS PROGRAM RELATED POSITIONS.

PLANS 7,496 7,496

LAND 1 1

DESIGN 1 1

CONSTRUCTION 1 1

EQUIPMENT 1 1

TOTAL FUNDING AGS 7,500 C 7,500 C

 

11.01. N101 KAILUA HIGH SCHOOL ACCESS ROAD, OAHU

PLANS, LAND ACQUISITION, AND DESIGN TO PROVIDE A NEW ACCESS ROAD TO KAILUA HIGH SCHOOL.

PLANS 100

LAND 100

DESIGN 600

TOTAL FUNDING AGS C 800 C

 

11.02. DEF07 RETROFIT PUBLIC BUILDINGS WITH HURRICANE PROTECTIVE MEASURES, STATEWIDE

PLANS, DESIGN, AND CONSTRUCTION TO RETROFIT PUBLIC BUILDINGS WITH HURRICANE PROTECTIVE MEASURES TO INCREASE THE NUMBER OF PUBLIC SHELTERS AVAILABLE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS 1

DESIGN 399

CONSTRUCTION 1,600

TOTAL FUNDING AGS N 2,000 N

 

 

AGS233 - BUILDING REPAIRS AND ALTERATIONS

12. CSD01 LUMP SUM CIP - PUBLIC BUILDING IMPROVEMENTS, STATEWIDE

DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC OFFICE BUILDINGS, STATEWIDE. PROJECT MAY INCLUDE ROOFING, AIR CONDITIONING, ELEVATOR, OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC FACILITIES.

DESIGN 200 200

CONSTRUCTION 800 800

TOTAL FUNDING AGS 1,000 C 1,000 C

SUB401 - COUNTY OF MAUI

12.01. BINHI AT ANI COMMUNITY CENTER, MAUI

CONSTRUCTION FOR THE BINHI AT ANI COMMUNITY CENTER.

CONSTRUCTION 350

TOTAL FUNDING COM C 350 C

 

SUB501 - COUNTY OF KAUAI

[13. ANTONE K. VIDINHA STADIUM COMPLEX, RUBBERIZED TRACK, KAUAI

DESIGN AND CONSTRUCTION FOR A 400 METER RUBBERIZED TRACK; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 60

CONSTRUCTION 800

TOTAL FUNDING COK 430 C C

COK 430 S S]

 

13. P30063 ANTONE K. VIDINHA STADIUM COMPLEX, RUBBERIZED TRACK, KAUAI

DESIGN AND CONSTRUCTION FOR A 400 METER RUBBERIZED TRACK; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

DESIGN 60

CONSTRUCTION 800

TOTAL FUNDING COK 430 C C

COK 430 S S

 

13.01. LIHUE SEWER SYSTEM IMPROVEMENTS, KAUAI

DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS TO THE LIHUE SEWER SYSTEM.

DESIGN 1

CONSTRUCTION 398

EQUIPMENT 1

TOTAL FUNDING COK C 400 C

 

13.02. ADOLESCENT RESIDENTIAL TREATMENT FACILITY, KAUAI

DESIGN AND CONSTRUCTION FOR AN ADOLESCENT RESIDENTIAL TREATMENT FACILITY ON KAUAI.

DESIGN 60

CONSTRUCTION 500

TOTAL FUNDING COK C 560C"

SECTION 6. Part V, Act 200, Session Laws of Hawaii 2003, is amended:

(1) By amending section 79 to read as follows:

"SECTION 79. Provided that of the special funds appropriation for airports administration (TRN 195), the sum of $1,750,000 for fiscal year 2003-2004 and the sum of [$1,750,000] $1,900,000 for fiscal year 2004-2005 shall be used for airports division capital improvements program staff costs, statewide."

(2) By amending section 80 to read as follows:

"SECTION 80. Provided that of the special funds appropriation for harbors administration (TRN 395), the sum of $750,000 for fiscal year 2003-2004 and the sum of [$750,000] $890,000 for fiscal year 2004-2005 shall be used for harbors division capital improvements program staff costs, statewide."

(3) By adding a new section to read as follows:

"SECTION 83.1. Provided that of the general obligation bond fund appropriation for public lands management (LNR 101), the sum of $500,000 for fiscal biennium 2003-2005 shall be used for the dredging of Moanalua Stream; and provided further that no funds shall be expended unless matched on 1:1 basis with funds from the City and County of Honolulu."

(4) By adding a new section to read as follows:

"SECTION 83.2. Provided that of the general obligation bond fund appropriation for public lands management (LNR 101), the sum of $100,000 for fiscal biennium 2003-2005 shall be used for land acquisition for 70 acres in Hana for the protection of cultural and natural resources from development; and provided further that no funds shall be expended unless matched on a 2:1 (private/state) basis with funds from private contributions."

(5) By adding a new section to read as follows:

"SECTION 101.1. Any law to the contrary notwithstanding, the appropriations under Act 316, Session Laws of Hawaii 1989, section 222, as amended and renumbered by Act 299, Session Laws of Hawaii 1990, section 6, in the amounts indicated or balances thereof, unallotted, allotted, encumbered, and unrequired, are hereby lapsed:

Item No. Amount (MOF)

G-151A $ 561,346 C"

(6) By adding a new section to read as follows:

"SECTION 101.2. Any law to the contrary notwithstanding, the appropriation under Act 7, Special Session Laws of Hawaii 1993, section 23, in the amount of $208,140 or balance thereof, unallotted, allotted, encumbered, and unrequired, is hereby lapsed."

