Measure Title: | RELATING TO UTILITY LINES. |
Report Title: | Utility Lines; Construction and Installation Moratorium |
Description: | Establishes a 3-year moratorium on the construction and installation of 138 kilovolt or greater high-voltage electric transmission lines or systems. |
Package: | None |
Companion: | |
Introducer(s): | TANIGUCHI |
Current Referral: | CPH |
Date | Status Text | |
---|---|---|
1/17/2003 | S | Introduced and passed First Reading. |
1/22/2003 | S | Referred to CPH. |
8/21/2003 | D | Carried over to 2004 Regular Session. |