REPORT TITLE:
CIP; 22nd Senatorial District


DESCRIPTION:
Appropriates funds for capital improvement projects in the
twenty-second senatorial district.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                        3135
THE SENATE                              S.B. NO.           
TWENTIETH LEGISLATURE, 2000                                
STATE OF HAWAII                                            
                                                             
________________________________________________________________
________________________________________________________________


                   A  BILL  FOR  AN  ACT

MAKING AN APPROPRIATION FOR THE TWENTY-SECOND SENATORIAL
   DISTRICT.


BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 1      SECTION 1.  The director of finance is authorized to issue
 
 2 general obligation bonds in the sum of $54,653,358, or so much
 
 3 thereof as may be necessary, for fiscal year 2000-2001, for the
 
 4 following capital improvements in the twenty-second senatorial
 
 5 district:
 
 6 1.   Haleiwa Elementary School, Oahu
 
 7      A.   Covered walkway between A & F Buildings
 
 8             and between cafeteria and
 
 9             administration building for all
 
10             regular and special education students
 
11             walking to and from buildings. 
 
12                Plans                        $1,000
 
13                Design                       $1,000
 
14                Construction                $58,000
 
15                Total funding                              $60,000
 
16      B.   Playground equipment and ground
 
17             surfacing for sixteen separate stand-
 
18             alone physical equipment units for
 
19             pre-school through sixth grade
 

 
Page 2                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1             children to be completed in two
 
 2             phases.
 
 3                Plans                        $7,000
 
 4                Design                       $7,000
 
 5                Construction                $27,000
 
 6                Equipment                   $59,000
 
 7                Ground surfacing            $86,000
 
 8                Total funding                             $186,000
 
 9 2.   Hale Kula Elementary School, Oahu
 
10      A.   Design and construction for the
 
11             expansion of the library.
 
12                Design                     $100,000
 
13                Construction             $1,100,000
 
14                Equipment                  $165,000
 
15                Total funding                           $1,365,000
 
16      B.   Design and construction for the
 
17             expansion of the administration
 
18             building.
 
19                Design                     $100,000
 
20                Construction             $1,100,000
 
21                Equipment                  $150,000
 
22                Total funding                           $1,350,000
 
23      C.   Replace toilets to power flush in
 

 
Page 3                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1             Buildings D, F, G, H, I, J.
 
 2                Design                      $20,000
 
 3                Construction                $80,000
 
 4                Total funding                             $100,000
 
 5 3.   Helemano Elementary School, Oahu
 
 6           Design and construct a library.
 
 7                Design                     $200,000
 
 8                Construction             $2,235,000
 
 9                Equipment                   $50,000
 
10                Total funding                           $2,485,000
 
11 4.   Iliahi Elementary School, Oahu
 
12      A.   Air conditioning for library.
 
13                Design                      $65,000               
 
14                Construction/Installation  $200,000
 
15                Total funding                             $265,000
 
16      B.   Design and construction for the
 
17             expansion of the parking lot; ground
 
18             and site improvements; and other
 
19             related work.
 
20                Plans                        $1,000
 
21                Design                      $30,000
 
22                Construction               $225,000
 
23                Total funding                             $256,000
 

 
Page 4                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1 5.   Kaala Elementary School, Oahu
 
 2      A.   Electrical upgrade to support additional
 
 3             equipment and classroom lighting needs
 
 4             to comply with federal law.
 
 5                Construction               $130,000
 
 6                Total funding                             $130,000
 
 7      B.   Construction and installation of air
 
 8             conditioning for library and computer
 
 9             center.
 
10                Design                      $10,300
 
11                Construction               $257,500
 
12                Equipment                  $206,000
 
13                Total funding                             $473,800
 
14 6.   Leilehua High School, Oahu
 
15      A.   Design and construction to convert the
 
16             old library into a culinary arts
 
17             academy.
 
18                Design                      $70,000
 
19                Construction               $400,000
 
20                Equipment                   $50,000
 
21                Total funding                             $520,000
 
22      B.   Design and construction of a covered
 
23             walkway between the library and
 

 
Page 5                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1             administration building.
 