(7) By adding a new section to read as follows:

"SECTION 101.3. Any law to the contrary notwithstanding, the appropriations under Act 328, Session Laws of Hawaii 1997, section 140A, as amended and renumbered by Act 116, Session Laws of Hawaii 1998, section 5, in the amounts indicated or balances thereof, unallotted, allotted, encumbered, and unrequired, are hereby lapsed:

Item No.    Amount (MOF)

G-110A 128,245 C

G-119 321,977 C

  K-3 $ 1,600,000 C"

(8) By adding a new section to read as follows:

"SECTION 101.4. Any law to the contrary notwithstanding, the appropriations under Act 91, Session Laws of Hawaii 1999, section 64, as amended and renumbered by Act 281, Session Laws of Hawaii 2000, section 5, in the amounts indicated or balances thereof, unallotted, allotted, encumbered, and unrequired, are hereby lapsed:

Item No. Amount (MOF)

G-74 $ 219,582 C

G-94 336,546 C

G-98A 510,190 C"

(9) By adding a new section to read as follows:

"SECTION 101.5. Any law to the contrary notwithstanding, the appropriations under Act 259, Session Laws of Hawaii 2001, section 91, as amended and renumbered by Act 3, Third Special Session Laws of Hawaii 2001, section 3, and as further amended and renumbered by Act 177, Session Laws of Hawaii 2002, section 5, in the amounts indicated or balances thereof, unallotted, allotted, encumbered, and unrequired, are hereby lapsed:

Item No. Amount (MOF)

A-14 $   400,000 C 

A-15A 500,000 C 

A-17C 1,400,000 C

E-2 196,276 C

G-30C 2,500,000 C 

G-33A 475,000 C 

G-33C 1,000,000 C 

G-36B 250,000 C 

G-40 200,000 C 

G-42 325,000 C 

G-42B 1,200,000 C 

G-42C 520,000 C 

G-43D 1,000,000 C 

G-45 1,400,000 C

G-46A 1,651,000 C

I-1 18,735,000 C

I-4A 1,200,000 C

K-11A 2,895,000 C"

SECTION 7. Part VII, Act 200, Session Laws of Hawaii 2003, is amended:

    1. By adding a new section to read as follows:

"SECTION 134.1. Provided that the governor shall submit a copy of any plan used to secure federal funds for the Compacts of Free Association to the legislature; and provided further that a copy of this plan shall be submitted to the legislature no later than ten days after it is submitted to the federal government."

(2) By adding a new section to read as follows:

"SECTION 145.1. Provided that of the general fund appropriation for legal services (ATG 100), the sum of $25,000, or so much thereof as necessary for fiscal year 2004-2005, may be expended at the discretion of the attorney general to host a meeting of the Conference of Western Attorneys General."

(3) By adding a new section to read as follows:

"SECTION 145.2. Provided that the department of budget and finance shall evaluate all executive branch agency contract expenditures for capital improvement program projects during fiscal year 2004 to determine whether the use of funds to contract services fall within the scope of the project title and description; provided further that the report shall include, but not be limited to, a complete list of capital improvement program projects under which expenditures were made organized by department, a list of contracts entered into, and the purpose and product derived of each expenditure; provided further that the department of budget and finance shall provide its policy used to ensure that expenditure of capital improvement program project funds are consistent with the purposes of the appropriation; and provided further that the director of budget and finance shall submit this report to the legislature no later than August 15, 2004."

(4) By adding a new section to read as follows:

"SECTION 145.3. Provided that the department of budget and finance shall post on its website all finance memorandums and executive memorandums on the same day that the memorandums are distributed; provided further that all attachments to the memorandums shall also be posted."

(5) By adding a new section to read as follows:

"SECTION 145.4. Provided that the director of finance shall provide a report to the legislature on progress made toward recovering funds erroneously paid to state employees for sick leave in excess of sick leave credits accumulated by the employees; provided further that the report shall include by not be limited to a breakdown of unrecovered balances by department and by means of financing; and provided further that this report shall be submitted to the legislature not later than thirty days prior to the convening of the 2005 regular session."

SECTION 8. MISCELLANEOUS. If any portion of this Act or its application to any person, entity, or circumstance is held to be invalid for any reason, then the legislature declares that the remainder of the Act and each and every other provision thereof shall not be affected thereby. If any portion of a specific appropriation is held to be invalid for any reason, the remaining portion shall be expended to fulfill the objective of such appropriation to the extent possible.

SECTION 9. In the event manifest clerical, typographical, or other mechanical errors are found in this Act, the governor is hereby authorized to correct such errors.

SECTION 10. Material to be repealed is bracketed and stricken. New statutory material is underscored. In printing this Act, the revisor of statutes need not include the bracketed material or the underscoring.

SECTION 11. Nothing in this Act shall affect the validity or continuing effectiveness of any provisions of Act 200, Session Laws of Hawaii 2003, not repealed or modified by this Act.

SECTION 12. EFFECTIVE DATE. This Act shall take effect upon its approval.