Measure Title: | RELATING TO NET ENERGY METERING. |
Report Title: | Net Energy Producer; Payment By Utility |
Description: | Requires an electric utility to pay a customer-generator who is a net electricity producer for excess kilowatt hours at wholesale rates. Requires the customer-generator to install the necessary metering equipment. |
Package: | None |
Companion: | |
Introducer(s): | IHARA, FUKUNAGA |
Current Referral: | WLE, CPH |
Date | Status Text | |
---|---|---|
1/18/2002 | S | Introduced and passed First Reading. |
1/25/2002 | S | Referred to WLE, CPH. |
1/31/2002 | S | Bill scheduled to be heard by WLE on 02-04-02 at 2:00 pm in conference room 224. |
2/4/2002 | S | The committee(s) on WLE recommend(s) that the measure be HELD. |
2/4/2002 | S | The votes in WLE were as follows: 5 Aye(s): Senator(s) Inouye, Chun Oakland, Chun, Nakata, Hemmings; Aye(s) with reservations: none ; 0 No(es): none; and 4 Excused: Senator(s) English, Ihara, Kokubun, Matsunaga. |
$ = Appropriation measure
ConAm = Constitutional Amendment