 2                Design                       $1,000
 
 3                Construction                $69,000
 
 4                Total funding                              $70,000
 
 5 7.   Sunset Beach Elementary School, Oahu
 
 6           Design and construction of new
 
 7             administration building; renovation of
 
 8             existing temporary facilities to
 
 9             classroom; ground and site
 
10             improvements; equipment and
 
11             appurtenances.
 
12                Design                     $150,000
 
13                Construction             $1,950,000
 
14                Total funding                           $2,100,000
 
15 8.   Wahiawa Elementary, Oahu
 
16           Design and construction of air
 
17             conditioning for computer laboratory.
 
18                Design                      $32,000
 
19                Construction               $112,000
 
20                Total funding                             $144,000
 
21 9.   Waialua Elementary School, Oahu
 
22      A.   Design and construction for the
 
23             renovation and/or expansion of the
 

 
Page 6                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1             administration building to include
 
 2             space for the PCNC and other school
 
 3             programs and site improvements;
 
 4             equipment and appurtenances.
 
 5                Design                      $64,000
 
 6                Construction               $316,000
 
 7                Total funding                             $380,000
 
 8      B.   Design and construction for the
 
 9             renovation and/or expansion of the
 
10             cafeteria building to include space
 
11             for the A+ and other programs; ground
 
12             and site improvements; equipment and
 
13             appurtenances.
 
14                     Design                $125,000
 
15                     Construction          $885,000
 
16                     Total funding                      $1,010,000
 
17      C.   Playground equipment and ground
 
18             surfacing for pre-school through
 
19             second grade children
 
20                     Ground surfacing       $30,000
 
21                     Equipment              $80,000               
 
22                     Total funding                        $110,000
 
23 10.  Waialua Intermediate and High School, Oahu
 

 
Page 7                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1           Basefield.
 
 2                Construction of 
 
 3                dugouts and fencing         $61,800
 
 4                Foul line in-field fencing  $25,000
 
 5                Total funding                              $86,800
 
 6 11.  Design and construction of the training
 
 7             facilities of ORI, Anuenue Hale, Inc.
 
 8             Planning, design, and construction of
 
 9             facilities for ORI, Anuenue Hale, Inc;
 
10             programs and facilities to include
 
11             training centers and spaces for
 
12             support services such as services to
 
13             the economically disadvantaged,
 
14             displaced workers, fragile elderly,
 
15             and care for the disabled or
 
16             handicapped; program will integrate
 
17             care for the community under one roof.
 
18                Design                     $360,000
 
19                Construction             $2,620,000
 
20                Total funding                           $2,980,000
 
21 12.  Design and construction of Wahiawa civic
 
22             center.
 
23                Design                   $2,249,458
 

 
Page 8                                                     3135
                                     S.B. NO.           
                                                        
                                                        

 
 1                Construction            $37,490,960
 
 2                Off site improvements      $711,540
 
 3                Traffic improvements       $129,800
 
 4                Total funding                          $40,581,758
 
 5      TOTAL FUNDING                                    $54,653,358
 
 6      SECTION 2.  The appropriations made for capital improvement
 
 7 projects authorized in this Act shall not lapse at the end of the
 
 8 fiscal biennium for which the appropriation is made; provided
 
 9 that all appropriations which are unencumbered as of June 30,
 
10 2002, shall lapse as of that date.
 
11      SECTION 3.  The sum appropriated shall be expended for the
 
12 purposes of this Act; provided that:
 
13      (1)  The sums appropriated in items 1 to 10, and 12 of
 
14           section 1 of this Act shall be expended by the
 
15           department of accounting and general services; and
 
16      (2)  The sums appropriated in item 11 of section 1 of this
 
17           Act shall be expended by the department of labor and
 
18           industrial relations, office of community services.
 
19      SECTION 4.  This Act shall take effect on July 1, 2000.
 
20 
 
21                           INTRODUCED BY:  _______________________