Measure Title: | RELATING TO PUBLIC UTILITIES. |
Report Title: | Public Utilities; Ratemaking; Renewable Energy |
Description: | Mandates PUC in electric public utilities rate making to consider factors which influence an adequate supply of energy, encourage energy conservation, or encourage renewable energy development; and make findings on the utility's ability to recover its capital and operating costs. (HB447 HD1) |
Package: | None |
Companion: | |
Introducer(s): | THIELEN, CASE, Takumi, Schatz, Jaffe, B. Oshiro, Hale |
Current Referral: | EEP, CPC |
Date | Status Text | |
---|---|---|
1/23/2001 | H | Introduced |
1/25/2001 | H | Pass First Reading |
1/26/2001 | H | Referred to the committees on EEP, CPC, referral sheet 4. |
2/5/2001 | H | Bill scheduled to be heard by EEP on Tuesday, 02-13-01 at 8:30 AM in House conference room 312. |
2/13/2001 | H | The committees on EEP recomend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 7 Ayes: Rep.(s) Morita, Schatz, Hale, Kanoho, B. Oshiro, Jaffe, Thielen; Ayes with reservations: Rep.(s) Bukoski, Meyer; 0 Noes: None; and 1 Excused: Rep.(s) Ito. |
2/16/2001 | H | Reported from the committee on EEP (Stand. Com. Rep. No. 331)as amended in (HD 1), recommending passage on Second Reading and referral to the committee on CPC. |
2/20/2001 | H | Passed Second Reading as amended in (HD 1) and referred to the committee(s) on CPC with None voting no and Rep.(s) Case, Whalen excused. |
7/23/2001 | D | Carried over to 2002 Regular Session. |
$ = Appropriation measure
ConAm = Constitutional Amendment